預計完成時間 的英文怎麼說
中文拼音 [yùjìwánchéngshíjiān]
預計完成時間
英文
estimated time of completion (etc)- 預 : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 成 : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
- 時 : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
- 間 : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
- 預計 : estimate; calculate in advance; expect
- 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
-
South africa is scheduled to begin construction of a 110 - megawatt demonstration pebble - bed plant in 2007, to be completed by 2011, with commercial modules of about 165 megawatts planned for 2013
南非預計在2007年開始建造一座1億1000萬瓦的示範球床堆反應器核電廠,完成時間是2011年,此外也將在2013年建造約1億6500萬瓦的商用模組。Ths estimated finish time is one month
預計完成時間是一個月後On the basis of analyzing for the status and the defects of the domestic research and considering its characteristics such as heavy difficulty of man - hour rationing of tooling, two levels of man - hour rationing existing in the enterprise and workshops, and especially its great experience - dependence for the enterprise man - hour rationing, this thesis aimed at designing a computer aided system for man - hour rationing of tooling based on the intelligent decision support technology
在分析了國內研究現狀和不足的基礎上,針對工裝工時定額難度大、企業中工時定額工作分為企業和車間兩個不同的級別、特別是企業級工時定額有較強預測性和經驗性的特點,本文提出構建工裝工時定額智能決策支持系統的解決方案。該系統的設計與開發已基本完成,通過在成都飛機工業公司試用,效果良好。The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand
其主要思想與步驟為:首先運用計算機模擬技術來模擬工序作業時間的隨機特性,產生概率最大的施工網路計劃,並對其進行優化和調整,以獲得滿足工期、質量要求的成本及網路計劃;在施工過程中動態跟蹤施工實際成本與進度與目標計劃所發生的偏差以及質量問題,然後根據已出現的偏差,利用計算機模擬技術對項目未實施部分進行進度、成本的預測和分析,根據現有信息對網路計劃未完成部分進行調整和優化,以盡可能把各項費用控制在預定計劃成本之內或使工程的綜合指標最優。The proposal should include the following components : one - paragraph description of the topic ; one paragraph describing how you will analyze the topic using concepts we are discussing in this class ; your research plan, including range and types of sources ; one paragraph on anticipated contribution / findings ; one paragraph on anticipated problems, either practical or conceptual ; and a time - line of target dates for completion of research, rough outline, additional research, and first draft ( first draft is due in class # 13 )
提案應包括以下組成部分:一、用一段篇幅描述主題;二、利用在課堂上討論的概念分析主題,用一段篇幅描述你將如何進行分析;三、你的研究計劃,包括原始資料的范圍和類型;四、用一段篇幅說明預計的成就和發現;五、用一段篇幅勾勒預期將碰到的難題(實際問題和概念性問題) ;六、 (任務)大事預計完成時間表: 1 .研究工作; 2 .粗略的提綱; 3 .附加研究; 4 .初稿(初稿在第十三次課交) 。What arrangement will you make if you have 3 days to do something while you only need 1 day to complete it
如果某件事情預計需要三天的時間,而其實只需要一35選7走勢圖天就能完成,你會如何處理?" the review is expected to be completed by september so that our healthcare system can be better prepared to handle any future outbreak in the shortest possible period
委員會預計在九月完成報告,讓我們的醫療系統可在最短時間內做好充份準備,以應付可能再次出現的疾病爆發。It aims at reducing the number of execution cycles of instructions, and has experienced from the period of single issue architecture to the period of multiple issue architecture. in the past twenty years, risc has become more and more mature abroad. it makes great sense to develop our own risc and it is a effective way to develop our own risc with the instruction set which is compatible with those of risc which has been widely used
80年代初出現的risc技術是計算機體系結構的重大變革,它以減少指令執行的平均周期數為結構設計的主要目標,經歷了從單發射結構到多發射結構的演變過程,解決了深度流水技術、相關技術、轉移預測技術、編譯優化技術等一系列技術難點,在20多年的時間里, risc技術的發展已日趨成熟與完善微處理器在軍事和民用領域都有著廣泛的應用,研製具有我國自主獨立版權的微處理器在當今具有重大意義。On - line monitoring of hvcb is the precondition of predicting maintenance, is the key element of reliable run, and is the important supplement to the traditional off - line preventive maintenance in fact, the faults are made by hvcb, no matter in number or in times, is over 60 % of total faults so it has determinative importance for improving the reliability of power supply and this can greatly decrease the capital waste used by - dating overhaul in this paper, the inspecting way of hvcb mechanism characteristic is discussed the concept of sub - circuit protector is presented, the scheme that we offered has been combined with sub - circuit integrality monitoring theory, to ensure that it has the two functions as a whole according the shut - off times at rated short circuit given by hvcb manufacturer, the electricity longevity loss can be calculated in each operation, and the remained longevity can be forecast too an indirect way for calculating main touch ' s temperature by using breaker shell temperature, air circumference temperature and breaker ' s heat resistance is improved in this paper, and main touch resistance can be calculated if providing the load current msp430, a new single chip microcomputer made by ti company, is engaged to develop the hardware system of the on - line monitoring device, and special problem brought by the lower supply voltage range of this chip is considered fully
高壓斷路器所造成的事故無論是在次數,還是在事故所造成的停電時間上都占據總量60以上。因此,及時了解斷路器的工作狀態對提高供電可靠性有決定性意義;並可以大大減少盲目定期檢修帶來的資金浪費。本文論述了斷路器機械特性參數監測方法;提出了二次迴路保護器的概念,並將跳、合閘線圈完整性監視和二次迴路保護結合起來,給出具有完整性監視功能的二次迴路保護器實現方案;根據斷路器生產廠家提供的斷路器額定短路電流分斷次數,計算每次分閘對應的觸頭電壽命損耗,預測觸頭電壽命;提出根據斷路器殼體溫度和斷路器周圍空氣溫度結合斷路器熱阻來計算斷路器主觸頭穩態溫升的方法,並根據此時的負荷電流間接計算主觸頭迴路的電阻;在硬體電路設計上,採用美國ti公司最新推出的一種功能強大的單片機msp430 ,並充分考慮該晶元的適用電壓范圍給設計帶來的特殊問題;在通信模塊的設計中,解決了不同工作電壓晶元之間的介面問題,並給出了直接聯接的接線方案。Estimated time of completion et
預計完成時間According to the railway development strategy 2000, the likely completion window of the project would be between 2008 and 2012
根據鐵路發展策略2000 ,這個項目的預計完成時間為2008年至2012年之間。Due to the influence of the corrosive agents in the outer environment, the resistance and dynamic reliability of the chemical structures declined with time very fast. and it is difficult for the chemical structures that with the normal design reliability level to fulfil their structural functions. on the condition that the design service life is confirmed, the design reliability level of the chemical structures should include the corrosive environment and its effect on the structures. based on agents ' corrosiveness fuzzy classification, this paper suggests a practical method on design reliability level decision - making of the industrial structures, which is very useful for the anti - corrosion design of the industrial structures
化工結構由於受到外部腐蝕性介質環境的影響,其承載能力及動態可靠度水平隨使用時間衰減過快,按照普通結構設計可靠度水平設計的工業建築常難以順利完成設計使用功能.因此,在設計基準期預先確定條件下,化工結構的設計可靠度水平應綜合考慮腐蝕性環境及其對建築結構的影響特點來決策.根據介質腐蝕性模糊分級,提出了工業建築設計可靠度水平的一種實用決策方法( 5 ) another is the long - term predict utilizing the biggest index number lyapunov in the chaotic time series and the whole space method during the steady period of the road foundation load, after the overload of the road foundation finished. meanwhile, contrasts with some mature settlement predict methods, estimating some important section in the engineering synthetically, making sure an ideal outcome of the predict warp, then unload the overload of road foundation and make it satisfy the design request
( 5 )路基超載完成後,在路基荷載穩定期間內,利用混沌時間序列中的最大lyapunov指數和全域法進行長期預測,同時與一些比較成熟的變形預測方法進行對比,對工程中一些重點斷面進行綜合評判,確定一個較理想的預測結果,從而對路基超載進行卸載,使其滿足工程設計要求。However, with a reduction in the forecast employment in the central reclamation due to changes in land use assumptions since the second railway development study, and the anticipated opening of shatin to central link ahead of the nil, which would share some of the cross - harbour trips and relieve the nathan road section of twl, it has been decided in early 2003 that the completion of nil would be deferred to beyond 2016
不過,自第二次鐵路發展研究以來,土地用途的假設已有所改變,導致中區填海區的預計就業人口減少。此外,沙田至中環線預計會較北港島線為早通車,之後可分流部分過海乘客,從而紓緩荃灣線彌敦道段的擠塞情況。政府在2003年初決定將北港島線的完成時間押后至2016年以後。There has been a great deal of interest in leasing space in icc since the ground breaking last september, with some large corporations enquiring about leasing entire floors or more. potential tenants are impressed by the ultra - modern design and extensive facilities in icc, and shkp is satisfied with the favourable response and hopes to finalize some deals soon
環貿廣場自去年九月首度曝光后,已接獲不少預租查詢,更有多間跨國公司主動洽詢租一層以上的樓面,同時對大廈的頂尖設計及完善配套設施深表贊賞,新地對市場反應感滿意,希望稍後可以落實租務成交。The estimated time for completing the night - time staffing improvement programme for labour wards, the staffing levels assessed to be adequate under the programme, as well as how the day - time staffing for such wards will be arranged
(三)預計何時完成待產病房夜間當值人手的改善計劃;按照該計劃的評估,哪個水平的人手才算足夠,以及怎樣安排有關病房日間當值的人手?分享友人