預埋螺栓 的英文怎麼說

中文拼音 [máiluóshuān]
預埋螺栓 英文
inserted bolt
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 1. [動物學] (軟體動物) spiral shell; snail; conch 2. (螺旋形的指紋) whorl (in fingerprint)
  • : 名詞1. (可開關的機件) bolt; plug 2. (塞子) stopper; cork
  • 螺栓 : bolt; screw bolt; threaded bolt
  1. The anchor bolts and nuts must be processed and used as a whole set. the embedded anchor bolts for equipment foundation shall be installed and fixed with positioning forms

    地腳母必須配套加工,配合使用。設備基礎的地腳採用定位模板安裝固定。
  2. A according installation size of pumps to do beton - base, at the same time bury the bolt beforehand

    1按泵的安裝尺寸做好混凝土基礎,同時好地腳
  3. The bracket and vertical column of cable tray will be installed by welding or expansion bolt of the basement. the welding place treatment will be done by painting

    橋架的立柱、托臂等支架可與基礎件焊接固定,也可採用膨脹固定,對于現場焊接處一定要做好防腐處理,通常由用戶現場塗刷防腐漆。
  4. Top - directly as a basis and foundation of the bearing surface as the top - embedded steel bearings or bearing surface, the supporting surface, the anchor bolt ( anchor ) position should be consistent with the allowable deviation of norms

    基礎頂面直接作為柱的支承面和基礎頂面鋼板或支座作為柱支承面時,其支承面、地腳(錨)位置的允許偏差應符合規范的規定。
  5. In this thesis, a series of single and double - direction - load tests are carried on the single plate framing connection between truss - steel beam and concrete wall often used in tall - building. by single - direction - load tests, the flexure capacity of the joints in use of different design is researched in particular, the effect of bolt design on the flexure capability is analysised ; based on the cyclic loading experiment, such characteristics of the anchors are analyzed -. bearing capacity. rigidity, ductility, hystersity capacity, energy dissipation and failure phenomena

    通過單向靜力試驗,研究了單剪板連接的不同設計對鋼架梁的約束能力的變化,重點討論了的設計對約束能力的影響;通過周期性反復加載試驗研究了不同設計的單剪板連接件的抗震性能的不同,重點分析了結構的承載能力、剛度、延性、滯回性能、耗能能力及其破壞特徵等。
  6. Abstract : connected with the practical project, the paper tries to discussthe problem of anchor bolt setting in large - scale power equipment ' s foundation such as fan and electromotor used in removing dust project, analyzes the feasibility of a new grouting method in pre - setting hole and puts forward its popularization value in other projects

    文摘:結合實際工程,討論了在除塵工程中風機、電機等大型動力設備基礎地腳設的問題,分析了一種新型的留孔灌漿方法的可行性,並提出了其在其它工程中的推廣價值。
分享友人