預制安裝 的英文怎麼說
中文拼音 [yùzhìānzhuāng]
預制安裝
英文
prefabrication-
Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines
安裝的預制混凝土污水管道的表面滲入和滲出的驗收檢驗的標準實施規程Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines metric
安裝的預制混凝土污水管道的表面滲入和滲出的驗收檢驗的標準實施規程Precast pier - head segment erection with lifting frame
用吊架安裝橋墩柱頂預制構件A special steel spreader beam was used to erect the fabricated cage in its proper position in the roadway structure.
使用一個特製的鋼托架來安裝預制的錨固橫梁的鋼筋骨架,使其就位於上部結構內預定的位置上。Code of practice for design and installation of non - loadbearing precast concrete cladding
無負荷預制混凝土護板設計和安裝實用規程Once has the bandits and thieves to intrude guards against the place, the detector launches the wireless coded signal immediately, the networking center number which installs when is apart from defense area 150 meter within the main engine to send out the police whistle sound to report to the police immediately, reports to the police dials to establish in advance or reports to the police the telephone, the handset number, answers in the police telephone to return puts user pre - record to report to the police the pronunciation, long - distance reports to the police, simultaneously comes the real - time transmission through the internet to deploy troops for defense, to withdraw from a defended position, to report to the police and so on the condition, inquires the historic record through the computer network
該系統還採用美國進口原裝晶元與先進的無線數字高頻技術微電腦cpu控制器主機組成。在防範地點安裝好主機后,並設置在布防狀態。一旦有盜賊闖入防範地點,探測器立刻發射無線編碼信號,安裝在距防區150米以內的主機立即發出警笛聲報警,報警時撥打預先設定的聯網中心號碼或報警電話手機號碼,接警電話里回放用戶預錄的報警語音,遠程報警,同時通過網際網路來實時傳遞布防撤防報警等狀態,通過電腦網路來查詢歷史記錄。Editor - in - chief : rule for making water works budget jiangshu province ( edition in 2000 ) ; 2 ) editor - in - chief : auditing report for a key project - diverting cleaning water by qiangwei river ( first step ) ; 3 ) editor - participated : budget norm form water works construction and installation ( edition in 1999 ) ; 4 ) business consultation and management for water works budget
主編江蘇省水利基本建設工程設計概算編制規定( 2000年修訂本) ; 2 ) 、主寫省重點水利工程(薔薇河送清水一期工程)審計報告; 3 ) 、參編江蘇省水利建築、安裝工程預算定額( 1999年修訂本) ; 4 ) 、全省水利工程造價管理業務咨詢。The meijiayi mjy channels therapeutic apparatus developed by our company, combines the advanced microcomputer technics with the profound traditional chinese medicine methods as well s the human channelss science, magically takes advantages of modern electronic technics and the outer treatment of chinese medicine, realistically simulated the effects like acupuncture, aprapathy, essage, eating, kin scraping and cupping, etc. which improve the comprehensive effects, especially for the common ailments and geriatric diseases in digest digestive system, respiratory system and nervous system
旋翼式多流束濕式基表,雙脈沖采樣方式進行數據採集,採用計算機技術進行數據處理顯示控制閥門動作。它採用獨特的卡口安全及保護措施動態安全可靠的ic卡加密機制先進的硬體及軟體的容錯處理性能安全可靠,具有精度高自身功耗低體積小壽命長便於安裝等特點。能準確實現用水計量及實現預付費功能。The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended
針對以上問題,筆者認為:應該了解建築產品價格與工程造價、工程價格是如何界定的、比較建築產品的計劃價格、浮動價格與市場價格的含義,搞清楚工程造價的構成和建築安裝工程費用的構成以及竣工結算價格與決算價格的區別;通過分析、比較建築產品的「社會平均生產成本」和「企業個別生產成本」的計算依據和構成內容,從招標投標的設計機制的功能和實施招投標的目的來分析,確認在評標中剔除低於成本價標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計價依據的施工圖預算方法與招標投標之間存在悖論,工程量清單計價的推行是對建築產品市場價格形成改革的推進,也是建築產品價格形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設工程工程量清單計價規范》具有推進建築市場價格形成的諸多優勢,但仍存在不足與需要完善的地方。Aiming at the right control method of girder the springing quantum of the pc beams, analyzing the major factors which influence the change of girder, establishing control measures, observing and researching through experiment, the thesis make some pilot studies in liuguhe bridge ' s beforehand producing, building up and constructing, which belongs to the eighth contract segment of the beijing to shenyang expressway
本文主要依託京沈高速公路國內段第八合同段六股河大橋30m跨徑預應力混凝土工型梁預制安裝施工開展研究,分析影響主梁拱度變化的主要因素,制定控制措施,進行試驗觀測研究,從而確定適宜的拱度控制方法,較好地控制了主梁的拱度。This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed
再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。Using crane to hoist and construct bridge is characteristic of simple in constructional machines, easy in operation, low in cost, short in construction time, safety and good quality
摘要採用起重機吊裝預制梁,具有施工機具簡單、易於操作、成本低、工期短、質量安全易於保證等優點。Standard practice for installation of precast concrete sewer, storm drain, and culvert pipe using standard installations
使用標準設備安裝預制混凝土下水道暴雨下水道和涵管的標準實施規程Three auto - gates, alternatively known as e - channels, have been rolled out at the lo wu control point since december 16, 2004. about 270 e - channels will be installed at control points by phases and the project is targeted for completion in mid 2006
羅湖管制站由二零零四年十二月十六日起開放三條自助檢查通道,亦稱e -道,而稍後,約270部e -道亦會分階段在各管制站安裝,預期會在二零零六年年中全部完成。Three auto - gates, alternatively known as e - channels, have been rolled out at the lo wu control point since december 16, 2004. about 270 e - channels will be installed at control points by phases and the project is targeted for completion in mid 2006. visit of macao permanent residents made easy
羅湖管制站由二零零四年十二月十六日起開放三條自助檢查通道,亦稱e -道,而稍後,約270部e -道亦會分階段在各管制站安裝,預期會在二零零六年年中全部完成。These systems support self - service immigration clearance for smart identity card holders. three auto - gates, alternatively known as e - channels, have been rolled out at the lo wu control point since december 16, 2004. about 270 e - channels will be installed at control points by phases and the project is targeted for completion in mid 2006
羅湖管制站由二零零四年十二月十六日起開放三條自助檢查通道,亦稱e -道,而稍後,約2 7 0部e -道亦會分階段在各管制站安裝,預期會在二零零六年年中全部完成。Prefabricated accessories for roofing. installations for roof access. walkways, treads and steps
屋頂頂蓋預制附件.屋頂通道的安裝.步橋.踏板.單踏板Totaling 216 piers of the bridge completed installation in the deepwater area in the yangtze river on saturday
當日,上海長江大橋深水區216節墩柱全部預制安裝完成。Cdcs low - voltage switchgear and controlgear assemblies - part 5 : particular requirements for assemblies intended to be installed outdoors in public places - cable distribution cabinets for power distribution in networks
低壓開關設備和控制設備組件.第5部件:室外公共場所中預期安裝組件的特殊要求.電網中配電用電纜配電盒Package files have different formats and contain different control files that determine where the rest of the files should be placed, the permissions they should have and a list of prerequisite packages that are required for the package to function correctly
軟體包有不同的格式而且包含不同的控制文件,這些控制文件決定軟體包中其餘文件應該存放的位置和它們應有的權限,以及一個包含有預先應該安裝的軟體包的列表,這些預先安裝的軟體包是為了保證即將安裝的軟體包正常工作而必需的。分享友人