非完整井 的英文怎麼說

中文拼音 [fēiwánzhěngjǐng]
非完整井 英文
partially penetrating well
  • : Ⅰ名詞1 (錯誤) mistake; wrong; errors 2 (指非洲) short for africa 3 (姓氏) a surname Ⅱ動詞1 ...
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement

    在對本區開發歷程和開采特徵分析的基礎上,從微構造、沉積微相、儲層均質性、網控制等方面深入地分析了油藏水淹特徵及剩餘油分佈規律,提出了以善注采網、調注采結構為目的的綜合調措施,已見到了明顯的效果:油田遞減由1997年的9 . 14降至目前的- 1 . 46 ,綜合含水上升率由原來的0 . 33降至目前的0 . 16 。
  2. Secondly, by means of arranging and analyzing the construction monitor data, the practicality method of proposing the dewatering calculation model and parameters of the non - constantly pumping dewatering well was proposed, moreover the equivalent calculation model and parameters of the erhe project was proposed. thirdly, based on calculating the design scheme of dewatering well with the equivalent calculation model, the optimized scheme of dewatering well of the erhe project was proposed and the well number was reduced to 32 where it was 42 in the old scheme. at last, based on the well construction, the dewatering well structure and constructing technique in the soft soil area were exploited in addition, the significative analysis and evaluation attitudes to the old design scheme of dewatering well project were impersonally proposed

    首先,根據工程地質及水文地質條件和工期分析,提出了「二河」降水的設計方案;其次,通過系統理分析抽水的施工監測記錄,提出了用降水的施工監測確定定常抽水降水流模型和參數的實用方法,並建立和確定了「二河」降水定常抽水、有越流的潛水等效模型和參數;接著,通過用等效流模型進行降水方案的計算,提出了「二河」降水的優化方案,使原方案的42眼降到32眼;最後,通過對降水施工實踐的總結,開發了適于軟土區的降水結構和成施工技術。
  3. Partially penetrating well

    非完整井
  4. By analyzing the reduction pressure action of non complete penetrateel well and stop water heavy curtain, the paper expounded that effect of non complete penetrateel well was better than complete penetrated well and put forword the concept of reduction pressure coefficient

    摘要通過分析非完整井和隔水帷幕的減降作用,得出選用非完整井效果好的結論,繼而引出減降系數的概念。
  5. In view of the reservoir characters of severe heterogeneity, wide pore radius distribution, unpredictability of pore radius, and unrealized protection for whole hole section and bad protection effect by conventional shielding temporary plugging technology, we designed a broad spectrum oil film temporary plugging drilling and completion fluid system for reservoir protection

    摘要針對油層均質性強、孔徑分佈范圍較寬、油層孔徑難以準確預知,常規屏蔽暫堵技術幾乎無法實現對個油層段的保護、油層保護效果差等特點,設計了廣譜「油膜」暫堵型保護油層鉆液體系,並進行了室內系統評價和現場應用。
分享友人