電荷收集時間 的英文怎麼說

中文拼音 [diànshōushíjiān]
電荷收集時間 英文
charge collection time
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 荷名詞(蓮) lotus
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : gatherassemblecollect
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 收集 : collect; gather
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. When the flue gas and dust past through electrical fields, they caused impact with positive and negative ion and electron between electrical electrodes to charge electric. the charged particles move and are accumulated to difficult electrical electrode due to effect of electric field force. through rapping method, the dust leaves electric electrodes and drop into the collection hopper, and the remove the dust by transportation system

    是一種煙氣凈化設備,它的工作原理是:煙氣中灰塵塵粒通過高壓靜,與的正負離子和子發生碰撞而或在離子擴散運動中,帶上子和離子的塵粒在場力的作用下向異性極運動並積附在異性極上,通過振打等方式使極上的灰塵落入灰斗中,使通過除塵器的煙氣得到凈化,達到保護大氣,保護環境的目的。
  2. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )整理漫灣水站大壩運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大壩的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經網路非線性映射功能,建立了神經網路序列預測模型; 3 )以ansys軟體為平臺,開發了漫灣水站砼重力壩運行狀態評價模塊,結合載效應分析、參數反演分析、參數預測分析三個模塊組成漫灣水站砼重力壩運行狀態分析系統;實現了對漫灣水站運行狀態的動態「反演-預測」分析; 4 )利用漫灣水站砼重力壩運行狀態分析系統,在漫灣大壩實測資料分析、大壩砼特性參數反分析、大壩砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩運行狀態。
分享友人