靜水壩 的英文怎麼說
中文拼音 [jìngshuǐbà]
靜水壩
英文
upper stillwater dam-
Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level
本文首先闡述了我國水資源狀況和水旱災害、說明水庫汛期限制水位動態控制研究的必要性;介紹了傳統汛限水位設計、汛限水位靜態控制、模糊汛限水位過程線存在的問題及其初步改進方法;分析汛期限制水位動態控制的方法及關鍵問題;進一步闡述了水庫極限風險率的定義;根據極限風險率定義,詳細敘述了不同極限風險指標時、不同汛期限制水位下起調,水庫所能承受的極限風險率計算方法。然後,基於極限風險率計算方法,以白石水庫為背景,研究「考慮壩體自身安全、考慮壩體安全與下游防護對象控制下泄流量的汛限水位動態控制的極限風險率」 。The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method
本文通過大量的尾礦土物理力學性質試驗資料,建立了含水量與尾礦土性質之間關系曲線;分析了水在尾礦壩區的滲流規律和不同標高時浸潤線的變化情況,為分析尾礦壩的穩定性提供依據;結合生產上的工程項目,從包鋼尾礦壩的穩定性研究入手,應用有限元法,通過數值模擬分析了水對尾礦壩的靜力、動力穩定性影響。The main content of this article includes : " ( l ) the planar non - linear and viscid - elastic static mechanical analysis is used to analyze and calculate the md in service. ( 2 ) the planar nonlinear static mechanical analysis of the stress and deformation is used to analyze the med in banking, which is banked to the height of 140m
主要研究工作有: ( 1 )茅坪溪防護大壩完建和蓄水時的應力和變形的分析計算:對完建和蓄水時壩體的應力和變形進行平面非線性靜力分析計算和平面粘彈性靜力分析計算,對分析計算結果作出結論。Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well
摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action
考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,水化熱溫升,邊界保溫,水庫蓄水過程,澆築間歇以及灑水養生等因素;應力場的計算考慮了混凝土的自重,靜水壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。The stream showed clear and smooth-looking in the glasses and, below the curl of falling water, the spray from the dam was blowing in the wind.
小河在望遠鏡里顯得清澈而平靜,打著漩渦的水從攔水壩瀉下來,底下的水花在風中飛濺。Based on in - situ investigation, indoors soil tests, data process and calculation analysis for chunhua reservoir, this article acquires the distributing regulation and physical & mechanical properties for each layer soil below the dam base, and further determines typical model cross sections for static & dynamic stress deformation analysis
本文根據對純化水庫進行的現場勘察、室內土工試驗、室內資料處理、計算、分析獲得了壩基以下各土層的分佈規律及物理、力學性質指標,進而確定靜、動應力變形分析的典型斷面。Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction
採用非線性靜、動力有限元分析程序對圍壩的4個典型剖面進行了靜、動力模擬模擬,模擬計算了壩體自填築至蓄水運行和發生7地震各階段壩體及壩基的變形以及應力分佈,地震應力響應和地震引起的超靜振動孔隙水壓力分佈以及永久變形。判斷了壩體和壩基中出現裂縫、塑性區以及地震液化的可能性。In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied
其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project
工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。On the basis of brief introduction of danjiangkou dam extension project which is in the middle route water resources project of the south - to - north water diversion, the present construction methods and existing problems about key technology of increased artificial concrete keyway of jointing surface between new concrete and existing concrete are analyzed, and a new construction method by saw - cutting and static crack for construction of concrete keyway is researched
摘要在簡要介紹南水北調中線水源工程丹江口大壩加高工程概況的基礎上,針對大壩加高中新老混凝土結合面新增人工鍵槽施工的關鍵技術,分析了現有施工方法及存在問題,研究並提出了新的鋸割靜裂法施工法。In order to reduce the equation complexity and adapt to complicaied noniinear ana1ysis of high arch dams with joints, finite element treatments are used with incompressibie water and massless foundation. the added mass of water and added stiffness of foundation are respectively used to substitute the influence of water and foundations. the efficiency in the computations is improved by means of static condensation
為適應有橫縫高拱壩非線性分析的復雜性,採用不可壓縮水體和無質量地基假定進行有限元處理,以水體附加質量和地基附加剛度近似代替水體和地基的影響,通過靜凝聚提高計算效率。Through the non - linear fem static and dynamic analysis of the rcc gravity dam of kelashuoke reservoir by ansys, the deformation and stress law of dam body and its foundation under various working conditions is studied so as to get to know the working situation of the dam body and foundation rock under design conditions and to evaluate the reliability of the dam construction scheme
摘要採用美國ansys結構分析軟體,通過對喀拉朔克水庫碾壓混凝土重力壩方案進行非線性有限元靜力和動力分析,研究探討了壩體及基礎在各種工況下的變形和應力規律,以了解壩體和基巖在設計條件下的工作形態,對方案的可靠性進行了評價。Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )
高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。In this paper, with complete calculation micro - mechanics method, mass concrete was taken as three - phase composites, which consists of mortar matrix, aggregate and bond between matrix and aggregate. with nonlinear finite element method, the simulation of static and dynamic mechanics performance of the uniaxial compress concrete specimen of dongjiang arch dam and simple supported beam specimen of xiao wan arch dam was studied by means of the software of msc. marc. the number of all kinds of mortar matrix was calculated according to grading of aggregate of three graded concrete and walraven function
本文採用完全細觀計算力學方法,將大體積混凝土在細觀層次上看成是由粗骨料顆粒、硬化水泥砂漿及其二者之間的粘結界面組成的非均質復合材料,採用非線性有限元方法,在對大型商業有限元軟體? msc . marc二次開發的基礎上,對東江拱壩的三級配混凝土軸壓試件、建設中的小灣拱壩三級配混凝土梁試件在靜、動荷載下的力學性能和破壞過程進行了數值模擬。分享友人