預算加載 的英文怎麼說
中文拼音 [yùsuànjiāzǎi]
預算加載
英文
budget upload-
This paper emphasize study the seepage of vacuum - heaped load combining precompression., deduce the drainage quantity computation formula for stage loading in soft soil. an example show that the results of calculation are in good agreement with the measured value, this explain that the formula is rational
本文重點對真空堆載聯合預壓法的滲流進行了研究,得出了在分級加荷下軟土地基滲流量的計算公式,算例表明其計算值與實測值較吻合,說明所建模型是比較合理的。Based on the terszige and biot theory, initially analyze the economical of this experiment, directly save investment 22 % after compute. after that, computing the settlement of highway foundation, comparing the computing and survey value, the predict formula of vacuum - heaped load combining precompression for designing, this formula show that the distortion law of consolidation progress. at the same time, based on the position and room experiment, analyzes the intension transformation in soft soil and criteria of stabilization control
在太沙基和比奧固結理論的基礎上,先分析了此次試驗的經濟性,經核算直接節約投資22 ,經濟效益十分明顯;隨后對真空堆載聯合預壓法加固軟土路基的沉降量進行了估算,並與實測值作對比分析,得出了真空堆載聯合預壓下的沉降量估算公式,能反映「真空」加固過程的變化規律;同時根據現場和室內試驗,分析了軟土強度的變化,以及給出並驗證了工后沉降控制標準。First, using strip - partitoning method and programming in matlab language, the numerical caculations of the relation curve between moment and curvature are done for the beams strengthened with non - prestressed and pretressed cfrp sheets, base on the assumption of plane section, non - bonding slip and non - peeled destroy. secondly, nolinear finite elemeant analysis by ansys are done for the beams strengthened with prestressed cfrp sheets base on the three assumptions before mentioned, the analysis are all done for the relation curve between load and displacement, the distribution of material stress, the distribution of cracks. lastly, calculation formula of flexural capacity and deflection are proposed
)的全過程關系曲線。其次基於上面的三個假定,選擇合理的本構關系,利用ansys通用有限元分析程序對預應力碳纖維布加固梁進行非線性有限元分析,分析了加固梁的荷載-撓度關系、材料的應力情況、裂縫的分佈情況等。最後提出了承載力計算公式和正常使用狀態下撓度計算公式。Program can analyze the multi - girder curved bridge, by using the diatropic distributing theory. it can calculate the dynamic programming loading, by using the combined influence. it can analyze the internal force under the action with the prestressed force, by using the equivalent load method
程序採用橫向分佈的實用計算理論來處理多主梁曲線梁橋的空間受力分析問題;採用組合影響線來對曲線梁橋進行動態規劃加載;採用等代荷載法對曲線梁在預應力作用下的結構內力進行分析。Measuring engine transient process data in ca1258p1k2l11t1 truck in accelerated mode, recording and analyzing the data, then analysis the test error. 4. building model and simulating two typical running mode ? fixed 6th gear acceleration with initial vehicle speed 40km / h and gear change acceleration starting with 2nd gear, comparing calculated result with test result, revising transient process simulation model and analyzing error between calculation
本文基於ca1258p1k2l11t1載重卡車對ca6df2 - 26發動機的瞬變工況進行試驗和模擬計算,結果表明: 1 ) gt - power軟體可以很好的模擬、分析、預測發動機瞬變過程,模擬計算的結果與試驗結果很接近,試驗證明,預測分析指出的改進方向是正確的; 2 )加裝電動增壓器可以降低整車使用油耗,改善低速煙度排放,縮短加速時間,改善整車的加速響應; 3 ) gt - power軟體預測分析配合發動機和整車試驗是分析、解決發動機瞬變過程的有力工具。Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders
其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。Simultaneity, through contrast analysis validate that antiseimic capacity of expansion web is better than that of steel web. therefore, based on the experiences summed up by precedence, the formulation for calculating the crack load and limit load of brick masonry house reinforced by expansion web is advanced, which provides project reference. based on the analysis and studies of masonry shearing strength, test of prestressed single brick masonry wall, and test of prestressed brick masonry house models, and ect, the article has carried through several aspect research as below : 1. a series of experiment on material capability of expansion web, including intensity of single thread and expansion web, ect ; 2. research on influence of loading and destroy of masonry brick building reinforced by expansion web under lowcyclic loading ; 3. study of impact of expansion web on ductility, energy dissipation, intensity, ect under the same situation as above ; 4. put forward computation formulation of masonry brick building reinforced by expansion web
本著以上的研究目的,本文在分析和借鑒前人砌體抗剪強度理論、預應力單片墻試驗研究、預應力模型抗震性能試驗研究等基礎上,進行了以下幾方面的研究工作: 1 .作為一種新型結構材料擴張網,進行了一系列的材性試驗(單絲強度、網片強度和在砂漿中被約束條件下的網片強度及其相應的彈性模量) ; 2 .研究了水平荷載往復作用(低周交變)下,普通鋼絲網和擴張網砂漿對砌體結構抗裂及承載能力和破壞形態的影響,並將這兩種材料的加固效果進行了對比; 3 .上述狀態下,兩種網片水泥砂漿對砌體結構變形、延性、耗能、剛度退化等抗震性能的影響及其影響效果的比較; 4 .提出擴張網水泥砂漿加固砌體結構的抗剪強度計算建議公式。The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable
本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預應力鋼結構優化設計模型;提出多次預應力鋼結構優化設計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級預應力的大小,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部布索的水平平行弦鋼桁架、整體布索的水平平行弦鋼桁架和局部布索的超靜定鋼桁架等算例進行了優化設計,經濟效益明顯;對水平平行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils
通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated
本文以蓮沱特大橋工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內力的計算,確定了拱肋施工最不利荷載工況下加載重量、壓重順序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。Then the initial stress was calculated with proper load and the assembly process simulation
模擬裝配夾緊過程施加載荷約束,並計算該過程中鋼板彈簧內部產生的預應力。3 ) on the basis of probability statistical theory, dispersibility of resistance change of fatigue life gage be analyzed and the calculating method of the dispersibility is set up
編制了預測多級加載電阻變化的應用程序。 3 )用概率統計分析了其電阻變化的分散特性,給出了分散特徵值的計算方法。The former model of staged loading and staged optimization is improved, in which the value range of pre - stress restrict in restrict equation. it provides the theoretical base for the loading time of multi - pre - stress and the value of pre - stress. and examples analyzed with linear programming and full - constrained methods prove the convergence effect well
論文在單次預應力鋼結構的優化模型的基礎上,建立了多次預應力鋼結構的優化模型,將原有的分級加載,分級優化的模型加以改進,在優化模型中將約束方程中的預拉力約束的取值范圍擴大,使得多次預應力的施加次數、施加預拉力的數值大小的確定有了理論根據,並利用線性規劃和滿約束結合的方法進行求解,通過算例分析,收斂效果較好。Through the theoretical calculation and parameter analysis and compared the result with general composite beam, the results show that the section stress redistributed by the effects of concrete shrinkage and creep and tensile stress by difference temperature will be greatly reduced. the forcing characteristic of this
通過理論計算和有限元參數分析,與常規組合結構進行對比,驗證了預應力波形腹板組合結構具有大大減小徐變引起的應力重分佈及溫差和收縮效應在混凝土板產生的拉應力值、對加載齡期和持荷齡期不敏感的特點,結構受力性能非常優越。Stress and deformation was calculated with the distribution to predict the security of structure where fem is used. with calculating in method of fem, the paper gives some advice on how to design structures of ship launching
將墩木支反力按照上述分佈形式加載到三維有限元模型上進行計算,得出結構的應力響應和變形,然後校核是否滿足要求,對下水船局部結構的安全性進行預報。The example shows that the structural soft clay ground maybe destroys during the preceding loading. finally, strength increase and its utmost are discussed, associated with the analysis of the example, and some useful conclusions are obtained
計算表明,預壓結構性軟土地基在加載填筑前期也很有可能會失穩破壞。This paper analyses multi - stage pre - stressing and different parameters produce the impacts to static and dynamical behavior of the structure by theoretical calculation and experimental research. the conclusion can provide reference to static and seismic design of arch truss string structure. the main issues in the paper are : the multi - stage pre - stressing loading experiment is studied in this paper
本文通過理論計算和試驗研究分析了多次張拉預應力、參數設置對張弦拱桁架結構靜力、動力性能的影響,主要完成了以下幾方面的工作:進行了模擬施工過程中的多次預應力加載試驗。In the light of the deficiency of the routine calculating method in the application of multi - curve style prestress steel bar in the large span structures, an applied program is written to calculate the loss of the prestress. fem is used to calculating the concrete stress of the frame beam under prestress load, in the process of which, many successful improvements have been made in the element division, load application and the treatment of the support restraint
針對常規計算方法在大跨結構中預應力筋多波曲線配置應用中的不足,編制了計算預應力損失的應用程序;用fem計算了框架梁在預應力載荷作用下的混凝土應力,其間在單元劃分、載荷施加及支座約束處理上有成功的改進。An index in which the logical order of the index key values is different than the physical order of the corresponding rows in a table. the index contains row locators that point to the storage location of the table data
1 .多維數據集中的一組操作,用於重新生成多維數據集的結構,將數據加載到多維結構中,計算匯總信息,並保存預先計算的聚合。There are some developments of improvement principle, construction techniques and design theory, but there are more questions to solve such as the depth of improvement, the change of underground water, difference between vacuum preloading and surcharge preloading, effect of vacuum preloading to the environment, computation method, and so on. this status limited the more application and development of these two methods. more and more researchers " attention in the world focuses on these questions
如真空預壓法的加固深度、真空預壓區地下水位的變化情況及真空預壓和堆載預壓加固效果的差別、真空預壓對周圍環境的影響等問題以及缺乏簡便實用的真空預壓設計計算方法等,因此制約了該方法的進一步推廣和應用,已引起國內外學術界和工程界的廣泛關注。分享友人