頂進施工方法 的英文怎麼說

中文拼音 [dǐngjìnshīgōngfāng]
頂進施工方法 英文
jacking
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 進構詞成分。
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 方法 : method; means; way; technique; process; procedure; plan; device; recipe; fashion; tool; maneuver
  1. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    閉水試驗因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜序,不僅費、費時,而且消耗原材料,尤其是在缺水的地區以及的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于一步深入研究。
  2. The penetration test study the disturbance of soil in difference location. by using finite element method, the paper study the stratum movement and the earth surface deformation caused by pipe jacking, analysis the construction parameter such as head pressure, deflexion, friction force impact on earth surface deformation, give the distributing rule and range of additional soil pressure in soil

    採用有限元計算分析的,對引起的地層運動及地表位移行研究,分析了機頭土壓力、機頭偏斜、摩阻力等不同參數對地表變形的影響以及附加應力在土中的分佈規律和影響范圍。
  3. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據程實踐,提出了用全站儀直接測量平距、高差來代替測斜距、天距作四等及四等以下控制網測量的理論依據和,並以張河灣抽水蓄能電站控制網為例行了比較計算。
  4. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的控制內容與,利用軟體sgkz2000對多座懸索橋行了計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的;介紹了吊梁階段鞍座推量的確定與控制,分析了階段懸索橋的線形變化過程。
  5. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體后等三種受力況,並用模型行了應力和變形的計算,計算各況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性行了計算分析;論文研究作表明,應用組合有限元計算大型結構問題具有現實意義。
  6. To get the goal, the paper detailed presents the two types different pipe jacking building technology and site test about the bigger caliber steel pipe in the course of pipe jacking by engineering example ; propose the concrete way of improving and perfecting the new technology in the air - power pipe jacking ; make progress on applicability and spreading in use on pipe - jacking ; detailed indicates the earth - pressure balance theory and handling technology on the key technology of pipe jacking which supply reference to pipe jacking construction in shanghai areac

    鑒于以上目的,本文通過程實例對兩種不同類型的技術及大口徑鋼管過程中的原體測試行了詳盡的介紹。提出了氣動管新技術的改、完善的具體,加大了其實用性及可推廣性;詳細闡明了土壓平衡理論、關鍵點的處理技術,對相關,特別是上海地區的,提供了可借鑒參考的依據。
  7. Construction method of the box - type structure jacking under the existing railway line

    既有線下箱涵的
  8. Then the formu1a of computing the maxima1 top shear stress in designing masonry bui1dings and the method of checking computations of cracks are brought forward in this paper on the basis of the theoretica1 deduce and the data of these tests and experiments. a1so, the practica1 construct methods and the requirements of preventing such cracks in the aspects of the construct rate. the strength and modulus of e1asticity of the masonry bui1dings are put forward

    隨后,本文在理論推導和試驗數據的基礎上,提出了在砌體結構設計中計算層最大剪應力的公式和是否開裂的驗算,並且從度、砌體的強度及彈性模量、構造柱和圈樑的設置等面提出了防止此類裂縫開展的具體和要求。
  9. This paper introduces the development history and structural characteristics of cable dome, which is a new long - span space structure, and classifies cable domes according to their structural characteristics ; discusses the theory, method and progress of the calculation model and fem analysis concerning cable domes, describes the construction method of cable domes, and reviews and forecasts the status of study on cable domes

    摘要介紹一種新型大跨空間結構索穹結構的發展歷程和結構特點,並對索穹結構行了分類;論述索穹結構在計算模型和有限元分析面的理論、展;闡述索穹結構的,並對索穹結構的研究狀況行回顧與展望。
分享友人