電樞電級 的英文怎麼說
中文拼音 [diànshūdiànjí]
電樞電級
英文
armature terminal insulating bushing-
It showed that activated inhibition by weak noise could be gabaergic inhibition. from above the findings, we could give a hypothesis that the input of random oscillation induced by noise in the cochlea to central auditory system could be integrated in the central auditory nucleus and the response of sound - sensitive neuron to sound stimuli could be adjusted to an optimum state for signal intensity coding
根據這些變化可以推測,這種背景噪聲的生物學作用可能是通過弱噪聲所引起的耳蝸隨機共振的輸入,在上行過程中經各級聽覺核團的整合,將中樞聲敏感神經元調定在一種準備狀態,並定型放電率函數和調制神經元對聲馨碩士學位論文master 』 st砰iesis強的編碼。Classification design safety standard of hydropower projects
水電樞紐工程等級劃分及設計安全標準Question 13 : “ the 06 road network and its adjustment in the station terminus area ” file points out that the roads on both sides of the station terminus should be classified as a higher level of roads, so are the two roads zhongtian road and putian west road
問題13 :電子文件「 06樞紐地區路網及調整」中指出:樞紐站兩側道路提高級別,請問「兩側道路」是否指中興路和圃田西路?According to recording data of higher level monitor and control system when main motor drive system for four - high medium plate mill is operated, and relation between armature voltage of dc electromotor and ac input voltage of inverter, trip cause of dc fast automatic switch was analyzed in detail, and specific countermeasure and measures are given
根據中板四輥軋機主電機傳動系統運行時的上級監控系統記錄數據,以及直流電機電樞電壓與變流器交流側輸人電壓的關系,詳盡地分析了直流快速自動開關跳閘故障原因,並提出具體的對策及措施。These suggested that so2 may affect body immunity to a certain degree. ( 3 ) effects on mouse thymus of so2 challenge : he staining showed no obvious structure changes of thymus in all treatment groups compaired with the control group ; the ultrastructure of thymus can be seen injured in so2 treated groups from tem observation
( 3 )二氧化硫染毒對小鼠胸腺組織學結構影響較小:用透射電鏡觀察發現胸腺組織中有部分淋巴細胞變形且異染色質增多,胸腺上皮細胞中可見次級溶酶體增多,線粒體變形,這說明二氧化硫可能對中樞免疫器官也有一定的不良影響。Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )
高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。6. the three gorges reservoir officially began to store water as the sluice gate started to close at 00 : 00 on june 1. on july 10, the first power generator of the project, the largest of its kind in the world, was connected to the power grid to begin generating electricity
三峽水利樞紐6月1日開始下閘蓄水, 6月15日蓄至135米的初期蓄水位6月16日,雙線五級船閘開始試通航7月10日,第一臺發電機組比計劃提前20天並網發電。Shui buya hydro - hinge is the upest cock step of three - step cascade hydroelectric power stations from upstream to down stream on the middle low reach of the main course of qingjiang river, which is going to be developped by hubei qingjiang hydroelectric development ltd after constructing ge he yan and gao ba zhou hydroelectric power stations
水布埡水利樞紐是湖北清江水電開發有限責任公司繼隔河巖、高壩洲水電站之後,在清江中下游幹流上實施三級梯級開發的最上一級龍頭水電站工程。The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir
摘要黃河炳靈(寺溝峽)水電站是黃河幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈水電站(塔坪壩址)尾水斷面在劉家峽水庫不同運行方式下的水位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽水庫汛限水位,將電站樞紐選址在其電站庫尾內。分享友人