頂壓條 的英文怎麼說
中文拼音 [dǐngyātiáo]
頂壓條
英文
tip layering-
In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost
在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。By analyzing and experimentally verifying the model, new ways of improving mixer performance were put forward. ( 1 ) heat water should be used in the mixer ' s temperature control to make the mixer work with optimal parameters. ( 2 ) the surface materials of the mixing chamber and rotors should be chosen rationally to change material surface energy and increase friction on them. ( 3 ) when the compound was processed under higher pressure of floating weight, shallow groovers or stripes parallel to the axle of the rotor should be made on the mixing chamber internal wall to increase the real contact area and improve mixing effect
通過對模型的分析和實驗驗證,提出了提高密煉機混煉效果的新途徑: ( 1 )密煉機溫度控制採用溫水冷卻,使密煉機處于最佳工作狀態; ( 2 )通過合理選擇密煉室和轉子表面材料以改變材料表面能來增大膠料與它們之間的摩擦力; ( 3 )在上頂栓壓力較大的條件下,在密煉室內壁與轉子軸線同方向加工淺的光滑槽可明顯改善混煉效果。For the tip - to - face roof stability, chock - fram type powered support only be applied to hard top - coal, shield - type powered support and chock - shield - type powered support can be applied to three top - coals
通過分析,為保證端面頂板穩定,支撐式液壓支架僅適用於頂煤為硬煤的條件下,掩護式和支撐掩護式支架在三種頂煤條件下均可以適用。Viscous strip and hermetic sealing proof with wedge - fixing
有壓條系統,使用粘性條和密封封頂The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio
基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。With the increase of lateral pressure modulus, the magnitude of principal stress decreases and the direction of it is hardly changeable ; with the increase of the angle between the direction of the maximal horizontal principal stress on magnitude and the fault bearing, the magnitude of principal stress increase and its direction can hardly change ; with the increase of the elastic modulus of rocks, the magnitude of principal stress increases and the direction changes more ; with the increase of pr, the magnitude of principal stress decreases and the direction changes more ; with the increase of lateral pressure modulus, the principal stress at hance, the tress at topmost arch, bottom arch and principal stress at lateral arch decreases, with the increase of the depth of tunnel, the stress of surrounding rock also increases, and the poorer the quality of surrounding rock is, the little its principle stress is
分析得出,隨著側壓力系數的增大,主應力量值減小,主應力方位難改變;隨著與斷層走向的夾角增大,主應力量值增大,應力方向難改變:隨著巖石的彈性模量的增大,主應力量值增大,方向變化越大;隨著泊松比的增大,主應力量值減小,方位變化越大。隨著側壓力系數的增大,頂、底拱處的各應力值增大,拱腰處的主應力減小,剪應力增大,側拱處的各主應力減小,同一側壓力系數的條件下圍巖質量越差,各應力值也越小;隨著洞室埋深的增加,圍巖壓力也增大,圍巖質量越差,其應力值也減小。Technical condition of caving powered support
放頂煤液壓支架技術條件Dtu 40. 35. building works. private contracts. roofing with profiled sheeting made of coated steel sheet. part 2 : special clauses
Dtu 40 . 35 .建築工程.專門合同.塗覆鋼板制壓型鋼板屋頂.第2部分:特別條款This paper studies the application of inductively coupled plasma ( icp ) technology to the etching compound semiconductor insb - in film. by means of single probe and double probe, the ion density and electron temperature of chamber ( 30mm and 50mm in height respectively ) under varied process condition were diagnosed. the spatial distribution of the axial position of the two parameters and the varied curve that the two parameters varies with the power and air pressure are obtained
利用單探針和雙探針診斷30mm高反應室和50mm高反應室在各種工藝條件下的離子密度和電子溫度,得到這兩個參數在反應室軸向位置的空間分佈、隨功率和氣壓的變化曲線、頂蓋接地和反應室體積對它們的影響,結果表明離子密度為10 ~ 8 10 ~ ( 10 ) cm ~ ( - 3 ) ,電子溫度在4 10ev之間;當頂蓋接地時,該處的等離子體密度明顯大於不接地;在同樣條件下, 50mm高反應室內的離子密度明顯大於30mm高反應室。The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge
提出了一種有效可行的錨跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋錨跨索股初張力精確控制的難題;建立了錨跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了錨跨張力控制系統,該系統具有穩定可靠,精度高,使用方便等特點,它的投入使用將為我國今後大跨徑懸索橋錨跨張力控制提供一種全新的、可靠的手段。Seal the shipping container with either two inches ( 5. 08 cm ) or more width of pressure - sensitive or nylon - reinforced tape or with 60 - pound, three inch ( 7. 62 cm ) wide water - activated reinforced tape. close the box securely, applying three strips of tape to both the top and bottom of the box, so the middle and two edge seams are sealed
08厘米)或更寬寬度的感壓或尼龍加強膠帶,或者使用60磅、三英寸( 7 . 62厘米)寬的水活性強力膠帶,密封運輸容器。在包裝箱的頂部和底部貼上三條膠帶,牢固地合上包裝箱,這樣中間的接縫和兩條邊沿接縫就已經密封了。Research results show that different conformation mode of tectonite roof result in the difference of preservation condition of gas, intense pressing process of structural stress in the front of gliding structure result in mine gas outburst, and control on no. 2 gas source in tectonite roof is the best means by which the gas problem can be perfectly solved in gliding structure area
研究結果表明:由於滑動構造區煤層頂板不同的結構類型,導致礦井瓦斯保存條件的差異;滑動構造前緣擠壓帶內強烈的擠壓應力作用是本區瓦斯突出的根本原因;控制采空區頂板的二次瓦斯源是治理滑動構造區瓦斯地質災害的根本之策。The results show that ( 1 ) the unconsolidated confined aquifer plays a crucial role in load transfer because of its fluidity and replenishment in time, making the loads of overburden soil evenly transfer into the bedrock through the unconsolidated confined aquifer and the load keep constant during the excavation process ; ( 2 ) under the condition without unconsolidated confined aquifer, the load on the bedrock will be reduced sharply during the excavation
研究結果表明:鬆散承壓含水層條件下,由於承壓水的流動性和補給作用,上覆表土層的載荷通過鬆散承壓含水層均勻地作用於下部基巖上,開挖過程中基巖頂界面上的載荷基本保持恆定,鬆散承壓含水層起到均勻傳遞載荷的作用;無鬆散承壓含水層時,作用在基巖頂界面上的表土層載荷隨煤層開挖而顯著降低。The pressure container for the nuclear reactor pile which is introduced by this essay is designed and made by certain group company. it ' s a huge equipment used in the nuclear power station. the equipment is made up of two parts, a pressure container body and a lid. this paper is going to give the descriptions of the transport program design of the pressure container body. the body of the pressure container is 5. 165m wide, 4. 85m high and its net weight is 160t, because it is a large item for transporting in nature, the container needs a stern transporting condition. if we want to transport the container designedly and procedurely, to achieve no damage and no loss in the whole process, we must pay a careful investigation and find a feasible way to carry it
該設備由壓力殼筒體和頂蓋兩部分組成,在此僅敘述核反應堆壓力殼筒體的運輸方案設計。核反應堆壓力殼筒體凈重160t ,寬5 . 165m ,高4 . 85m ,屬大件運輸。運輸技術條件要求極為嚴格,為使該大件運輸能有計劃、有步驟進行,確保整個運輸過程完整無損、萬無一失,必須進行深入細致的調查研究,尋找大件運輸的可行方案。For the 60 - km orsm, the boundary conditions are prepared from jma s global spectral model outputs, which include surface data as well as upper level data on 16 standard pressure levels all the way up to 10 hpa about 30 km above ground in altitude
60公裡外模式的邊界條件,主要來自日本氣象廳全球譜模式的輸出數據,當中包括地面數據及16個標準等壓面的高空數據,頂層在10百帕斯卡,即離地約30公里的高度。For the 60 - km orsm, the boundary conditions are prepared from jma s global spectral model ( gsm ) outputs, which include surface data as well as upper level data on 16 standard pressure levels all the way up to 10 hpa ( about 30 km above ground in altitude ). boundary data for the inner 20 - km model are extracted from the outer 60 - km model
60公裡外模式的邊界條件,主要來自日本氣象廳全球譜模式的輸出數據,當中包括地面數據及16個標準等壓面的高空數據,頂層在10百帕斯卡,即離地約30公里的高度。 20公里內模式的邊界條件,則取自60公裡外模式。Since the vertical stress distribution of coal and rock can reflect the risk of rock burst, the influence of hardness and thickness of coal seams with a hard roof and a hard floor on the vertical stress distribution of coal and rock was simulated
摘要在堅硬頂板和底板的「兩硬」條件下,對不同煤層厚度和硬度對煤巖體中的垂直應力分佈的影響,也即反映了對煤巖體中發生沖擊礦壓危險性的影響進行了模擬。分享友人