預拉鋼索 的英文怎麼說

中文拼音 [gāngsuǒ]
預拉鋼索 英文
prestretched strand
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 拉構詞成分。
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • 鋼索 : steel cable; cable; cable wire; steel rope; wire rope鋼索傳動 rope transmission; steel rope drive...
  1. Suitable calibrated dynamometers were used to control the pull in the prestressing cables.

    用合適的標定過的量測計控制應力力。
  2. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、應力錨的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對錨錨固力及錨最佳錨固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張實驗;對兩組結構型式的十組絞線內應力及總張力的實驗數據進行了研究,提出了提高應力錨錨固性能的措施,以及具體的施工方案和施工工藝。
  3. Our company is specialized in supplying all kinds of terminal block, switch test double block, ground block, fuse block, three - level sensor block with light, double block, universal block, integral block, nylon cable ties, cable ties, releasable cablle ties, self - locking cable tie, marker calbe ties, flexible pipe, cable marker, expansion nail / plug, wire joint, cable clamp, nail clip, screw on wire connector, self - adhesive tie mount, spiral wrapping band, wire connectors, cable tie mounts, nylon fasteners, cable gland, nylon ties, cable terminal, terminals, terminal connector, wiring duct, pre - insulated terminals, cable markers, electrician tools, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, pe tubing and quick screw connector, circle nail cable clips, self - adhesive tie mounts, expand nails, spiral wrapping bands, screw on wire connectors, copper connecting terminals, pre - insulated electrician tools, wire connectors, cable tie mounts, nylon fasteners, nylon ties, cable terminal, pre - insulated terminals, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, cable accessories, wiring accessories etc. we offer superior product and best service with competitive price

    我們公司是專門供應各種終端塊,交換機測試雙重座,地面座,保險絲座,三層傳感器座輕型雙座通用塊,積分塊,尼龍電纜聯系,電纜聯系,松解錨關系自鎖式電纜接頭,光纜標記關系,軟管,電纜標記,膨脹釘/插頭,電線接頭,電纜鉗,夾釘,螺絲電線連接,自粘配合摩,螺旋帶包,導線連接器,線纜配合固定座,尼龍緊固件,電纜壓蓋,尼龍關系,電纜終端,終端,終端連接器,電線導管,終端絕緣,電纜料,電工工具,電纜配件,塑料電纜聯系,配合絲,為配合劇情,串珠配合纏上搭膠包裹,包裹配合工具,電纜,電線,終端連接器,終端塊,釘,尼龍腺體,聚乙烯管材及快速接頭螺絲,圓釘電纜夾,自粘配合固定座,擴大釘,螺旋帶包螺桿導線連接器,銅接線端子,絕緣電工工具,電線接頭,電纜接頭固定座,尼龍鏈,尼龍關系,電纜終端,終端絕緣,電纜配件,塑料電纜聯系,配合絲,為配合劇情,配合串珠包,搭包膠,配合工具包,電纜,電線,終端連接器,終端塊,釘,尼龍腺體電纜,電纜配件,線路配件等,我們提供卓越的產品和最好的服務,具有競爭力的價格
  4. Preassembled parallel wire strands, in contrast to structural strands, do not require prestretching.

    先裝配的平行與結構纜相比,不需要
  5. In order to satisfy the demands of the main pylon measure benchmark stakingout and the cable anchor - pipe positioning for cable - stayed bridge, a new georobot relative datum 3d polar coordinate method is presented

    摘要結合斜塔基準放樣及斜管的精密定位的需要,提出了一種新的基於測量機器人的三維相對基準放樣方法,並成功用於灌河特大橋斜橋主橋的施工放樣。
  6. Secondly, the basic principle on optimal design of structure is presented. based on the characteristics of aqueduct - stayed optimal design, cable optimization, aqueduct body selection optimization and aqueduct body vertical section optimization are included. the prestresses of cable - stayed, the dimension of aqueduct and the number of reinforcing steel bar are chosen as the design variables

    根據斜式渡槽優化設計的特點,本文將槽身優化分為力優化、槽身橫斷面優化以及槽身縱斷面優化三個方面進行優化設計,確定斜應力、槽身斷面尺寸、槽身橫向及縱向應力鉸線配筋數量等槽身設計的主要變量。
  7. Steel strip sheaths for prestressing tendons - test methods - determination of tensile load resistance

    應力帶護套.試驗方法.抗負荷力的測定
  8. The test data of dongping project, which belongs to beijing - zhuhai highway at guangdong province, are given in this thesis. all the data are drawn to diagrams and compare with the theory compute results of winkler method and continue beam method separately

    本文還對東坪工點的應力錨地梁進行了現場試驗,測試了錨外錨力,地梁土壓力以及梁內力,並繪製成相關數據表和相應曲線圖。
  9. Products are : super high pressure electric, pneumatic, manual oil pump ; pre - stress jack for the use of coal mine and construction ; steel bar and cable scissor ; all kinds of bolt for safety supporting and bolting ( km19 and km22 bolt have all got the certificate of “ ma ” in china. ) ; cable anchor and bolt test stand ; hydraulic nut scissor and etc

    產品有防爆式超高壓電動、風動、手動油泵;煤礦、建築用應力張千斤頂;筋、絞線切斷器;安全支護用各種錨具( km19 、 km22錨具在國內率先取得煤安證書) ;錨錨具靜載伸試驗臺;液壓螺母破切器等。
  10. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、塔和橋墩;用可考慮幾何非線性的桁元模擬斜、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張應力筋和張
分享友人