電站 的英文怎麼說

中文拼音 [diànzhàn]
電站 英文
power station電站船 generating ship
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. Stability analysis on adjoining rock of large - scale underground chamber group of suofengying hydropower station

    索風營水電站大型地下洞室群圍巖穩定分析
  2. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  3. In the unlikely event of a nuclear accident, one aerial survey team and two mobile survey teams can be deployed within an hour

    萬一核電站發生核事故,香港天文臺可在一小時內出動一隊空中巡測隊及兩隊流動巡測隊。
  4. Operation of air cushion surge chamber at ziyili hydropower station

    自一里電站氣墊式調壓室的運行
  5. Russia criticizes iranian air drills near nuclear plant

    俄羅斯批評伊朗在核電站附近舉行防空演習
  6. The products can meet the require of oil field, chemical, electricity, mining, alchemic environmental and the field of municipal construction

    公司生產的泵類產品廣泛應用於石油和天然氣、廠、核電站、石油化工、化肥、供水、廢水處理、紡織等眾多領域。
  7. Considering amendatory forecast runoff value will affect the operation strategy, a step - by - step decision method is proposed, which is useful for manager ' s making an optimized decision. the mid - long runoff forecast system of longxiriver is developed with the c + + language

    ( 5 )考慮徑流預測值修正後對水電站運行策略的影響,提出了水電站優化調度的滾動決策方法,為水電站及其水庫最優運行策略的採用提供依據。
  8. It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months

    樂灘電站從2001年10月底開始施工準備到2004年12月20日首臺機組投產發,僅用38個月的時間,比合理工期提前了7個月,並在此期間,搶回因廠壩部份地基巖溶地質問題延誤的5個月工期。
  9. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  10. The rolling axletree in the power plants may split during the long time running

    摘要火電站的發機組的滾動軸承由於在長時間的運行和碰撞中,有可能導致裂紋的產生。
  11. The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework

    三峽工程左岸電站水輪發機中性點接地方式的選擇應和發機100 %范圍定子一點接地保護相關聯。
  12. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。
  13. Steel pipe butt welding fittings for power plant

    電站鋼制對焊管件
  14. Guide on selection of butterfly valves for power plant

    電站蝶閥選用導則
  15. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  16. Simplified model for distillation tower of air separation unit in igcc plant by comparting method

    電站空分系統精餾塔的分段簡化模型
  17. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  18. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡水電站主變洞排風拱頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基元模型,並回歸得到了溪洛渡水電站主變洞排風拱頂各個排風「虛擬分支」風量均勻系數以及阻抗的計算公式。
  19. Experimental research on asphalt concrete impervious core wall for yele hydropower station

    冶勒水電站瀝青混凝土心墻防滲性能的試驗研究
  20. High - voltage low - voltage prefabricated cubical substation

    高壓低壓預裝箱式變電站選用導則
分享友人