順序調度 的英文怎麼說

中文拼音 [shùndiào]
順序調度 英文
sequential scheduling
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  • 調度 : 1 (調遣) dispatch (trains buses etc ) 2 (調度員) dispatcher 3 (安排) manage; control 4 (...
  1. To deal with the difference on operating system level, this paper designs a thread - level algorithm based upon priority inheritance protocol to prevent priority inversion. a dynamic priority mapping and scheduling algorithm to achieve strict order is also presented. through analysis of multi - threaded execution order under fixed priority scheduling model, a multithreaded programming model with totally predicable execution order is proposed

    針對各種操作系統的差異,本文提出了基於優先級繼承協議的線程級防優先級翻轉演算法,提出了能夠嚴格保的動態優先級映射方法及相關的調演算法,通過研究固定優先級調下的多線程執行問題,本文還提出了一種執行可預測的多線程程設計模式。
  2. Not only the order of children ' s development in both body and soul should be paid attention, but also the characteristics of different students " personalities should be known, in order to prompt the harmonious development of the three aspects of " personality and sociality ", " body and soul " and " virtue, intelligence, body, beauty and weltanschauung "

    不僅要注意兒童的身心發展,而且還要了解不同學生的個性特點,最大程的促進他們在個性與群性,身與心,德、智、體、美與世界觀三方面的協調發展。
  3. An improved design is proposed for blasting demolition of this kind of brick - concrete structure with good overall performance and great stiffness. wherever possible, it is desirable to increase blasting height to arrange blasting cut on the back of building in direction of dumping the building blasted and to adjust the initiation order by using sectional blaster cap

    認為對于整體性好、剛大的磚混結構樓房的爆破拆除,在條件允許時應多處理幾層以增加爆高,在樓房的傾倒背面也應布置爆破切口,還應採用分段雷管來調整其起爆,這樣才能達到更好的效果。
  4. Russia improved version of the box, each box whereabouts of the three, with the majority of games similar to the box game, with han fei officials and mrs. p spent moving love story long. operations guide : the next adjustment box about the sequence and speed

    俄羅斯方塊的改良版,每次下落三個方塊,與大多數方塊游戲類似的游戲模式,伴隨韓飛官和譚花磷的動人愛情故事源遠流長操作指南:上下左右調整方塊的和速
  5. Introduction : russia improved version of the box, each box whereabouts of the three, with the majority of games similar to the box game, with han fei officials and mrs. p spent moving love story long. operations guide : the next adjustment box about the sequence and speed

    攻略:俄羅斯方塊的改良版,每次下落三個方塊,與大多數方塊游戲類似的游戲模式,伴隨韓飛官和譚花磷的動人愛情故事源遠流長操作指南:上下左右調整方塊的和速
  6. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖對大型地下洞室群圍巖穩定性的影響。
  7. In packet switching network the essential assignment of packet scheduler is to determine the order and time slot of packets service and satisfy the qos requirement. the research work in this paper is implemented through computer simulations. the whole paper is organized as follows

    在分組交換網路里,當有多個分組業務流等待接受服務時,必須確定合理的服務規則,安排流的服務和服務時間,以滿足各個業務流的qos要求,這就是分組調所要解決的基本問題。
  8. On one hand, technological difficulty exists in determining the number and flood routing for dam system. on the other hand, for dam system security and stability, single dam ’ s designing should take flood control standard of dams, hinge composing, building sequence as well as years of filling up into account

    一方面壩系整體調洪、數量的確定技術難大,另一方面,小流域壩系中單壩的設計必須綜合考慮上下游壩的防洪標準、樞紐組成、建設、淤積年限等情況,才能保證壩系的安全和穩定。
  9. After analyzed the basic principle of optimized noise reduction on tyre pattern, summarized three approaches to noise reduction. the first is trying to reduce size of single block or socket to reduce noise amplitude on time domain, the second is to adjust stripes sorting order and their interlace value to avoid noise - made by every single block - peak values on time domain overlayed and the last is to adjust ratio of blocks and sockets, ratio of stripe interval and stripe sorting order to avoid noise periodical distribution and abnormal high peak values in some frequency strip

    論文第四章分析了輪胎花紋優化降噪的基本原理,總結出三條降噪途徑:在允許范圍內盡量減小單個塊或槽的大小、刻刀槽軟化花紋塊來減小噪聲時域波幅調整節距排列、花紋條之間的錯位值,使各發聲單元發出的聲壓時域波形的同向峰值錯開,避免同向峰值疊加;調整花紋塊和槽比例、節距比例、節距排列,盡量避免周期性分佈,使輪胎所發出的噪聲趨于白噪化,避免某些頻段的異常高峰值。
  10. ( 2 ) theoretical analysis of optimal theory for cascade hydropower station applying decision support system to carry out rational river planning in stepped exploitation includes cascade station arrangement, selecting optimal parameters of indropower station, decision of stepped exploitation order and optimal dispatching for reservoir etc. for uncertain problems, decision support system only supplies an auxiliary decision to the decision maker, not taking the place of decision maker

    ( 2 )水電站優化調的理論分析在梯級開發中應用決策支持系統進行合理的梯級規劃,包括梯級的布胃、水電站參數的最優選擇、梯級開發決策和水庫運行的優化調等問題。在對不確定性問題上,決策支持系統給決策者只是提供輔助決策,而不是替代決策者。
  11. Furthermore, it was acquired that the parameters of gecko gait ( such as gait period, stride length, duty factor ) and the angle curve of each leg according to the actual motion of them from the recorded datas which was processed and analyzed by computer programme. finally, it is concluded as the following : the angle variation of legs can be repeated during the motion ; in accord with each surface, it is varied that the gecko gait such as the period in which each leg is landed in surface, the sequence in which each leg was whether lift in advance or not during the motion. the motion speed of gecko is changed by adjusting the duty factors of each leg on the same surface

    通過對實驗結果的分析比較,得出:運動過程中各腿腿部角的變化過程具有明顯的規律性;不同表面上壁虎各腿的支撐狀態(各腿的支撐時間及抬、落腿的先後)各不相同;相同的表面上,壁虎的爬行速的變化主要是通過調整各腿的負荷因數而實現的;相同的表面上,壁虎以不同的速運動時,其步態(各腿抬、落腿的先後)是相同的。
  12. A completion time algorithm for the multiproduct batch scheduling problem in mixed intermediate storage ( mis ) policy is proposed. the transfer time, sequence - dependent setup time of equipment, and the effect of double transferring are considered in the algorithm

    提出了混合中間存儲策略下多產品間歇生產過程調問題的一種完成時間演算法,該演算法考慮了產品傳輸時間,與產品生產有關的設備準備時間,中間存儲清洗時間以及中間存儲「雙傳輸」對完成時間的影響。
  13. When the outcome of some computation depends on how two or more processes are scheduled, the code is incorrect. we say that there is a race condition

    當計算結果依賴于兩個或更多進程被調,我們說這段代碼是錯的,這種情況被稱為競態條件,也叫競態或競爭。
  14. On such a basisthe commonly used monomial error accumulating totals correction method is introduced. the author proposes a coordinate transformation method to deal with its drawbacks of maths model imperfection, not applicable to lange - angle deviation and adding to the difficulties of equipment. while orientating the order of matrices according to the principle of the accordance between coordinate ' s rotating order and the physical process of device measuring, a strict maths model of the influence of axis system deviation on surveying angles is concluded and the corresponding correction method is induced. its far - reaching meanings are as follow : ( 1 ) the maths model of the influence of axis system deviation on surveying angles established by the new method is concluded after considerations for the three deviations simultaneously. changes under all circumstances are included, so it is theoretically a perfection of maths method

    在此基礎上介紹了國內目前採用的軸系偏差對測量角影響的經典改正方法?單項差累計改正法,並針對該方法存在的數學模型不完善、對大角偏差不適用、增加設備調整難等缺陷,提出採用坐標變換方法,並根據坐標的旋轉次與設備測量的物理過程相符合的原理定位各矩陣的先後,推導出了軸系偏差對測量角影響的嚴格數學模型,歸納建立了相應測量角的改正方法。
  15. Gets or sets a value used by the operating system to prioritize thread scheduling

    獲取或設置操作系統用於確定線程調優先的值。
  16. The tree - based approach used for jibx code generation ends up constructing methods in this depth - first order anyway, so the duplicate checks work as long as there are no cycles in the method call graphs mutually recursive methods

    Jibx代碼生成所使用的基於樹的方法總能按照深優先構造方法;如果在方法調用圖中沒有循環(方法的相互調用) ,重復檢查是有效的。
  17. Chief officer, i ' m foreman. i need stowage plan and the loading sequence

    大副,我是碼頭調,我需要船舶配載圖和裝船
  18. For the measurement of analog signals such as voltage and current of astg, a filter card for pre - disposing is designed, in order to improve real - time performance, algorithms for ac analog sampling is simplified, and a compensation algorithms for phase error due to sequence - sampling is brought forward. for the measurement of impulse - width signals such as rotor - speed and rotor - position - angle, an intelligent interface card based on isa bus is designed. all programs for measure and control based on c + + are compiled and debugged and the flow for system debugging is summarized

    為了提高實時性,對交流采樣演算法進行了簡化,並提出了由於非同步采樣所造成的相位誤差的補償演算法;針對轉速、轉子位置角等脈沖寬信號的測量,深入分析了測量原理,設計了基於isa總線的智能介面卡;編制和調試了基於c + +的全部測量控製程;完成了整個系統的調試,並總結了調試方法。
  19. This paper integrates the new ancillary services theories and the practice in our power industry reform and focuses on the following contents : 1. the structure of the ancillary services markets which are independent on the energy market ; 2. the optimally coordinated model of energy and ancillary services, and the method which com bines the sequential dispatch and the simultaneous dispatch ; 3. a new study on how to bid in ancillary services markets ; 4. the model of interruptable load in reserve market ; 5. the method of distributing the fixed cost of the special transmission services

    本論文把新型的輔助服務理論與我國的改革實踐相結合,主要對以下幾方面進行了研究: 1獨立於主市場(電能市場)之外的輔助服務市場結構; 2發電市場與輔助服務市場協調優化調的數學模型和一種由順序調度法與同時調法結合而成的最優協調調方法; 3
  20. Solving scheduling problems of rolling sequence with an adaptive genetic algorithm

    用自適應遺傳演算法求解軋制順序調度問題
分享友人