靜水中應力 的英文怎麼說

中文拼音 [jìngshuǐzhōngyīng]
靜水中應力 英文
still water stress
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 水中 : aquatic; water水中爆炸 water shooting; 水中浮游生物 hydroplankton; 水中氣泡 underwater bubble; 水...
  1. This method applies the extended strip theory to establish the nonlinear ship motion equations in regular head seas, obtains stable time course by resolving in time domain, and then pressure vectors will be available. the pressure includes static pressure, incident waves pressure, diffraction pressure, radiation pressure, and wave impact pressure, and changed with instantaneous draft of each intersection

    該方法用擴展的切片理論建立迎浪規則波船舶非線性運動方程,通過時域步進求解獲得船舶剛體運動的穩定時歷,進而給出與船體各橫剖面瞬時吃相對變化、入射波壓、繞射壓、輻射壓和波浪沖擊壓諸分量。
  2. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間結構穩定性分析角度出發,針對在該項目涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主矢量圖、位移分布圖( ux 、 uy )以及等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直剖線的_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同平或垂直剖線的_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  3. According to the pavement structure dynamical analyze theory, the principle and process of the pavement modulus back - calculation have been discussed. the appliance ideas of the dynamical modulus among the pavement evaluation, the dynamical characteristic and correlative dynamical parameters of the cement concrete pavement surface, basement and subsoil have been investigated, and the contrast relationships between dynamical and static modulus of the cement concrete pavement have been established, and the evaluation standard of the structure layers " dynamical modulus of the cement concrete pavement has also been presented

    根據路面結構動分析理論,對路面模量反算的原理及實現過程進行論述,研討了動態模量在路面評價用思想及泥混凝土路面面層、基層、土基的動態特性和相關的動參數,建立了泥混凝土路面動態模量與態模量的對比關系,提出了泥混凝土路面各結構層動態模量的評價標準。
  4. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院用於比選報告及可行性論證; ( 2 )小關子電站攔河閘壩及地基的變分析:被成都勘測設計研究院用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被南勘測設計研究院用於初步設計方案; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的安全穩定性及溫控方案提供依據。
  5. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設經常遇到濕陷性黃土問題,其病害類型主要是地基土受浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場載荷試驗及壓盒實測數據,探討了基底分佈規律,樁土比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載進行了整體評價。
  6. When earth pressures are calculated by the shear strength parameters of cu, the way water - soil calculating separately is best, which should involve the influences of excess pore water pressure through the total stress unloading strength parameters of cu

    當採用固結不排抗剪強度指標計算土壓時,最好採用土分算的計算方法,計算時可以通過三軸固結不排強度指標將超孔隙的影響考慮在其,但此時最好採用卸載強度指標。
  7. As a result, the studying aim of this paper is to establish a practical and complete system for the prediction of ship maneuvering motion, taking into account of the influence of the environmental factors, such as the wind, wave and current, establish a practical and complete system for the prediction of ship maneuvering motion. in this paper, the opengl virtual reality simulation technique is introduced into the field of ship maneuver and control, and using the mmg mathematical model, the three dimensional dynamic simulation system of the ship motion is established and good results are achieved. in the process of the system development, firstly, the maneuvering motion equations for ship in the still water are established, based on the mmg module mathematical model and serial experimental result

    在系統開發過程,首先採用mmg分離式數學模型及相關的系列化試驗結果,建立單槳單舵海洋運輸船舶在的船舶操縱運動方程,並編制計算程序,經與試驗結果比較,證實了計算結果的正確性;為了解mmg數學模型模型參數變化對操縱性指數的影響程度,作者在上述已有程序基礎上,對有關模型參數進行偏移修正,探討了相參數變化后的操縱性指數,對船舶操縱性指數對模型參數的靈敏度進行了詳細的分析與探討,所得結論與工程實際相吻合,具有實際用價值,並為進一步提高船舶操縱性預報的精度打下了基礎;然後,在已有的船舶操縱運動模型基礎上,考慮雙槳雙舵的影響,建立了內河雙槳雙舵船舶的操縱運動模型;最後,綜合考慮風浪流作用的影響,進行了船舶的操縱運動模擬計算。
  8. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性、動有限元分析程序對圍壩的4個典型剖面進行了、動模擬模擬,模擬計算了壩體自填築至蓄運行和發生7地震各階段壩體及壩基的變形以及分佈,地震和地震引起的超振動孔隙分佈以及永久變形。判斷了壩體和壩基出現裂縫、塑性區以及地震液化的可能性。
  9. Erosion damage decreases rock load area, after defining damage variable, the damage stress in rock can be calculated by the method bring forward by lemaitre conveniently. for surrounding rock of a deep buried tunnel under the condition of drained, its seepage character is not only controlled by the high stress in rock, but also influenced by the development of erosion damage. in the whole course of rock " s deformation and failure, its seepage character decreases with the increment of stress in elastic stage, while " increases with the development of failure

    巖樣?變三軸滲透試驗過程的典型表現為隨著的增加,巖體內的空隙和裂紋受載閉合,滲透性降低,達到一定閾西南交通大學鷹士研究生學位論文第11頁值后,巖體內部裂紋發生擴展和歸並,滲透性增強;同樣,地下的動、作用對裂紋的擴展和歸並也起著促進作用。
  10. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預鋼結構的發展歷史及現狀作了綜述和總結,指出當前預鋼結構工程實踐存在的主要問題;闡述了預鋼結構的受機理,並指出預鋼結構的適用范圍和特點;在考慮結構和變位約束的條件下,建立預鋼結構優化設計模型;提出多次預鋼結構優化設計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級預的大小,並得到結構各部分的優化截面;對多次預最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文理論和方法,分別對大跨多次預鋼屋架、局部布索的平平行弦鋼桁架、整體布索的平平行弦鋼桁架和局部布索的超定鋼桁架等算例進行了優化設計,經濟效益明顯;對平平行弦鋼桁架的幾種施加預的方案進行比較,對于局部布索,預只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  11. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際用效果,為下坂地利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基平鋪蓋防滲方案,分別按竣工期和蓄運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元計算分析和研究;對混凝土防滲墻不同彈性模量對墻體和變位的影響進行了三維有限元計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  12. The permanent displacement caused by accumulated damage is calculated in equivalent joint - force method, while the way to calculate the equivalent joint - force is consummated, both in the equivalent joint - force method of horizontal face and maximal static shear stress face

    而多點輸入由累積損傷引起的永久位移可採用等價節點法,平面和最大面兩種等價節點等價節點的計算方法都在本文得到完善。
  13. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程的三根試驗樁的載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及-變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持的樁的豎直、平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、平荷載作用下的變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有的依據。
  14. The authour investigate the dosing conditions and effect of the pac to the huanghe water - source, which includes the following four parts : the selection of the pac ; the confirmation of dosing scheme and effect of the pac ; the research of application of potassium permanganate in combination with pac ; the research of the pac ' s modification and the modified effectiveness. the experiment is mainly carried out on the pilot system in the jieyuan water plan of tianjin. the results of the reseach include the following : l ) the pac from zunhua plant is selected as the better carbon for the source water of tianjin through the experiment ; 2 ) through the pilot experiment we conclude that the pac ' s best adding point is the mixing tank and the better dose is 10mg / l, on which the codmn of filtered water can be decreased to 40 % and the effluent have no problem of odour and color ; 3the adsorbing experiment show that pac mainly adsorb the organic matters which molecular wt., distribution between 500 and 3000, and can adsorb organic matters whose molecular wt., distribution are bigger than 6000 if the dose of it is adequent ; 4 ) pac together with potassium permanganate can remove the organic matter more effectively than each of them alone, and reduce the rising trend of turbidity of the flotation ' s effluent due to adding pac ; 5 ) the thesis made a research on the surface properties and the adsorbing capability of the modified carbon by oxidizer : the modified carbon with 20 % h2o2 can remove more organic pollutants than the untreated one by 12 % when we add a higher dose of coagulant ; 6 ) the modification of reduction and loading metal ions are also sttldied, and drow the following conclusions : the modified carbon with 5 % ammonia can enhance the organic matter ' s removal effectiveness by 10 % to the tianjin source water than the untreated one, and the modified one with loading metal ion remove the organic matters from the tianjin source water better ( 8 % ) than the untreated one due to the strong affinity betwween the humic acid and copper ion

    本文的實驗主要是在天津芥園廠的試系統上完成的,論文的成果和結論主要包括: 1 )通過態實驗選定河北遵化活性炭廠生產的煤質炭為適合天津原的炭種; 2 )試實驗確定粉末活性炭的較佳投加點為混合池投加,較佳投加量為10mg l ,此時可使濾后的cod _ ( mn )降低40 ,且可較好地控制濾后的嗅味和色度; 3 )初步確定粉末活性炭對原有機物的吸附主要集在分子量在500 - 3000范圍內,投量增大時可吸附部分分子量大於6000的有機物4 )試實驗表明:粉末活性炭與高錳酸鉀聯用可取得較兩者單獨用時對有機物更好的去除效果,且對因投加粉末活性炭而造成的氣浮出濁度升高有一定的改善作用; 5 )研究並初步確定氧化改性對粉末活性炭表面性質和有機物的去除效果的影響:粉末活性炭的氧化改性會使其表面的酸性官能團大量增強,表面極性增加;經20的過氧化氫改性的活性炭在增大混凝劑投加量( fecl _ 3投量為15mg l )時對有機物的總體去除效果較原活性炭提高12 , 1次氯酸鈉改性活性炭對有機物的去除效果較原活性炭提高6 ; 6 )研究並初步確定還原改性、負載金屬離子對原有機物的去除效果的影響:經5氨改性的活性炭可提高天津源有機物的去除率達到10 ;負載銅離子后的活性炭可提高對腐殖酸類物質的去除能,一般可提高8左右。
  15. And a post - liquefaction test method has been put forward, in which the cyclic loading and the static loading courses are both controlled by stress mode. this method reflects the in - situ conditions well and truly, and a lot of tests have been done using this method. in these tests the effects of confining pressure, relative density, liquefaction severity etc. have been thoroughly investigated

    主要工作內容如下:參與研製了振動扭剪全自動多功能三軸儀,並利用其獨特試驗功能設計了一套飽砂土液化后特性的試驗方法,試驗過程模擬地震作用的動加載過程及模擬大變形發生的加載過程均採用控制的方式進行,試驗方法跟現場條件更為接近並用該試驗方法對相對密實度、固結壓、液化度等對液化后變形特性的影響進行了研究。
  16. The study sets up 3 - d definite element models in terms of the seismotectonics of danjiangkou reservoir area. the models use drucker - prager yielded criterion to stimulate material property, which consider the influences of average stress and the second main stress on material strength

    本文則根據丹江口庫區的地質構造建立了三維有限元模型,採用drucker - prager屈服準則模擬巖石特性,即考慮了對材料屈服強度的影響,又考慮了間主的影響。
  17. Furthermore, author designs some tests, such as diffusion speed test of stress in soil under static load and sound wave test. by these tests, author verified that sound wave test can measure the stress in soil. comparing those aforementioned tests, we can know that their conclusions is coherent, so those conclusions also verify the feasibility of measuring stress in soil by sound wave tests

    經理論以及試驗結果分析,荷載作用下土傳遞速度試驗、聲波試驗以土分佈傳遞規律的試驗及測試技術研究及前述室內模擬試驗,在土體含量、密度變化情況下,三者所獲規律是一致的,初步證實聲波測試技術作為土測試手段的可行性,為無損傷、不擾動測試土做了探索性工作。
  18. Through testing on the static load of a single pile stirred with cement and soil and compound foundation and studying on the relationship between the practical bearing capacity in civil engineering of a single pile stirred with cement and soil and the bearing capacity of compound foundation, it shows that : the practical bearing capacity of a pile stirred with cement and soil can not fulfil the requirement of disign or theory calculation, and resonable discount of calculating the bearing capacity of compound foundation should be considered

    通過對泥土攪拌樁進行單樁載荷試驗和復合地基載荷試驗,對泥土單樁承載在工程的實際表現以及與復合地基承載的關系的研究,結果表明:泥土單樁的實際承載一般難以達到設計或理論計算的要求,在復合地基承載的計算做適當折減。
  19. We designed five walls for simulate both sides of the top floor. proceeded to add unilateral horizontal static loading experiment to 4 pieces of prestressed small - sized concrete hollow block masonry models and 1 piece of normal concrete hollow block masonry model. crack - resistance behaviors were analyzed, and we have proceeded prestressing loss survey for 25 days, and discussed the reasons of prestressing loss

    模擬房屋頂層兩端單元設計試驗模型,進行了4片預砌塊砌體墻和1片對比普通墻體平單調加載試驗,並且進行了25天的預損失觀測,探討了預損失和加載過程的變化等問題,分析了預砌體的抗裂性能。
  20. In this article, the following technology of the carbon fiber composite flywheel in the integrated energy - storage / attitude - control system are analyzed and the valuable achievements are achieved above the foundation of consulting a large quantity of literatures and investigation : 1. different technology method for carbon fiber composite flywheel are designed, aimed at the character of carbon fiber composite material and manufacture 2analyzes the stress of carbon fiber composite flywheels made by different technology method, hoop - winding method, symmetric ortho layers pressing method, multi - layer winding method and interference joining method, under high rotate speed, builds their static model ; and simulates their technology and shape parameter ' s affecting their stress level with i - deas f. e. m

    本文在查閱了大量國內外相關文獻及調研的基礎上,針對集成化儲能/姿態控制飛輪系統的碳纖維復合飛輪的以下相關技術進行了研究,並取得了有價值的成果: 1針對碳纖維復合材料的特點及加工方式,設計了周向纏繞成型法、對稱正交鋪層層壓法、多層結構纏繞及過盈連接法等不同工藝方式的碳纖維復合飛輪轉子; 2針對不同工藝方式的碳纖維復合飛輪轉子,進行了高速旋轉狀態下的分析,建立了學解析模型,並結合i - deas有限元分析軟體模擬模擬了不同工藝方式的碳纖維復合飛輪轉子的相關幾何參數及工藝參數對其平的影響; 3
分享友人