預裝入程序 的英文怎麼說

中文拼音 [zhuāngchéng]
預裝入程序 英文
preloaded program
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 裝入 : place; load; embed
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工、模板工、混凝土工應力工、移存梁工、孔道壓漿工、梁體封端工、橋面防水層和保護層工等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊鋼筋骨架模;拆式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順和斜向分段、腹板水平分層、附著式振搗為主、插式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. The paper includes the contents as follows : the second chapter introduces the basic theory of bp neural network, chapter 3 puts forward a solution named divide - assemble, chapter 4 introduces the preprocessing of input population, chapter 5 introduces the basic theory of genetic algorithms, chapter 6 discusses gdr - ga algorithms, 7 part introduces the processing of atm band - width distribution dynamically and gives several program modules among them. chapter 8 introduces the interface, running and results about the software system, the last chapter summarizes research work of this dissertation and further researches arc prospected

    本文主要包括以下內容:第2部分闡述bp神經網路基本理論,第3部分介紹了拆分組方法,第4部分主要介紹了bp神經網路輸樣本的處理,第5部分介紹了遺傳演算法的發展及其基本理論,第6章介紹的是最速梯度? ?遺傳演算法,第7部分介紹了atm帶寬動態分配過、子網與總網的學習過和其中的一些關鍵模塊,第8部分介紹的是該系統界面和運行情況,最後一部分總結了論文所做的工作和進一步工作設想。
  3. According to the test conditions, the double polarity inputting mode is adopted in the circuit of voltage - frequency converting part ; storage batteries are used in the optical emission part of optical fibre isolating and transmitting device, that can guarantee isolation between the main circuit and the testing system ; the 89c51 singlechip is used in the singlechip testing - controlling unit, the peripheral circuits are extended, data are transmitted through the serial port in this part ; the p opular software delphi5. 0 is used in the pc part, the communication between singlechip and pc by serial port, plotting of current wave, regulation of data ; the optical - electrical isolating and triggering are used in the controlling part, this can guarantee the veracity and reliability of breakers triggered, this triggering mode is also used in the triggering of the main closing breaker, the tested breaker and the assistant breaker, the triggering signals are sent out by a singlechip

    壓頻轉換部分電路中根據實際情況採用了雙極性輸方式;光纖隔離傳輸置的光發射部分電源採用了蓄電池供電,確保了主迴路與測試迴路的完全隔離;單片機測控部分採用了89c51單片機,擴充了外圍電路,通過串口向pc機傳送數據; pc機與單片機之間的串口通訊、波形繪制、數據管理等都採用了軟體delphi5 . 0編寫。該測試系統中留了輸出口,可以對合成迴路中的主合閘開關、被試開關、輔助開關進行觸發,信號由單片機發出,控制部分採用了光電耦合隔離觸發的方法。軟體設計主要集中在對電流信號的數據採集、數據處理、數據傳送、人機界面、波形繪制和數據管理,軟體部分又可分為單片機和pc機設計兩大部分。
  4. On this screen you can specify which partition the boot loader is installed to most will want the default mbr option ; those who don t will know why and the consequences therein, and force lba32 you shouldn t need to use this option, because newer hard drives and boot loaders have overcome the 1024 cylinder limitation

    在這一屏幕上您可以指定將引導在哪個分區上(大多數人都用設的mbr選項;而不用該選項的人須知道為什麼不用它,以及不使用它會帶來什麼後果) ,並強制使用lba32 (您應該不必使用該選項,因為較新的硬盤驅動器和引導已經克服了1024柱面的限制) 。
  5. Power bond graph is used to established the bond graph model of the lifting and dropping of hydraulic pile hammer and state space equation in the paper for hydraulic pile hammer is perplexing nonlinear system. in order to attain the graph that pressure, position, velocity, acceleration vary with time in the course of driving pile simulation procedure solving state space equation is designed on the basis of combining four - order runge - kutta method with predicator - corrector method, dynamic simulation of the hydraulic system is studied in matlab 6. 5. it is convenient to analyse dynamic characteristics of the hydraulic syste m, beneficial to the design and parameter optimization of the hydraulic system. in the final part of the paper, under detailed analysis of the control characteristics for double - acting hydraulic pile hammer with double cylinders, control system based on the programmable logic controllers founded on technology of modern compute is designed

    由於液壓打樁錘液壓系統是一個復雜的非線性系統,本文採用功率鍵合圖法建立液壓打樁錘上行、下降的鍵合圖模型和狀態空間方,通過四階龍格?庫塔法和估?校正法相結合編制了模擬對狀態空間方求解,在matlab6 . 5中進行液壓系統的動態模擬,獲得液壓打樁錘運動過中壓力、位移、速度、加速度等隨時間變化的曲線圖。此曲線圖方便了對液壓系統動態特性分析,為液壓系統的設計和參數優化提供了有益的借鑒。最後,在深分析雙缸雙作用液壓打樁錘控制系統的功能要求后,採用了以現代計算機技術為基礎的新型工業控制置? plc可編式控制制器,設計出了雙缸雙作用液壓打樁錘的電器控制系統。
  6. Although the rapid development of information technologies and worldwide web, which applies information systems onto the routing management of operation, constitutes one of the effective solutions to the problems mentioned above, the application of completed software set of information systems often lacks a logical process design and the related routing structure analysis, undermining the expected performance of the information systems

    但多數的業者導已設計完成的套資訊系統軟體時,時常缺少合理化的設計與相關流的架構分析,使得資訊系統的功能不如期的表現。
  7. This paper applicates the mathematical programming and presents the model of containership optimization, and develops computer procedure of containership prestowage. it discusses the principle and implementation method of the optimize model, including following : the process of containership stowage ; introducing of the blocks ; a strategic planning process and a tactical planning process of containership prestowage ; computing principle and method of buoyancy, stability and strengh, besides checking principle of them

    本文引數學規劃的方法,建立了集箱船配的優化數學模型,開發了集箱船配計算。文章詳細介紹了該優化模型的原理和實現方法,主要內容包括:集箱船的配載過載單元塊的提出和劃分,集箱船戰略配載和戰術配載,船舶性能計算與校核。
分享友人