頂升法 的英文怎麼說

中文拼音 [dǐngshēng]
頂升法 英文
lift-upmethod
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ動詞1 (由低往高移動) rise; hoist; go up; ascend 2 (等級提高) promote Ⅱ量詞1 (容量單位) lit...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. The calculation method using in factory has larger error and is n ' t used in high ignition point oil transformer. in this paper a calculation method, which has been verified by experiment results, is presented based on the fundamental theories and rule equation of heat transfer to calculate the temperature rise of average oil, top oil, coil, core and hot - point. a program has been compiled

    本課題立足於工程實際應用,根據傳熱學基本原理和經典試驗換熱準則式,通過對變壓器發熱冷卻原理進行分析和研究,提出了一套計算變壓器平均油溫油溫、繞組溫、鐵芯溫和最熱點溫的計算方並編制了計算軟體,對影響變壓器溫的因素進行了分析。
  2. Although grouting - lift is a complicated dynamic process, according to the difference of action between the slurry and soil, this process is provided into several static stages in the paper. in every stage, the author expounds the working mechanism and builds the model, to study earth pressure distribution and lift - force magnitude when being grouted

    結合每個階段的特點,進行注漿機理闡述,建立注漿模型,探討了注漿過程中土層中壓力分佈規律和力大小的計算方,分析了土體抬的破壞模式以及注漿的加固效果、效果和注漿量之間的關系。
  3. This paper outlines operation, check and repair of the bucket stacker / reclaimer of a coal conveying system used at anqing petrochemical coal - fired power station, describes damage condition of the slewing ring, discusses the causes and details how to replace the damaged slewing ring by synchronously jacking

    摘要介紹了安慶石化熱電廠輸煤系統斗輪堆取料機的使用檢修和回轉大軸承的損壞,分析了損壞原因,重點介紹了「頂升法」更換回轉大軸承的技術。
  4. These common methods include high altitude assemble construction in bulk, life - on segment by segment, integral life - on, integral hoisting, integral erect etc. some of these methods need a lot of falsework and others depend on devices for life - on or hoisting

    網架的發展也要求施工方不斷更新和提高,以滿足工程技術和經濟的要求,從滿搭腳手架鋪設高空散裝,到分片吊裝、整體吊裝、整體提、整體
  5. The common construction methods, technological characteristics and requirements are summarized, which includes high altitude construction in bulk, assemble, segment by segment, integral assembly, integral propping up, whole installation and sliding construction

    論述了大跨度鋼結構的一般施工方、工藝特點及施工技術要點與難點,具體包括高空散裝、分條或分塊安裝、整體提、整體頂升法、整體吊裝及滑移
  6. Referring to some type of the structure such as plane truss, grid truss and grid shell, the author dissertates the common construction technique including whole installation, integral propping up, integral lifting, high altitude construction in bulk, member assembly and sliding construction

    結合大跨度鋼結構的各種形式,如平面桁架、網架、網殼等,概要的論述了其一般的施工方、工藝和技術要點,包括整體吊裝、整體頂升法、整體提、高空散裝、分單元吊裝和高空滑移
  7. The general legislation division is responsible for public safety through the administration of a range of ordinances. its main duties are to ensure safe operation of lifts, escalators, trams, amusement rides, aerial ropeways, the peak tram, builders lifts and tower working platforms

    一般例部負責執行多條與保障公眾安全有關的例,該部的主要職責是確保降機、自動梯、電車、機動游戲機、架空纜車、山纜車、建築工地降機及塔式工作平臺的操作安全。
  8. We also ensure public safety in all major e & m areas, administering the legislation and issuing codes of practice and guidelines on the safe use of electricity, gas, lifts and escalators as well as in such diverse areas as amusement rides, aerial ropeways and the peak tramway among others. our energy efficiency office is also actively involved in a number of programmes and initiatives to promote the wise and efficient use of energy in hong kong

    我們並負責執行例,就使用電力、氣體、降機及自動梯,以至機動游戲機、架空纜車及山纜車等制訂實務守則及指引,以保障主要機電設施操作范圍內公眾的安全。此外,我們的能源效益事務處更積極倡導各類計劃及參與連串宣傳活動,藉以提高本港市民有效使用能源的意識。
  9. Using uprising method to raise tunnel with reinforced concrete cover

    頂升法抬高鋼筋混凝土蓋板涵洞
  10. Three - gorges ship lift structure is one of important navigation facilities in the three - gorges projects. as far as its scale for navigation, its lifted weight and height are concerned, the ship lift structure is the greatest one in the world. in this paper taking the ship lift structure as background, the principle of mr adaptive reduced vibration control system is proposed to solve the problem of seismic whipping effect of the top machinery building of ship lift structure

    三峽大壩船機是三峽水利樞紐工程中重要的通航設施之一。就其通航規模、提重量及高度而言,均屬國內外已建、在建船機之首位。本文以該大型船機為工程背景,對船機部廠房地震鞭梢效應問題提出了磁流變智能自適應減震控制的原理、設計方和效果分析。
  11. Generally ship lift structure is consisted of two or four huge reinforced concrete tube towers and a single - story machinery building on the top of tube towers. because the tube towers is demanded to support the large loads, the lateral stiffness of tube towers is a few hundred times as solid as that of the top machinery building and cause the sudden change of the stiffness. this change would cause insentive seismic whipping effect of the top building. the aseismic methods are difficultly used to reduce seismic responses of the top building of ship lift structure. the feasibility of develop an intelligent vibration control system is explored in the paper

    這樣,在塔柱部鋼筋混凝土平臺就會產生側移剛度的突變。這種巨大的剛度突變會引起船機部廠房強烈的地震鞭梢效應,使得船機部廠房地震反應的控制就成為船結構抗震設計中的關鍵問題之一。由於採用常規的結構振動控制方難以較好地解決船機部廠房地震鞭梢效應,因此這就為智能振動控制技術的發展和應用提供了可能。
  12. With his arms tied behind his back, he maneuvered himself to be able to remove the blindfold from me so i could untie myself then we all helped each other untie our feet to make a fast getaway. running as fast as our injuries allowed, we yelled and yelled, " we re americans ! we re americans !

    一天,我們坐在那裡,聽到有飛機飛來然後,是直機低飛的聲音然後,一枚炸彈從木屋丟進來,就落在我腳旁幾寸外,但它的尾巴卻鉤在木屋上,離開了炸彈他們無相信,於是他們小心翼翼,把它拿下來。
  13. Air lift flip chip

    倒裝
  14. The first key technique : using plain - text cipher and md5 message - digest algorithm to ensure stb and dhcp server ' s certificate and secure the stb and server ' s communications - the second key technique : using hmac algorithm to realize the safe functions - the third key technique : using ipsec to realize safe functions o those three methods " complexity increases in turn and the degree of the security increases as well which depend on the frame of the methods and the complexity of the algorithm. all theose three methods use the unique serial - number or a special slip - window to defend replay attack

    主要採用三種安全方案實現:第一種:利用約定的明文密碼驗證機盒與dhcp服務器的合身份, md5驗證信息合性:第二種:利用hmac演算驗證機盒與服務器身份,信息合性;第三種:利用ipsec驗證機盒與dhcp服務器身份與信息合性。每一種方案中皆採用包序號唯一或者滑動窗口保證重放攻擊。此三種方案復雜度依次增加,安全度依次高,主要取決于演算的復雜度與架構的搭建。
  15. The rescue team members told us of heartbreaking events that had occurred during the flooding, such as one rescue where they had to cut a roof open and 20 people crawled out from the attic because the water level had risen too quickly for them to escape by any other means

    救難隊員告訴我們許多在洪水時令人心碎的故事,像有一次,他們必須破開屋好讓二十個人由閣樓中爬出來,因為水位上得太快,沒有其它方可以讓他們來得及逃生。
  16. The smoke was so thick that the helicopters couldn ' t land on the roof

    煙太濃了,直飛機無在屋上著陸。
  17. From the simulation result, the serial port updating module are working normally. the simulated signal of illegal attack is defended while the background monitoring works effectively

    通過測試結果,得出:機盒軟體串口級運行正常;模擬對正常信號的非攻擊得以屏蔽,后臺監控正常。
  18. Where i ever got such an idea i cannot say, unless it could be that the morning came over the peaks of the gablilans and the night drifted back from the ridges of the santa lucias

    我說不清怎麼會有這樣的想,也許是因為黎明從加比侖山起,夜晚從聖盧西亞斯山脊壓下來的緣故。
  19. The reinforcing technique to rise to replace is a kind of good way for treatment building slant angle and recovering building originally true height, and it is less applied for high building correction to replace in loess soil

    糾偏加固技術是處理建築物傾斜和恢復建築物原來標高的一種好方,其在自重濕陷性黃土場地的多、高層建築糾偏工程中還應用較少。
  20. The computational cost involved no longer increases exponentially with the number of vertices of the meshes to be fused. ( 2 ) the algorithm is robust as the ambiguity in graph structure combination is alleviated. ( 3 ) the detail of the cut mesh is fully kept

    與原有的基於全局調和映射的融合方相比,新方具有以下優點: ( 1 )演算效率大幅度提,求解時間不再隨融合模型點數的增加而指數增長; ( 2 )減少了二維網格拓撲合併中奇異情況出現的概率,提高了演算的穩定性; ( 3 )被剪切網格的細節得到完整保留; ( 4 )消除了原演算對融合區域拓撲的限制。
分享友人