頂管現場 的英文怎麼說

中文拼音 [dǐngguǎnxiànchǎng]
頂管現場 英文
pushing site
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  1. Many expect the new super - casino to go either to blackpool ( the clear favourite of punters on betfair, a betting exchange ) or to greenwich, a london borough which has a tenuous claim to being especially needy but is home to the embarrassingly underemployed millennium dome ( now known as the o2 )

    許多人認為,新的超級賭不是花落不萊克浦(很顯然,它是「賭事」賽馬交易所賭徒的最愛) ,就會是倫敦格林威治自治區的盤中餐,盡格林威治聲稱賭是自己迫切需要,但這一點很令人懷疑,因為至今尚未投入營運的千年穹在人稱o2 )就在該區的地盤上,真是尷尬的很。
  2. The in - situ testing includes surface deformations, sub - surface movements, earth pressures, pore water pressures, underground water levels, spt, stresses of pipes and pipe - soil contact stresses. in addition, the total jacking forces, deviations in line and level of the pipe line and earth pressures in the earth pressure balance machines ( epbm ) are also recorded. the results of field - testing are analyzed, and the variety of testing datum include earth pressures, pore water pressures and underground water levels during the course of the shield through it are studied

    測試內容包括地面變形、深層土體變形、土壓力變化、孔隙水壓力變化、地下水位變化、土體標準貫入試驗、道內力變化、土接觸應力變化以及施工記錄(包括力、土壓力、平面偏差、高程偏差等) 。
  3. Both theoretical analyses and field observations have shown that pipe jacking in such a kind of soft soil ground as in shanghai area, movements of soils around the pipes is of three - dimension

    理論分析和實測都顯示,在類似於上海等地的軟土地層中施工,周圍土的運動問題是三維的。
  4. According the field test of conduit with high embankment, this paper states the main cause of conduit damage is that the formula or the experience curves with a smaller earth. value of the top of conduit from calculation are used. in order to get rid of the damage the better means is that soft material paved on the top of conduit

    涵洞()縱向開裂病害存在非常普遍,本文結合高填土涵洞測試,指出一些設計部門採用了計算值偏小的公式或經驗曲線計算涵洞的垂直土壓力,是病害產生的主要原因,較好的解決措施是在涵洞鋪填壓縮性大於填土的柔性材料,可以大大減小洞垂直土壓力。
  5. By analysis the results of in - situ monitoring in the process of pipe jacking, the law of surface deformation perpendicular to pipe axis and along pipe axis, the sub - surface movements perpendicular to the axis of pipe and along the axis of pipe are studied

    通過對工程測試數據的分析,研究了施工引起的道周圍土體的移動規律,包括地面橫截面和縱向截面變形規律、深層土體沿道軸線方向和垂直於壁方向移動規律。
  6. 2. the in - situ monitoring is made on the disturbance of soil induced by pipe jacking construction

    施工引起的土體擾動進行了監測,研究了工程測試技術。
  7. All field connections, remote alarm functions and ac wiring are brought into the enclosure through the top, bottom, or side conduit entrances as indicated on the dimension drawing

    所有連接,遠程警報功能和交流電線路,都從外殼的部、底部或側面導引入外殼內,這些都標注在尺寸圖上。
分享友人