電路順序 的英文怎麼說

中文拼音 [diànshùn]
電路順序 英文
co circuit order
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • 電路 : [訊] circuit (ckt); electric circuit; electrocircuit電路板 circuit board; 電路保持 guard of a c...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  1. In the process of arithmetic design, newton " method is used to compute power flow of network. graph theory knowledge is used to determine all paths from generator to load. to improve efficiency, thesis use branch expunction method to optimize the node order

    在演算法設計過程中,採用牛頓拉夫遜法進行潮流計算得到系統潮流分佈,利用圖論原理中的徑搜索演算法確定了發機對負荷的供徑,此外為了提高潮流跟蹤的計算效率,利用了支消去法進行節點的優化。
  2. The final ic is made by sequentially transferring the features from each mask, level by level, to the surface of the silicon wafer.

    按照從每一塊掩膜版上將圖形一層一層地轉移到矽片的表面,就制得了成品集成
  3. " electronic 1c chip drawing system " provides many functions such as " modify the position of the component ' s diagram " " modify the color of the component ' s diagram " " magnify and minify the component ' s diagram without distortion " " change the type of drawing line " " edit some physical properties of the component " " copy and paste diagram of one component " " delete one or more component diagrams " " move more than one components " positions " " change the z _ order of the diagram, set it to back or bring it to front " " save the drawing of the electronic components to one file and the file extension name is *. brd " " print the drawing ". users can finish all these functions easily by clicking and dragging the mouse

    板元器件繪制系統主要完成了使用鼠標拖拽、鼠標點按的方式繪制板上各種常見的元器件圖形;編輯板上元器件圖形的位置;編輯元器件圖形的顏色;不失真的對器件圖形進行放大和縮小;編輯元器件圖形的線型;編輯板上各個器件的物理屬性(比如阻的阻值大小、容的容量大小、額定壓等) ;復制已經繪制出的板上的器件;粘貼剪貼板上的器件;刪除單個或多個已經繪制出的器件圖形;同時改變多個器件圖形的位置;改變繪制區內各個元器件的zorder,也就是可以將層疊在一起的圖形置前或置后;把繪制的板器件圖保存到指定文件中;能打開、查看和修改保存的板器件圖;列印板器件圖。
  4. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖對大型地下洞室群圍巖穩定性的影響。
  5. The third, the whole circuit of digital cmos image sensor is presented. the circuits of pixel array, clock signal generator and sam have been improved on the base of simulation

    再次,我們對整個cmos數字圖像傳感器進行了設計,主要包括:時鐘信號發生器,移位寄存器和像素陣列。
  6. By the way, in computer terminology, this whole business of rerouting the path of execution is called " branching.

    便說下,在腦術語裏面,這用來實現對于程執行徑的選擇和改變的語句,叫做"分支語句
  7. The thesis is written in logic order of “ question asking - - question analysis - - question solution. ” first, on the basis of analyzing the operational environment for the power - generating companies after power sector restructuring, the author claims the necessity of budget management for these enterprises. then, by summarizing the extent of fulfillment of its budget targets from 2000 to 2004, she analyzes the problems and reasons in budget management in sr. at last, with the help of budget management theories and successful experience, she puts forward the detailed improvements separately in the budget structure, formation, fulfillment and evaluation

    在寫作思上,本文按「提出問題、分析問題、解決問題」的邏輯進行:首先,在分析我國力改革后發企業經營環境的基礎上,作者提出了發企業加強預算管理的必要性;然後,從sr發公司2000年- 2004年預算完成情況分析入手,作者分析了其預算管理存在的問題和原因;最後,運用預算管理理論、借鑒其他發企業管理經驗,作者從預算組織體系、編制、執行和考核方面,分別提出了具體改進措施。
  8. It discusses the characteristic of each level in osi model from the point of wwan first, then analyses clearly the primary technologies used in gprs / sms / csd and a topology structure model of the wwan based on gprs / sms / csd is presented. it also deeply discusses the integrate technology of gprs / sms / csd in a example of fujian environmental automatization system, at the same time a network model of wwan based on gprs / sms / csd is brought forward. last, there are the module programmers of the system

    本文從計算機開放系統互聯參考模型入手,按osi參考模型7層協議結構,逐步介紹了在無線廣域網環境中osi層次模型的特點,在此基礎上,詳細分析了gprs / gsm技術和簡訊息技術,並給出一個基於gprs /簡訊息/ csd的無線廣域網的網拓撲結構;以福建省環境自動監測監控系統的分析和設計為例,探討了現階段gprs技術和簡訊息技術、交換技術在無線計算機網系統中的集成問題,並給出了一個基於gprs /簡訊息/ csd的無線廣域網網模型,最後是系統的模塊程設計。
  9. Component partition of vhdl sequential statements and generation of abstract circuit structure

    語句的元件劃分及其抽象結構的生成
  10. For the problem of feeder assignment, a new model for optimization is presented, which directly takes the total time spent to assembly the whole pcb as its objective, supposing the assembly sequence is already known

    摘要針對貼片機喂料器的分配問題,給出一個新的模型,在貼裝已知的前提下,以貼裝整塊板所花費的總時間作為優化目標。
  11. Abstract taking the electric control sircuit of the flanging machine as an example, this single electromagnet directional control calce is used to design the electric control circuit with several sequential cylinders

    摘要本文以卷邊機氣控制迴設計為例子來說明使用單磁鐵換向閥進行多氣缸動作氣控制迴的設計方法。
  12. Firstly, aiming the marketing of hydroelectricity, that is, under the situation of separated plant and network, and entering the market by the competition of price, the author analyzed the advantages of the development of hydroelectricity. secondly the author made a medium - long - period forecast and evaluation of the electric load of the accepting - electricity area by gray - and - nerve network matrix

    首先針對水市場化問題,即在廠網分家、竟價上網的形勢下,水發展的優勢何在進行了探討;其次應用灰色與神經網模型對受力負荷進行了中長期預測與評價;通過梯級開發的基本理論與方法研究,得出黃河上游水梯級開發的兩個備選方案。
  13. The sequence to solve a overcurrent line of a feeder is : load transference to another feeder, reduction the reactive power and finally increase the section of the cable

    規劃一個饋線線(設備)的一條過流主幹是:了解負荷轉移至另一個饋線線(設備)過程中,將無功功率降低最終就要增加纜。
  14. The algorithm is composed of two sections. in the first section the nodes in a circuit are arranged in linear time order to preserve simulation validity. in the second section, the nodes in order are divided into several sets whose root is primary input node and nodes in which can be reached by path ; then these sets are united by connectivity among sets into some larger sets, the number of which is equal to that of processors ; at last the sets are assigned to each processor by connectivity among sets

    該演算法主要分為兩個部分,第一部分是將中的節點按線性時間,這樣就保證了模擬過程的正確性;第二部分是將有節點劃分到以不同原始輸入為根節點的子節點集中,並將這些子節點集按其連接量的大小合併為與處理器數目相等的子節點集合,最後將這些子節點集合按連接量分配到各個處理器上。
分享友人