風洪損害 的英文怎麼說
中文拼音 [fēnghóngsǔnhài]
風洪損害
英文
wind and flood damage-
The main process of regional ecological risk assessment includes 5 stages : regional analysis, risk receptor selection, risk sources analysis, exposure and hazard analysis, and integrated risk assessment. arming at flood, drought, storm tide, petroleum pollution accident and flow breaking in the lower huanghe river, the probability and distribution of each kind of risk sources are evaluated. the authors bring forward indexes and formulas to measure hazarded degree and risk value of ecosystem. by using remote sensing data, historic record, survey data and by means of geographical information system, regional ecological risk assessment is finished. on the basis of assessment result, the environmental risk management countermeasure of the huanghe river delta is advanced
以黃河三角洲為例進行了區域生態風險評價理論和方法的探討。針對黃河三角洲主要生態風險源洪澇乾旱風暴潮災害油田污染事故以及黃河斷流的概率進行了分級評價並提出度量生態損失與生態風險的指標和公式,分析了風險源的危害作用運用遙感資料歷史記錄調查數據和地理信息系統gis技術,完成了區域生態風險綜合評價在此基礎上提出黃河三角洲的區域生態風險管理對策。( 3 ) the idea suggested in this paper of converting flood into utilizable resource 、 attempering flood by engineering means and supervising human behaviors in the flooded area. to overcome the various barriers arising from ideology 、 systems 、 technology and economy which the establishment of risk management system of flood will be confronted with, this paper also suggests a statistical approach to estimate extremum and the concept of gray - uncertainty risk in figuring flood risk and analyses the severe harmfulness of accidents of extremum risk, furthermore, supplements and perfects present quantity - analyzing method of risk loss
3 、本文提出洪水資源化的觀念,以工程手段對洪水進行調節,以法律、行政、經濟、教育等綜合性的手段對人類在洪泛區中的行為進行管理,是削弱洪水的危害性、減輕洪水風險的有效方式,提高的防洪安全保障需求,實行洪水風險管理是必由之路。洪水風險管理體制的建立必然面臨觀念方面、體制方面、技術方面與經濟方面的重重障礙,並提出洪災風險評價的極值統計學方法和灰色-隨機風險率的概念,建立了其表達形式與計算方法,它完善了現有的風險損失量化方法。In the main meteorological calamities, losses due to floods are the largest, and then followed by the losses that hailstorms and droughts caused
自然風險中的主要氣象災害風險,洪水造成的損失最大,然後依次是風雹災和旱災。The results showed that : the integrated ecological risk was presented symmetrically along brahmaputra, and was mitigated from valley farming area to mountain pastoral area ; the hazards of main risk sources to risk suffer in each sub - region was differently, drought was the common risk source and imperils farming and stock raising severely ; aimed at enhancing the ability of fighting drought, controlling flood and stabilizing sand engineering measures should be taken steps to prevent those hazards ; mountain hazards must be controlled in resident area and along arterial traffic ; manual work should be done to void hail in those area where hails attacked heavily ; there is need to promulgated risk knowledge to herdsmen for strengthening their risk consciousness and improve the ability of preventing risk and self - help after hazards happened in the pasturing area
扎囊縣綜合生態風險沿雅魯藏布江呈現對稱型分佈,並由河谷農業區向高山牧業區逐漸降低;各亞區的主要風險源對風險受體的危害強度差異較大,乾旱是共同的風險源,造成的農牧業生產損失最為嚴重;抗風險措施主要有在河谷地帶採取工程措施以提高抗旱、防洪和固沙能力,在半山臺地加強治理居民點及交通沿線的山地災害,在多雹區進行人工消雹;在高寒牧區向牧民傳播風險知識,以加強其風險意識,提高規避風險和災后自救能力。The whole system is a computer system for flood disaster mitigation decision and flood risk management which includes basic information management, flood risk calculation caused by dike broken, flood risk map making, flood risk information
系統是一個包括基礎信息管理、堤防潰決洪水風險計算、堤防潰決洪水風險圖、堤防潰決洪水風險查詢、堤防潰決洪水災害損失評估、區域防洪減災對策等模塊的為防洪減災輔助決策和洪災風險管理服務的計算機系統。分享友人