順序控製程序 的英文怎麼說

中文拼音 [shùnkòngzhìchéng]
順序控製程序 英文
sequence control program
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁造由鋼筋工、模板工、混凝土工、預應力工、移存梁工、孔道壓漿工、梁體封端工、橋面防水層和保護層工等施工環節組成。文中介紹的採用胎具作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. Abstract : the paper introduced calculation of plane cam curve detailly and compiled nc programs with the apt that ran good and imitated its pattern. the author analysed error of the program and its controls

    文摘:詳細地介紹了平面凸輪曲線的計算方法,分析了編誤差及其制辦法,並用apt國際標準語言編制出平面凸輪的數加工,該利通過運行並進行圖形模擬。
  3. For the measurement of analog signals such as voltage and current of astg, a filter card for pre - disposing is designed, in order to improve real - time performance, algorithms for ac analog sampling is simplified, and a compensation algorithms for phase error due to sequence - sampling is brought forward. for the measurement of impulse - width signals such as rotor - speed and rotor - position - angle, an intelligent interface card based on isa bus is designed. all programs for measure and control based on c + + are compiled and debugged and the flow for system debugging is summarized

    為了提高實時性,對交流采樣演算法進行了簡化,並提出了由於非同步采樣所造成的相位誤差的補償演算法;針對轉速、轉子位置角等脈沖寬度信號的測量,深入分析了測量原理,設計了基於isa總線的智能介面卡;編制和調試了基於c + +的全部測量;完成了整個系統的調試,並總結了調試方法。
  4. In vse, an index that is used by the system control and service programs to locate one or more sequential blocks of program information that are stored on direct access storage

    在虛擬擴充存儲系統( vse )中,系統和系統服務使用的一種索引,用於對存儲在直接存取存儲器上的一個或多個信息塊進行定位。
分享友人