預計應力 的英文怎麼說

中文拼音 [yīng]
預計應力 英文
intended stress
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 預計 : estimate; calculate in advance; expect
  1. Design specification for hydraulic prestressed anchorage

    水工錨固設規范
  2. The diffusion welding behavior of single - crystalline cu to single - crystalline - aio with a nb film interlayer and the joint microstructure properties were studied by tem, sem / eds analyses and four - point bend testing. the nb film interlayer deposited by electron beam evaporation on the ceramic side prior to diffusion welding was found to be olycrytalline and fiber - textured after diffusion bonding, with the close - packed plane ( 110 ) being parallel to the ( 0001 ) basal plane of - aio

    擴散連接技術是一門邊緣科學,涉及材料、擴散、相變、界面反、接頭變等各種行為,工藝參數多,雖然已經進行了大量的試驗研究,但卻對各種材料的連接機理尚未有明確的認識,為此人們試圖藉助于算技術,對接頭行為進行數值模擬,以便找到共同規律,對擴散連接過程及質量進行測與實時控制。
  3. Suitable calibrated dynamometers were used to control the pull in the prestressing cables.

    用合適的標定過的量測控制鋼索的拉
  4. Considering to the continuous rigid - frame bridge construction characteristic, putting forward the idea of reverse to optimize prestressed steel. according to different construction phases, the paper gets the formual of the cantalever phase, join two section of a bridge phase and the vertical prestressed steel, and works out corresponding program

    考慮大跨徑混凝土連續(剛構)橋施工的特點,提出了基於倒裝方法的靜定束、合龍束以及豎向束的優化設理論,並編制了相算程序。
  5. With two examples of the prestressed celom tension in the continuous girder design, which is utilized in the projects of mingzhu elevated railway and xinmin elevated railway, the author analyses the characters of the design and the application of this technology

    摘要就軌道交通明珠線、莘閔線等工程的連續梁設束體內張拉的實例,分析其設特點和用。
  6. The two specimens, which are designed as : main beam - pre - stress beam ? floor ? frame columniation assemble the space specimens. in order to checkout whether the code can be applied for the special structure systems, the structure of the specimens refer to the current gb50010 - 2002 concrete structure design code and gb50011 - 2001 seismic resistant code

    本文試件的各組成構件為:非邊梁梁板框架柱組合空間試件,各組成構件的構造參照了現行《 gb50010 - 2002混凝土結構設規范》及《 gb50011 - 2001抗震規范》的有關規定,以檢驗規范及設條例能否適用於該特殊結構形式。
  7. Finally, considering the request of the gfrp bars reinforced furan resin concrete electrobath, we designed the structure of the electrobath and use finite element method to analyse it. in the process, pre - stress also was considered. the result of use in practice indicate the properties of gfrp bars can meet the request of electrobath structure

    最後結合玻璃鋼筋呋喃樹脂混凝土電解槽的設與開發,對電解槽的配筋布置、結構尺寸進行了設,用有限元方法對電解槽的整體結構進行了算分析,並考慮了玻璃鋼筋的影響,其設算結果已在玻璃鋼筋呋喃樹脂混凝土電解槽的實際生產中得到了用,且使用情況良好。
  8. Stability calculation methods for grillage supporting structure with prestressed anchor and its application

    框架錨桿邊坡支護結構穩定性算方法及其
  9. Calculation for equivalent loads of prestress in hexahedron element

    六面體單元下等代荷載
  10. An interfacial pullout model for hooked fiber in cementitious materials

    混凝土壓管道設方法
  11. Product introduction : " beifang neoplan " luxury coach series is designed and manufactured after introducing the whole set of technologies, key equipments and fixtures of the neoplan company of germany. with 12meters long prestressed envelope body, with monocoque and space frame, rear - mounted water - cooled engine, air spring suspension, elevating coach body, separate suspension fore axle, 2f power - assisted steering system, 11m3 luggage compartment, external swinging automatic door, warm and cool air conditioner, large complete rubber - laminated windshield, abs system

    產品簡介: 「北方-尼奧普蘭」系列豪華客車是我廠引進德國尼奧普蘭公司全部技術關鍵設備,夾具設製造的具有世界先進水平的系列豪華客車,具有12米長蒙皮車身,無大樑全承載式車架,後置水冷發動機,空氣彈簧懸掛可升降式車身,獨立懸掛前橋, 2f助轉向系統, 11立方米行李倉,外擺式自動車門,冷暖氣空調,大型全幅夾膠前風擋玻璃, abs系統。
  12. Calculation and research of normal section strength of prestressed concrete skew hollow slab

    混凝土斜交空心板正截面強度算研究
  13. This paper takes the example of two huge palaestra, particular introduced the whole process for the designing of pretensioned space lattice structure, from the selection of the plan, thinking of the design, the scheme for the dispose of tendon, the selection of reasonable tendon pull, structure calculate, to the last the analyse of calculate result, the analyse of structural dynamical capability, and the economy compare of several plans, particular analyzed the advantages and disadvantages of this kind of structure. this kind of structure has wide application foreground in engineering

    本文通過兩個大型體育場館的工程實例,詳細介紹了拉索空間網格結構設的全過程,從方案的選取,設思路,布索方案,合理索拉的選取,結構算,到最終算結果的分析,結構動性能的分析,以及幾種方案的經濟比較,詳細分析了該結構形式的優缺點。該結構形式在工程界具有廣闊的用前景。
  14. These can make up the shortcoming of slrcp ; 2 3. to study the steel stress development of penstock, ring - form slsfsrcp and horse - shoe slsfsrcp during curing period are monitored. the pre - tension stress due to expansion of self - stressing concrete can be used in design ; 4

    對圓形和馬蹄形管道進行了28天養護期內監測,研究了鋼襯鋼筋鋼纖維自混凝土壓管道的自成長過程,明確了鋼筋的數值,為此類改性管道設直接提供依據; 4
  15. Not only t he self - weigh of every beam, the prestressing, the compression on the support of form scaffolding, constriction of concrete, creeping are considered when the inter nal force is calculated, but also the result of displacement and deviation of th esupport and precamber should be taken into consideration

    施工階段的內算不僅考慮逐段施工梁的自重,,模板支架的支點壓,以及混凝土的收縮、徐變;同時還考慮施工程序,施工中的支座位移、支座偏差和拱度等的影響。
  16. The security and dependability of the extra long bridge structure have become the general concern question of the society in these days. because of the influence of the prestressed loss, the real stress does n ' t coincide with the designed stress, that is to say, the calculated stress does n ' t display the condition of the real structure stress properly, and thereby the undiscovered danger leads to the quality of the engineering construction

    特大型橋梁的結構安全可靠性已成為當今社會普遍關注的問題。對大跨度混凝土橋梁而言,由於損失的影響,結構的實際與設很難完全吻合,即不能很好地反映結構的實際狀態,從而留下安全隱患,嚴重影響了工程建設質量。
  17. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設與施工兩個方面,對筋的選用、布置,錨固區的設及構造處理,裂縫問題,側向約束對梁軸向及柱中第三彎矩的影響,頂層大跨邊柱設等幾個問題進行系統的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和防措施,對此類工程設和施工有一定的參考價值。
  18. Secondly, the producing mechanism of crack in reinforced structure and factors which affect crack have been discussed, in the emphasis, the method is expounded, which applies first releasing then resisting, combination of releasing and resisting. in the method, flexible slit is applied firstly, which can make deformation of structure distributed, and decrease deformation energy, then the tiny expansion concrete and prestressed concrete with unbonded tendons are applied. and in the different phase, the compressive prestress is put on the concrete structure

    其次,分析並論述了鋼筋混凝土結構裂縫產生的機理和影響因素,著重闡述了「利用先放后抗,抗放結合,綜合控制」的方法:即首先利用后澆帶,使混凝土結構分段變形,減小超長變形的影響;並採用微膨脹混凝土技術及無粘結混凝土技術,分階段對混凝土結構施加一定的,從而減小或完全抵消混凝土結構因混凝土硬化收縮引起的拉;再結合一些其他措施,成功實現鋼筋混凝土結構的超長無縫設與施工。
  19. In the paper it is discovered that it is necessary to design the suitable cable structure for the exertion of the effect of electric pre - stress in the process of warm water cross - linking of silane - g - pe

    本文通過實驗研究發現:要使發揮這種效,需對電纜結構進行合理設
  20. Ergonomics of the thermal environment - analytical determination and interpretation of heat stress using calculation of the predicted heat strain iso 7933 : 2004 ; german version en iso 7933 : 2004

    熱環境的人類工效學.通過對熱的分析
分享友人