頂樓梁 的英文怎麼說

中文拼音 [dǐnglóuliáng]
頂樓梁 英文
garret beam
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 頂樓 : cockloft; attic; garret頂樓窗 garret window; 頂樓房間 loft
  1. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為電視塔的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應位置設置兩根無粘結預應力大樑分別作為游覽廳屋面和面徑向懸挑支承的錨固,確保了它和塔筒的整體性和荷載的傳遞。
  2. There was a low plastered ceiling to a part of it ; the rest was open, to the ridge of the tiled roof, and there were beams across

    有低矮的天花板,一部分抹了石粉,剩下的部分卻空著,露出瓦房的屋脊和橫
  3. Each watchtower is supported by nine beams and 18 pillars and has three layers of eaves. there are 72 ridges on the roof with a gilded spire in the centre

    四座角造型相同,分別由九十八柱三重檐七十二脊構成,置有鎦金寶項。
  4. The thesis verifies the availability of ductility detailings of elements prescribed by code through comparing the actual rotation capability of both ends of columns and beams obtained from inelastic dynamic analysis and the maximal rotation capability which columns and beams can possess through adopting the detailings in the code

    本文通過對分析所得的、柱端實際塑性轉動和採用規范構造措施后的構件可能具有的轉動能力進行對比檢驗了規范構件延性構造措施的有效程度;並再次確認了柱截面尺寸沿高度收小(變截面)以及當層柱軸壓比小於0
  5. The main tower of the third - phase project was topped out and reached the designed height of 330 meters on monday

    10月29日,北京中國國際貿易中心三期工程主塔的最後一根鋼吊裝就位,達到330米的設計高度,這標志著國貿三期工程主塔成功封
分享友人