項材質 的英文怎麼說

中文拼音 [xiàngcáizhí]
項材質 英文
tomaterials
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : 名詞1 (木料) timber 2 (泛指可以直接製成成品的東西; 材料) material 3 (供寫作或參考的資料) ma...
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • 材質 : (材料質地) material quality
  1. Insulating materials - industrial rigid laminated sheets based on thermosetting resins for electrical purposes - specifications for individual materials - requirements for rigid laminated sheets based on melamine resins

    絕緣料.電工用熱固性樹脂基工業硬層壓薄板.單料規范.三聚氰胺樹脂基硬層壓薄板要求
  2. Specification for industrial rigid laminated sheets based on thermosetting resins for electrical purposes ; part 3 : specifications for individual materials ; sheet 3 : requirements for rigid laminated sheets based on melamine resins

    電工用熱固性樹脂工業硬層壓片規范.第3部分:單料規范.活頁3 :對三聚氰胺樹脂硬層壓片的要求
  3. A 、 head wear, plastron and trinket serial products with all kinds of material and novel design ; finger ring and necklace serial products ; foot ornament, adornment and article decoration serial products ; ear ring and waist decoration products ; chain ornament franchise store ; decoration accessories ; tie clip ; mobile phone decorations ; eyeglasses ; related machinery equipments etc

    各類設計新穎的頭飾、胸飾、手飾產品系列;戒指、鏈系列產品;腳飾、佩戴飾和物飾系列;耳環、腰飾產品;飾品連鎖加盟店;飾品配件;領帶夾;手機飾品;眼鏡;相關機械設備等。
  4. Conclusion volatile oil, acid - insoluble ash, water and synephrine with a definite content limit can be chosen as the parameters for the research of quality standard of frutus aurantii immaturus, which will supply evidence for the medicinal trade and research of frutus aurantii immaturus

    結論與現行藥典標準中枳實相比,本研究新增了酸不溶性灰分、水分、揮發油和辛弗林含量,可更有效地評價枳實藥量,為枳實藥的商品流通和研究開發提供依據。
  5. Meanwhile, based on the magnetic material theory, a complete analysis and summary are carried out on the three crystal structure and technology theory ; especially the ingredient analysis is made on the microscopical morphology and x - ray diffraction and its mixtures existence and relevant metallurgy about the typical second resource such as coldrolling iron and oxide red, steelmaking sludge and feso4 based on the practeal investigation of the pre - burning materials in domestic products plant, especially the analysis on the domestic markets and components, and connecting with reality and material characters in panzhihua iron and steel ( group ) cmpany, we established the product orientation and developing direction in panzhihua iron and steel ( group ) company ; after carrying out the technology reform on the old no. 1 magnetic product plant of enterprise company, making a detailed study on the various conditions for establishing a plant, the feasible research report is formed of 1400 tons ( per year ) feo preburning material and 3000 tons ( per year ) middle and high quality magnetic products ; so a necessary and reliable supports are provided both theoretically and practically for the development of the magnetic industry in panzhihua iron and s teel ( group ) cmpany

    同時,對磁性料的理論基礎,尖晶石、磁鉛石、石榴石三大晶系結構以及其工工藝理論進行了較為全面的歸納、分析和總結;尤其針對攀鋼產生的二次資源如冷軋鐵紅、煉鋼污泥、硫酸亞鐵等三種典型原料分別作了成分分析、微觀物理形態以及x光衍射分析、其夾雜物的存在形式及相應的金相分析。對國內鐵氧體磁性料的預燒料及磁件生產廠家的工藝、設備、技術、成本、量狀況進行了實地的調研,特別是對國內磁性料的市場及競爭對手進行了詳盡的分析,在此基礎上,結合攀鋼實際及原料特點確立了攀鋼發展磁產業的產品定位及發展方向;對企業公司原有磁件一廠進行了技術工藝改造,對建廠各條件進行了詳細的分析,形成了了年產14000噸年鐵氧體預燒料以及3000噸年中高檔磁件產品的可行性研究報告,從理論上和實踐上為攀鋼磁性產業的發展提供了必要的可靠的依據。
  6. Uea, a key research fruit of china construction material research institute, merges the pith of china expansion concrete, former ussr expansion concrete and usa expansion concrete, is a special concrete additive

    我公司的所有產品均按國家標準組織生產,產品量穩定可靠, u型混凝土膨脹劑uea是中國建築料研究院一重大科研成果。
  7. It can diagnose quantity limitation ( accident ) of building construction in construction period, and commentate the reasons, measures of prevent and disposal of the quantity limitation ( accident ). the user also can seek information about quality control of building construction in construction period ( quality standards, quality control point, quality control flow, quality of building material and build machinery, laws and regulations and so on )

    它包含了建築工程在施工階段各不同分部和分工程常見量缺陷(事故)的診斷、原因分析、預防和處理。用戶還可通過本系統查找建築工程施工階段量控制的相關資料(如量控制標準、量控制點、量控制流程、工程量控制、施工機械量控制及有關法規等) 。
  8. In accordance with the above captioned letter of credit requirements, we hereby certify that the above captioned shipment consists of new material and was manufactured in accordance with american buildings company quality control procedures as certified by the metal building manufacturers association and the american institute of steel construction

    根據上述題詞信用證的要求,我們特證明上述下貨物是採用新料並按美國建築公司量控製程序製造的,並得到金屬廠房製造商協會和美國鋼鐵建築研究院的認可。
  9. L / c no. : lc61393001 american buildings no. : 51 - 4744 dear sir / madam : in accordance with the above captioned letter of credit requirements, we hereby certify that the above captioned shipment consists of new material and was manufactured in accordance with american buildings company quality control procedures as certified by the metal building manufactures association and the american institute of steel construction

    根據上述題詞信用證的要求,我們特證明上述下貨物是採用新料並按美國建築公司量控製程序製造的,並得到金屬廠房製造商協會和美國鋼建築研究院的認可。
  10. In accordance with the above captioned letter of credit requirements, we hereby certify that the above captioned shipment consists of new material and was manufactured in accordance with british buildings company quality control procedures as certified by the metal building manufacturers association and the british institute of steel construction

    根據上述題詞信用證的要求,我們特證明上述下貨物是採用新料並按英國建築公司量控製程序製造的,並得到金屬廠房製造協會和英國鋼鐵建築研究院的認可。
  11. Necklace, earrings, ring, bracelet, collar pin materials : 22k swiss gold, emerald, yellow gemstones the bridge to paradise is a link between the earth and heaven, the melodious flow of the inner sound stream, and the promise and guidance of an enlightened master

    天堂的橋?耳環戒指手?領針: 22k黃金祖母綠黃寶石是人間與天堂的連系,是內在音流的悠揚,更是明師的承諾與引領。
  12. Slow down printing speed can take more time for toner transfer, avoid paper jam and increase color saturation. in the market, there are different types such as 4 5 ppm pages per minute, 16 ppm and over 20 ppm. fortunately, printing speed is possible to be controlled by selection icon of paper material

    降低列印速度的目的是讓碳粉有充份的時間移轉至紙張上藉以增加色彩飽和度同時可以避免卡紙發生,目前在市場上可以看到每分鐘列印4 5頁16頁及20頁以上等不同機型印表機,幸好可以使用挑選紙張的選來控制列印速度,建議列印速度在106 163 gsm 。
  13. The material framework is modular, so programmers can add not just new shader programs, but shader components which artists can connect with other components on - the - fly, resulting in dynamic composition and compilation of shader code

    引擎中的編輯器是獨立模塊化的,我們這樣做的目的是為了實際開發的編程人員能根據自己的目加入新的明暗生成器,並提供給美術人員進行使用,當然這是一種動態的合成並且要求編程人員得有可以編寫明暗生成器代碼的能力。
  14. Insulating materials - industrial rigid laminated sheets based on thermosetting resins for electrical purposes - specifications for individual materials - requirements for rigid laminated sheets based on silicone resins

    絕緣料.電工用熱固性樹脂基工業硬層壓薄板.單料規范.硅酮樹脂基硬層壓薄板要求
  15. Magnetic materials - part 8 - 1 : specifications for individual materials - magnetically hard materials

    磁性料.第8 - 1部分:單料規范.磁性硬
  16. According to the testing of national centre for quality of fire building materials, all technical requirements have attained or exceeded the native standard

    通過國家防火建檢中心全性能指標檢測,所有技術指標均達到或超過國家標準。
  17. However, the performance of thermoelectric materials can be optimized if various materials with different properties are arranged along the temperature axis to form a graded or laminated thermoelectric material. in the present work some homogeneous materials such as bi2te3 - and fesi2 - based thermoelectric materials as well as pseudo - binary alloys ( pbte ) 1 - x ( snte ) x ( 0 x 1 ) have been prepared, their thermoelectric properties have been measured, and the possibilities for constitution of laminated structures have been discussed. the processes for preparation of laminated thermoelectric materials and the thermal stress buffer layers sandwiched between thermoelectric material segments have been studied

    工作主要包括: 1 )均熱電料bi _ 2te _ 3基、 fesi _ 2基以及膺兩元合金( pbte ) _ ( 1 - x ) ( snte ) _ x ( 0 x 1 )的制備與性能研究,適合於製作梯度功能料的各種均熱電料的篩選; 2 )異種及近乎相同疊層料制備工藝的研究以及熱應力緩和層的研究) ; 3 )採用sem 、 edax 、 empa 、 xps等多種手段,對界面處微觀組織結構、擴散與反應的分析; 4 )採用數學建模計算及實驗測量,對兩元和多元疊層熱電料的結構設計以及性能和熱穩定性的研究。
  18. Specification for industrial rigid laminated sheets based on thermosetting resins for electrical purposes part 3 : specifications for individual materials sheet 3 : requirements for rigid laminated sheets based on melamine resins

    電氣用熱固性樹脂工業硬層壓板規范第3部分:單料規范第3篇:對三聚氰胺樹脂硬層壓板的要求
  19. Advice on materials used to build canoes and rowing boats for the summer games also forms part of the agreement, with other sports set to be included at a later date

    同時車隊也會針對夏季奧運會滑船賽艇目,在選擇合適的方面提供寶貴的建議,此外還有一些其他目也需要法拉力車隊的支持,不過具體時間要早稍後才公布
  20. The project to the construction phase quality control for research themes in a more systematic research 。 this defines the basic concepts of the project quality control and analysis of its main features, expounded china ' s project quality control model history and analysis of the traditional model of quality control deficiencies 。 in the use of statistical methods for more analysis and appraisal of the basis of this proposed backward quality control model is the low quality of project one of the major reasons why, in our current management system, project quality control model should be to implement the " prevention " and " people - oriented " reform direction perspective ; 5 affecting the quality of the project, namely, human factors, material factors, mechanical factors, factors and methods for the comparative analysis of environmental factors that control the quality of the construction phase, these five factors in essence controls the process ; establish quality assurance system. 。 in a detailed analysis of quality control in the construction phase of a project to the specific implementation of hainan, on the basis of quality control should be put forward " people - oriented " to the quality of work and ensure the quality of processes, promote project quality 。

    本文界定了工程量控制的基本概念並分析了其主要特點,闡述了我國工程量控制模式的歷史沿革,分析了傳統量控制模式存在的弊端。運用統計方法進行了分析論證的基礎上,本文提出了落後的量控制模式是工程量低下的重要原因之一,在我國現行管理體制下,工程量控制模式應以實施「預防為主」 、 「以人為本」為改革方向的觀點;對影響工程量的五個方面,即人的因素、料因素、機械因素、方法因素和環境因素進行了比較分析,指出施工階段量控制,實上就是對這五個方面的因素實施控制的過程;建立量保證體系。在詳細分析了施工階段量控制在海南某工程的具體實施情況的基礎上,針對性地提出了「量控制應『以人為本』 ,以人的工作量保工序量,促工程量」的觀點。
分享友人