預埋鋼筋 的英文怎麼說

中文拼音 [máigāngjīn]
預埋鋼筋 英文
embedded bar
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. To improve the binding strength between the deck slabs and deck surfacing layer of badong changjiang river highway bridge and to provide the surfacing layer with anti - cracking ductility, a series of technical measures has been taken in the construction of the deck surfacing of the bridge, including those of embedding binding reinforcement in the deck slabs, spraying inorganic binding agent between the slabs and layer, replacing part of the cement with micro expansion agent and adding appropriate amount of polypropylene fibers to the concrete

    摘要巴東長江公路大橋橋面鋪裝,通過採取橋面粘接、噴塗無機界面粘結劑、用微膨脹劑替代部分水泥、在混凝土中摻入適量的聚丙烯纖維等措施來提高橋面板與鋪裝層間的界面粘結強度和給橋面抗裂增韌。
  2. Experimental research on the bearing capacity of the angle steel embedded part

    件承載力試驗研究
  3. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下連續墻設計過程中的網保護層、網接駁、件、墻體錨固深度、墻體接頭形式以及施工過程中網安裝、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  4. Compared with the normal flat - plate floor, the cast - in - place reinforced concrete hollow flat - plate floor has two special characteristics. to produce the hollow floor, the hollow columns are pre - buried in the floor. there are concealed wide - flat beams between the frame columns

    和普通平板無梁樓蓋相比,現澆混凝土空心板無梁樓蓋有兩個突出的不同點,一是在樓板內空心圓筒形成空心樓板,二是在框架柱之間設有暗扁梁。
  5. The precautions for the underwater concrete reinforcing cage up - floating accident is placing the reinforcing cage in the pile hole center, controlling the embedded depth of conduct pile, concrete casting velocity and conduce pipe drawing velocity, mixing fine quality concrete, adding barbed bar and specialized refincing cage hanger hook

    採用對策是注意保證灌注導管位於籠中心,控制導管深、灌注速度及提升導管的速度,配製品質好的混凝土,以及採用「倒剌」方法和專用吊鉤等防措施。
分享友人