項目進度 的英文怎麼說

中文拼音 [xiàngjìn]
項目進度 英文
project schedule
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 項目 : item; article; clause; subject of entry; [體育] event
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. During this process, the gci team will summarize, report, train, and provide a phase by phase implementation, so that clients can understand the true progress of their implementation

    在此過程中,我們將行階段性總結階段性匯報階段性培訓和階段性實施,確保客戶準確了解項目進度
  2. Resource scheduling of project network is one of the focus and nodus in the research of project management technology

    資源是影響、工期和成本的重要因素,資源計劃的失誤將會造成項目進度和投資標的失控。
  3. Follow up the progress of each six sigma project

    跟蹤每個六西格碼的項目進度
  4. Design and implementation of project scheduling management system based on critical chain method

    基於關鍵鏈技術的項目進度管理系統設計與實現
  5. However, the critical path of the project hinges mainly on the delivery of the equipment and engineering contracts where the lead time is usually longer than the construction schedule. with equipment and engineering contracts committed much earlier, the group does not expect any major deviation in the overall project commissioning timeline

    但設備和工程合約的付運是項目進度最關鍵的部份,付運期往往比施工期更長,而集團已預早簽訂了設備和工程的合約,因此整個上最終的竣工時間跟原有計劃應不會有太大的差距。
  6. 5 schedule control ? controlling changes to the project schedule

    控制控制項目進度的變更。
  7. Economical analysis of project schedule controlling objective

    工程項目進度控制標的經濟性分析
  8. Estimated durations that remain in your project plan as the project progresses are managed by microsoft project in the following ways

    Microsoftproject按照下列方式管理作為項目進度保留在計劃中的估計工期:
  9. For some, starting a new project plan means typing up task lists in a spreadsheet file, keeping a manila folder full of the names and qualifications of team members, and tacking up calendars on an office wall to track progress and workers ' schedules

    對一些人來說,新建計劃意味著:在電子表格文件中輸入任務列表,在厚厚的文件夾中塞滿工作組成員的姓名和資格證明,對著辦公室墻上的日歷塗塗畫畫,以及跟蹤項目進度和工作者的日程安排。
  10. A baseline is essential for tracking project progress

    比較基準對于跟蹤項目進度非常重要。
  11. Maintain records of actual project progress and submit progress reports to production planning dept. on a weekly basis, and co - operate with the project dept

    保持記錄實際項目進度和每周向生產計劃部遞交報告並且協調和部的關系。
  12. A way to track project progress by comparing original plan estimates against actual progress

    通過比較估計的計劃與實際項目進度行跟蹤的方法。
  13. Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control, the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program, cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method, factor estimation method, wbs estimation method and comparison estimation method, the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation. meanwhile, comprehensive quality management theory is introduced in the project " s schedule program. aiming at subsidiary project bidding, equipment purchase, essential quality inspection, detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep

    ( 3 )針對川塔施工建設具體需要,在充分體現事前規劃與全面控制相結合管理思想和所行的wbs結構分解基礎上,基於項目進度? ?費用成本? ?質量三者之間的關系,提出了基於cpm關鍵路線法的川塔項目進度計劃制定方案,實現了規劃與控制的緊密結合;在對比分析經驗估演算法、因素估演算法、 wbs估演算法、類比估算等方法和技術基礎上,制定了側重於預算的川塔成本基本規劃方法,以及結合市場經濟情況的成本控制策略;同時將全面質量管理思想,引入了施工方案中,針對子招標、設備采購、重點質量監控點等設立了詳細的質量保障機制和細則,以確保達到工程優質建設的標。
  14. Lastly, in the terms of controlling the schedule and the cost, we cancelled the previous methods that time was indicated the schedule and that amount of capital invested was calculated the project schedule. we calculated the realistic project schedule by the means of the earned value that we calculated amount of capital required using the working procedure, in the meantime, we applied the analysis of the cost current curve to achieve the cost and the schedule integrated

    與費用控制上,改變原來用時間表示項目進度或用完成投資額來計算項目進度的做法,用完成工序(或工作量)相應的計劃資金需求量,稱為掙值( earnedvalue ) ,來計量的實際,利用費用流曲線的分析,實現了費用與的聯合控制。
  15. Be responsible for process design to meet the requirements of customer project

    負責新產品過程開發,滿足客戶項目進度要求。
  16. Must be able to work in a multi - disciplined engineering environment, often with demanding project schedules

    必需能在有嚴格要求的工程環境中工作,並能適應苛刻的項目進度安排。
  17. Project procurement management. the primary goal of project management is the management of cost, time and quality. the project management information system ( pmis ) is a kind of management information system ( mis ) that used in project management

    管理是貫穿于整個生命周期內的管理,主要包含九個方面的內容: 1 、綜合管理; 2 、范圍管理; 3 、項目進度管理; 4 、投資費用管理; 5 、質量管理; 6 、人力資源管理; 7 、通訊管理; 8 、風險管理; 9 、采購管理。
  18. Meeting project schedule objectives by rushing planned quality inspections may produce negative consequences when errors go undetected

    通過使用計劃的突擊質量檢查方式來達到項目進度標可能在錯誤沒有被發現的情況下產生消極後果。
  19. While, study the scheduling bayesian network to model software project scheduling risk. the modeling method, related calculation and probability inference algorithm are presented

    貝葉斯網路的研究中,給出了軟體項目進度風險的建模方法、模型中的相關計算以及概率推理演算法。
  20. To record all the projects strictly in compliance with the approved plan of capital expenditure and expense expenditure, and estimate the cost and liability in accordance with the progress of the projects

    嚴格按計劃批復的資本性支出和費用化支出行核算,每季末依據工程項目進度預估成本及負債。