順序調度系統 的英文怎麼說

中文拼音 [shùndiàotǒng]
順序調度系統 英文
sequential scheduling system
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  • 調度 : 1 (調遣) dispatch (trains buses etc ) 2 (調度員) dispatcher 3 (安排) manage; control 4 (...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. To deal with the difference on operating system level, this paper designs a thread - level algorithm based upon priority inheritance protocol to prevent priority inversion. a dynamic priority mapping and scheduling algorithm to achieve strict order is also presented. through analysis of multi - threaded execution order under fixed priority scheduling model, a multithreaded programming model with totally predicable execution order is proposed

    針對各種操作的差異,本文提出了基於優先級繼承協議的線程級防優先級翻轉演算法,提出了能夠嚴格保的動態優先級映射方法及相關的調演算法,通過研究固定優先級調下的多線程執行問題,本文還提出了一種執行可預測的多線程程設計模式。
  2. I also summarized briefly the qualifications for tender agency, factors which would block the development of tender agents and the countermeasures, a nd anticipated the foreground of its development in water conservancy systems of hebei province, and then, i advanced my suggestion on the standardization of tendering and bidding procedures in the relevant projects ; i also analyzed the insufficiencies of decision - making system, documents study and circumstances research in the tenders. at the same time, i introduced the skills and strategies in the tendering and bidding, and advanced my analysis results and suggestions. through the introduction of the procedure from opening to evaluating and deciding the tenders, and the scores registration method on evaluating tenders, i pointed out the status quo and main problems occurred in the tendering and bidding in the construction of water conservancy projects in hebei province, and put forward my suggestion on the system of opening, evaluating and deciding of tender in the projects

    在對招標人、招標代理機構和招標過程的法律規定與分析后,指出河北省水利工程建設招標人和河北省工程建設招標代理機構的現狀及存在問題,提出了市場經濟條件下,最合理的招標組織形式為招標代理,並簡述了招標代理機構的資格要求、河北省水利工程建設管理機制中阻礙招標代理機構利發展因素及對策,預測了招標代理制在河北省水利的發展前景,對進一步規范河北省水利工程招標活動提出建議;對投標過程中存在的投標決策、招標文件研究、投標環境調查不足之處進行了分析,同時介紹了河北省水利工程建設投標報價技巧及策略,對河北省水利工程投標活動現狀及存在問題提出規范化的分析和建議;通過對水利工程開標、評標、定標運行程和河北省水利工程評標計分辦法的介紹,指出了河北省水利工程建設招標投標定標運行的現狀和存在的問題,提出了河北省水利工程建設開標、評標、定標運行體的建議。
  3. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖對大型地下洞室群圍巖穩定性的影響。
  4. ( 2 ) theoretical analysis of optimal theory for cascade hydropower station applying decision support system to carry out rational river planning in stepped exploitation includes cascade station arrangement, selecting optimal parameters of indropower station, decision of stepped exploitation order and optimal dispatching for reservoir etc. for uncertain problems, decision support system only supplies an auxiliary decision to the decision maker, not taking the place of decision maker

    ( 2 )水電站優化調的理論分析在梯級開發中應用決策支持進行合理的梯級規劃,包括梯級的布胃、水電站參數的最優選擇、梯級開發決策和水庫運行的優化調等問題。在對不確定性問題上,決策支持給決策者只是提供輔助決策,而不是替代決策者。
  5. Gets or sets a value used by the operating system to prioritize thread scheduling

    獲取或設置操作用於確定線程調優先的值。
  6. For the measurement of analog signals such as voltage and current of astg, a filter card for pre - disposing is designed, in order to improve real - time performance, algorithms for ac analog sampling is simplified, and a compensation algorithms for phase error due to sequence - sampling is brought forward. for the measurement of impulse - width signals such as rotor - speed and rotor - position - angle, an intelligent interface card based on isa bus is designed. all programs for measure and control based on c + + are compiled and debugged and the flow for system debugging is summarized

    為了提高實時性,對交流采樣演算法進行了簡化,並提出了由於非同步采樣所造成的相位誤差的補償演算法;針對轉速、轉子位置角等脈沖寬信號的測量,深入分析了測量原理,設計了基於isa總線的智能介面卡;編制和調試了基於c + +的全部測量控製程;完成了整個調試,並總結了調試方法。
  7. In the paper, the situation and method of scheduling problem studied of automated warehouse are surveyed completely. the problems of automate guide vehicle transport and stack crane picking order are analyzed deeply in parcel post automated warehouse, basic mathematic model of scheduling is set up

    通過對郵包自動化倉庫中的自動導引小車運輸問題和巷道堆垛機的揀選認真地分析,建立起了調的基本數學模型,提出了用總的空載時間作為目標函數,並且把這兩類問題都歸結為求解旅行商問題。
  8. All of these make the new teaching materials more agile and practicable. in content structure, above all, the two series of teaching materials are consistent with each other in knowledge structure, while the new ones increase and delete some knowledge points, which make the backbone stand out and the arrangement evident ; the structure of the new materials run reasonably through adjusting the sequence of certain paragraphs ; secondly, in capability structure, compared with the old ones, the new teaching material enhance the ability - trained degree, which acclimate the demand of eqo education ; thirdly, in deal - educated structure, the new teaching materials enlarge the connotation of idea quality training, instruct students in various ways, enhance the teaching materials educational value. in a word, the new teaching materials make a great progress in structure than the old ones

    從實質結構看,首先,在知識結構上,新教材與舊教材的知識體大體保持一致,但是新教材通過增刪許多知識點,使教學內容主幹突出、層次分明,並更加貼近生活、聯社會;通過調整某些章節的編排,使「三」更好地結合起來;其次,在能力結構上,與舊教材相比,新教材分別在課文、實驗、練習中加大了能力培養的力應了當前素質教育對學生提出的要求;最後,在思想品質上的培養方面,新教材擴展了思想品質培養的內涵,從多方面入手,採用多種方式教育學生,增強了教材的思想價值
  9. The construction processes of large - scale underground structure group are very complicated. in order to quicken the construction processes, reduce price and assure success, it is necessary that adopting scientific system simulation method to simulate the whole construction processes, to make all tunnels, all activities and all machine equipment harmonious and make construction sequence schedule reasonable

    大型地下洞室群施工過程是極其復雜的,採用科學的模擬方法對地下洞室群施工全過程進行模擬,使各洞室、工及施工機械設備相互協調配合,使洞室群施工和施工進計劃更加合理,對于加快洞室群施工進,降低工程造價,保證工程利進行非常必要。
  10. After analyzing the characteristic of the parallel processing system, some problems about design missile - carrying processing system are pointed out ; network in the parallel processing system has become bottleneck and affect the performance of system, so the processing efficiency is analyzed in a multiprocessor system based on cluster - bus and some rules in designing the network in the multiprocessor system are brought out ; genetic algorithm is used for scheduling in the multiprocessor system, and a scheduling algorithm is described to suit arbitrary number of tasks, unequal task processing time, arbitrary precedence relation among tasks and arbitrary number of parallel processor, so that the schedule length will be minimized ; finally, an atr algorithm is mapped to a ring multiprocessor system, and a block diagram using dsp device is constructed. in chapter 4, the study is performed on real - time system hardware realization of atr. tms320c80 is selected as the kernel processor in multiprocessor system

    為此,對一種由常用的dsp晶元組成的多處理器的處理器利用率進行了分析,提出了多處理器互連網路設計的基本原則;本章使用遺傳演算法作為實現多處理器調的工具,提出了一種新的任務調演算法,該演算法主要是為了解決在任務數任意、任務計算時間不相等、任務前趨關任意、以及任務間存在通信和考慮任務存貯器要求的情況下,如何優化任務在各個處理器上的分配和執行,使得多處理器總的執行時間最小;最後對一個目標識別演算法進行了硬體實現優化分析,根據分析結果,將演算法映射到由dsp晶元組成的環形網路連接的處理器拓撲結構上,得到了多處理器的原理框圖。
  11. The first is the interface of software and hardware which is based on opc technology, its function is building the communication between the devices and the function components ; the second is the control module which corresponds with all of the function components according to the task and process ; the third is fms configurable components module, it can provides not only the friendly operation environment but also the configurable operation interface in line with the layout of devices on the workshop. on this basis, a prototype system is developed, by which the control system of the flexible manufacturing system is constructed for the teaching fms system in the cims center of college

    基於opc技術的軟、硬體介面模塊,它實現了fms的各功能組件對底層設備的數據實時採集和控制指令的下達; fms調控制模塊,它根據加工任務和加工路徑要求,協調並控制著fms各個功能組件之間的邏輯動作操作; fms組態配置模塊,它不僅提供了友好的人機操作界面環境,而且還可依據現場設備布局的具體情況進行界面的組態布局配置。
  12. What is more, based on the computing model of the finishing time per piece of flow shop scheduling in the parallel movement, the paper analyzes the subordinate function of its finishing time per piece in respective conditions of definite due date and fuzzy due date, and mutual relationship of two objective functions between minimization of delayed term and maximization of general satisfaction, pointing that the former is the subset of the latter. and representing the satisfaction level of the manager toward finishing time of the piece with the subordinate function of fuzzy due date, making general satisfaction level as objective function, the paper accordingly sets up a mathematical model in the condition of fuzzy due date, and designs a computer simulating system in light of genetic algorithm to carry on an emulation experiment

    在平行移動方式下flowshop調問題的工件完工時間的計算模型基礎上,分析了帶固定交貨期和模糊交貨期時該問題的工件完工時間的隸屬函數,及總拖期最小化和總滿意最大化這兩個目標函數的相互關,指出前者西南交通大學博士研究生學位論文第頁問題是後者問題的一個子集,用每個工件模糊交貨期的隸屬函數表示決策者對該工件完工時間的滿意,以總滿意為目標函數,相應地建立了該問題下帶模糊交貨期的數學模型,設計了一個基於遺傳演算法的計算機模擬進行模擬試驗,結果是令人滿意的。
  13. A novel fiber bragg grating sensors multiplexing system which combined with hibi flm and f - p filter is put forwarded. the experiment and the theory analysis demonstrated that the system only scan and demodulate sensing channels, whose wavelength is shifting. what ’ s more, the smart fbg sensors multiplexing system can rule the demodulate sequence by the priority, the waiting time and the wavelength shifting of every sensing channels

    3 .提出基於ingaas陣列和f - p濾波器的智能化復用,該只對感測到被測量變化的傳感器進行掃描解調,並可根據每一個傳感器的優先權、信息等待時間和信號變化大小等靈活設定掃描解調,平均解調也得到提高。
  14. Then, mif - a real - time scheduling algorithm, is introduced and implemented on the client, which makes multitasks be performed with reasonable sequence according to actual need and runtime be predictable. thus system ' s qos is enhanced, and visibroker ' s real - time performance is improved

    然後引入mif實時調算潔,並在客戶端實現,使得多個任務能夠根據實際需要按合理的執行,運行時間也可預測,這樣就提高了服務質量,從而改善了visbroker實時性能。
  15. A queue of new messages ( or a group ) within a system that are awaiting processing. the main scheduling routine will scan them along with other queues and order them into processing in order

    中等待處理的一組或一隊列新信息,主調對該隊列及其它隊列進行掃描,使之進入處理狀態。
分享友人