頂巖流 的英文怎麼說
中文拼音 [dǐngyánliú]
頂巖流
英文
superfluent lava flow-
The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds
江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下連續墻結構,並獲得成功。The results show that ( 1 ) the unconsolidated confined aquifer plays a crucial role in load transfer because of its fluidity and replenishment in time, making the loads of overburden soil evenly transfer into the bedrock through the unconsolidated confined aquifer and the load keep constant during the excavation process ; ( 2 ) under the condition without unconsolidated confined aquifer, the load on the bedrock will be reduced sharply during the excavation
研究結果表明:鬆散承壓含水層條件下,由於承壓水的流動性和補給作用,上覆表土層的載荷通過鬆散承壓含水層均勻地作用於下部基巖上,開挖過程中基巖頂界面上的載荷基本保持恆定,鬆散承壓含水層起到均勻傳遞載荷的作用;無鬆散承壓含水層時,作用在基巖頂界面上的表土層載荷隨煤層開挖而顯著降低。The round columnar joints are one of the flow structures showing the horozontal emplacement of basic dyke swarms. the round columnar joints show that the basic dyke has rheological behaviour of the viscous shearing in magma emplacement
巖墻發育圓柱狀節理表明出露的是巖墻的頂部,反映基性巖墻群侵位時巖漿具有黏滯性剪切作用的流變學特徵。
分享友人