電荷庫 的英文怎麼說

中文拼音 [diàn]
電荷庫 英文
charge reservoir
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 荷名詞(蓮) lotus
  1. The coulomb is then defined as the charge transported in one second by a current of one ampere.

    侖則定義為在一秒鐘內1安培流所傳輸的
  2. Why doesn't it fly apart under the coulomb repulsion of like-charge elements ?

    為什麼它不在同類元的侖排斥作用下散開呢?
  3. A 12-v automobile battery supplies 20 c of charge in 5 s to a stereo tape player.

    一個12伏汽車池在5秒鐘里供給立體聲錄音機20侖的
  4. At last, considering the running trait of hydraulic turbine in true power stations, combining the complex pipe line system, generating electri city, discharge flood all use of pan shi tou reservoir compute the unsteady transition process

    最後考慮了實際站水輪機組的運行特性,結合盤石頭水引水、發、泄洪共用的復雜引水系統,進行了站甩負引起的非恆定過渡過程計算。
  5. If the system is connected to real data, it will change the graphics automatically, namely, print the color of the net, analyse which part is electriferous, alert of loads

    系統可以通過數據介面和實時數據建立連接,自動對實時數據的變化作出反應,如:網路著色、帶分析、負報警等功能。
  6. It has high selectivity in adsorpting water, polar molecule or polarizable molecule on account of the existing of mighty coulomb field and polar interaction in the internal of crystal cave of zeolite, the high electric field gradient and the uneven surface caused by the exposure of exchangable cation of equilibrium framework negative charge in framework structures

    由於分子篩晶穴內部有強太原理工大學碩士學位論文摘要大的侖場和極性作用,再加上骨架中大量平衡骨架負的可交換陽離子的暴露造成的高場梯度及表面的不均性,使其對水、極性分子及可極化的分子具有高選擇的吸附性能。
  7. If the electric charges in the two stars are supposed to be equal, it can be calculated according to the kulun ' s theorem that 19100 nuclear unity masses must have one electron, such that the electromagnetic force produced can provide enough centrifugal force for the rotation

    假定兩星所帶的數量相等,根據侖定律,我們可以計算出,在兩星中平均每19100個原子單位質量,就必須帶有一個,所產生的靜引力才能夠提供足夠的向心力。
  8. The inner - plant economical operation of lijiaxia hydropower station is studied based on the disadvantageous operating mode area of the units determined by school of civil engineering of tianjin university and the actual operating experience of the lijiaxia hydropower station in the last a few years

    摘要以天津大學建築工程學院確定的李家峽水站機組的不利工況區為依據,以近幾年來該水站的實際運行經驗為參考,在綜合考慮機組初始運行狀態、機組振動特性、機組出力、下泄流量、水蓄水量和網負平衡等因素的基礎上對李家峽水站的廠內經濟運行進行了研究。
  9. The load, water, and power dispatching system model based on real - time information system sis for tianhuangping pumped - storage power station is introduced in the aspects of system design, development, and debugging

    摘要就天荒坪抽水蓄能站基於實時信息系統sis平臺的負、水調度、量系統模型的設計、建立、開發和調試工作進行了說明和介紹。
  10. The work done in pushing 1c of charge through the conducting wire is called the potential, v, of the battery.

    推動1通過導線所作的功叫做池的勢V。
  11. Application of pi database to load management system of quzhou power grid

    數據在衢州網負管理系統中的應用
  12. Software of electrical load modeling which including the interface between the actual load parameter database and psasp database is introduced in this thesis

    介紹了新近開發的河南網負特性數據的建立以及與力系統分析軟體psasp的數據介面軟體。
  13. The program of delphi can call the dynamic link library ( dll ) which is programmed beforehand. it can on - line estimate and correct soc in time. it can advance the precision of the estimation of brc and the capability of the energy management system, then satisfies the practical need of electric vehicles

    並且,在對池的狀態的預測採用了delphi和matlab混合編程的方法,在delphi中調用事先編好的動態連接( dll ) ,能實時在線的對池的狀態進行估計和校正,提高了池剩餘容量預測的精度,從而提高能量管理系統的性能,滿足動汽車的實用需求。
  14. By combining the advanced modern mathematical modeling theory with the advanced database application and development tools and software engineering, this paper proposes the new mathematical model, and through programming realizes the 24 - hour data forecasting of punctual load, daily peak - to - valley load and daily average load in the area

    本文將現代先進的數學建模理論與數據應用開發工具、軟體工程技術相結合,提出了適用該地區網負預報的數學模型,通過編程實現了該地區網24小時的正點負、日峰谷值負、日平均負等數據預報。
  15. In order to gather and analyse the load information automatically and promote the level and precision of distribution network plan, line loss analysis and operation mode adjustment, the data from distribution measuring devices, load supervising system and automatic message registering are centralized through mapping in dgis ( distributuin geography information system ) and other three systems

    摘要為實現對配網中負的自動採集和分析,以提高配網規劃、線損分析及運行方式調整的水平與精度,採用中心數據數據集中方式將配綜測儀、負控系統和抄表程序數據集中管理。
  16. In this thesis we mainly deal with the research on the performance optimization of data warehouse, including : the factor of the data warehouse performance, the performance optimization of data warehouse, the analysis and performance optimization of olap, at last, we use a example in the electric power system to show the practical application of ihe performance optimization in the data warehouse system

    基於對聯機分析處理系統olap的分析,研究了提高系統執行效率和響應速度的方法,並實現了一個數據倉性能優化的實例。論文的內容主要包括:影響數據倉性能的因素、數據倉的性能優化、 olap的性能分析和優化,對常用的星型模式和雪花模式提出了一種改進方案,論文的最後實現了一個用分析數據倉性能優化的應用實例。
  17. Thus clean factor has good adaptability to boiler load, coal quality, excess air coefficient, working medium flow, and boiler efficiency etc. the calculated result gained by inputting the data of history database of the object boiler validates the correctness and adaptability to boiler load of clean factor model

    基於穩態傳熱的清潔因子灰污監測模型,對鍋爐負、燃煤品質、過量空氣系數、各類工質流量、燃煤量和鍋爐熱效率等的波動變化有很好的適應性。以北侖廠1 #爐歷史中數據為輸入數據,驗證了清潔因子模型的正確性和對穩定負的適應性。
  18. A difference of statcoulombs existed between the magnitudes of each changes.

    這兩種的大小存在著靜的差別。
  19. < uk > a difference of statcoulombs existed between the magnitudes of each changes. < / uk >

    < uk >這兩種的大小存在著靜的差別。 < / uk >
  20. Finally, the electron mobility in 6h - sic inversion layers is studied by single - particle monte carlo technique. the simulation results fit the experimental data very well

    對6h sic反型層遷移率進行的moniecaro模擬結果表明,侖中心的相關性,量及中心和sic侶。
分享友人