首錨 的英文怎麼說

中文拼音 [shǒumáo]
首錨 英文
anchor bower
  • : Ⅰ名詞1 (頭) head 2 (首領) leader; head; chief 3 (表示方位) aspect 4 (姓氏) a surname Ⅱ動...
  • : 名詞(鐵制的停船設備) anchor
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    先,在前人研究成果的基礎上,對桿與圍巖的相互作用機理進行研究,利用全長桿的中性點理論,從等效均化的角度來考慮桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對桿支護結構的應力場、位移場的變化規律進行了研究,分析了加支護對隧洞圍巖應力、變形的影響。
  2. 3. the magnitudes of anchor chain tension caused by heave and pitch is small. so is the effect on dragging anchor. 4. the depth of water, which anchored ship requires, is to large extent affected by heave and pitch

    水深對橫蕩和搖運動影響較大,水深增加,橫蕩和搖運動幅度增大,因此,對鏈沖擊力增大,即對走的影響較大。
  3. They were, says mr stephen, and the end was that the men of the island, seeing no help was toward as the ungrate women were all of one mind, made a wherry raft, loaded themselves and their bundles of chattels on shipboard, set all masts erect, manned the yards, sprang their luff, heaved to, spread three sheets in the wind, put her head between wind and water, weighed anchor, ported her helm, ran up the jolly roger, gave three times three, let the bullgine run, pushed off in their bumboat and put to sea to recover the main of america

    「此語不差」 ,斯蒂芬先生曰, 「其結果,本島男子發現負情女子異口同聲,無可救藥。遂建造舟筏,攜家財登船,桅桿盡皆豎起,舉行登舷禮,轉船向風,頂風停泊,揚起三面帆,在風與水之間挺起船,起,轉舵向左,海盜旗迎風飄揚,三呼萬歲,每次三遍,開動艙底污水泵,離開兜售雜物之小舟,駛至海面上,航往美洲大陸。 」
  4. He started by installing mooring buoy s so that boat anchors wouldn ' t destroy the coral

    先設置系泊浮筒,以避免船毀了珊瑚。
  5. 3. a space bond slip relation of reinforcements in either end of a member is proposed, based on one - dimensional bond slip model of reinforcements proposed by teng zhiniirmg from tsinghua university, the first - time loaded ascending stage ? curve of which model is modified as the line which parameters are not changed so as to simply the computation. the bond, slip is regarded as the boundary nonlinearity of a member

    3 、採用清華大學滕智明建議的一維鋼筋粘結滑移恢復力模型,但從簡化計算的角度出發,將次加載的上升段曲線改為直線,並假定構件端部的諸多縱向鋼筋的滑移服從平截面假定,考慮由節點固區粘結滑移引起的構件端截面軸向和兩轉角附加變形。
  6. Based on the conceptual considerations and structural design of pingsheng bridge in foshan, the first single tower and single span hybrid girder self - anchored suspension bridge in the world, the original technical achievements of the bridge, such as those of the integral bridge tower and separated stiffening girders, the stiffening hybrid girders, structural types of steel - concrete girder joint parts, steel box girder incremental launching and hanger adjustment, are presented and the key and innovative techniques for the self - anchored suspension bridge are described in a summarized account as well

    摘要通過世界上座獨塔單跨混合梁自式懸索橋佛山平勝大橋的方案構思及結構設計,介紹了其採用的整體橋塔分離式加勁梁橋型結構、混合加勁梁、鋼混凝土結合段構造型式、鋼箱梁頂推技術、吊索調索技術等原創性工程技術成果,綜述了自式懸索橋設計的關鍵和創新技術。
  7. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  8. Anchors the match string to the beginning of a line

    將匹配字元串定到行
  9. He would have crushed the first buffaloes, no doubt, with the cow - catcher ; but the locomotive, however powerful, would soon have been checked, the train would inevitably have been thrown off the track, and would then have been helpless

    他如果沖過去的話,毫無疑問那幾頭當其中的野牛一定會被機車排障器壓碎,但是,不管機車多麼有力,它也會很快地被迫停車,少不了還會出軌,結果那就要真的拋了。
  10. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北碇距長江幹流僅250m ,與長江水力聯系密切,碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內次採用矩形地下連續墻結構,並獲得成功。
  11. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿桿作用力學機理進行了深入研究,為全長粘結式砂漿桿的有限元模擬分析奠定了基礎;其次,針對傳統桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿桿有限單元模型;然後,運用上述復合砂漿桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩定性分析的有限元程序,並就全長粘結式砂漿桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿桿支護的理論與方法。
  12. Works are accomplished as follows in this paper : firstly, according to the real condition of the fourth pier, through analysis of several generally - used anti - slipping schemes, new method has been put forward to substitute anchored column pile with the foundation of drilled shafts so as to prevent cofferdam from slipping

    為此本文主要做了以下工作:先根據4 #墩基礎的具體條件,通過對現有常用的幾種抗滑方案的綜合比較分析,提出了以工程本身的鉆孔樁基礎代替固柱樁防止鋼圍堰滑移的方案。
  13. Firstly, the domestic researches, which have been reported, are introduced. then the characteristic of the system in estimation of prestressing losses is analyzed by theoretical method, and the reasons that the elimination of tendon is large and test results are not consistent are pointed. using fem software ansys, anchorage zone of pylon are analyzed

    論文先介紹了國內現階段對該問題的一些研究成果,然後從理論上分析了小半徑大噸位環向預應力體系在計算預應力損失方面的特點和造成張拉伸長量偏大且實測的數據離散性較大的原因,並採用國際權威的有限元分析軟體? ? ansys從理論上進行分析和索塔固區最不利節段的足尺寸模型試驗進行校驗。
  14. At first, the mechanical model of joint is discussed, and the constitutive relation of the rough joint, especially the bolt - supported joint, is given. then bedding slide of bedding stratified rock slope is studied adopting limit equilibrium method, and a formula of stability is brought forward. at last, the bedding stratified rock slope ' s buckling deformation and failure mechanism and its evaluating method of stability is investigated, a corresponding mechanics model is established, then detail research to this failure mode is made in theory combining the energy law and elastic stability theory of plate and beam, and an analytical solution of the yielding curve is educed from this model

    文中先對結構面的力學模型進行了一定的探討,提出了粗糙結構面尤其是加結構面的本構關系;然後採用極限平衡法,研究了順向層狀巖質邊坡的順層滑動失穩,提出了其穩定性計算公式;最後,結合能量定律和彈性板梁穩定理論,探討了工程中常見的順向層狀巖體邊坡潰屈失穩時的破壞機理、變形規律和穩定性定量評價方法,建立了相應的力學模型,求出了其相應的解析解,並提出了臨界坡長與最大彎曲位置的確定方法。
  15. In the stability graphical method, the basic property of rock mass is understood by engineering geology survey, the stability is analyzed at first, then the supporting parameters are determined, and the anchoring force is checked according to the type of cable - anchor

    穩定性圖解法通過巖體工程地質調查來掌握巖體的基本特性,先對采場進行穩定性分析,在此基礎上確定其支護參數,並針對具體索型號驗算固力。
  16. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力閘墩索永存張拉噸位,先採用方案優選的方法確定主次索永存張拉噸位組合,但優選結果拉系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉系數。
  17. ( 3 ) rock bolts are used as an extension of the supporting piles. this structure solves the embedding problem of cantilever pile and is newly applied in foundation trench in china. no environment contamination appears in this old crowed town because no detonation or mechanical drilling

    ( 3 )利用巖石桿作為圍護樁的延伸成功地處理懸臂樁嵌固的問題,該結構方式的應用為國內例,避免了在舊城鎮老房屋密集區基巖爆破和機械成孔對周圍環境的影響和污染。
  18. Application of bolting support for large section open - off cut in sihe mine

    大斷面切眼全支護技術在寺河礦的次應用
  19. At first, the author has analyzed the destroy style and mechanism of blasting, studied various factors which influence on the effect and supporting design of rock anchor beam of underground hydroelectric power station

    先分析爆破機理的基礎上,探討並確定了影響地下廠房巖梁爆破開挖成型質量和穩定性的各種因素。
  20. To tackle this difficult problem, the topic focused crawling technology came into being and occupies a position with its high degree of specialization and objectives in search engine research and development of the next generation search engines. in addition to construct professional search engine, it can be used in a client - based real - time information retrieval system, and has become a new research hot in network information retrieval field

    先,在考慮了噪音的情況下,我們擴充文本的提取范圍,形成「鏈接背景信息」定義;接著編寫了自動提取演算法;然後,在爬行程序運行之前,就大量收集起始頁面地址的鏈接背景信息,並利用這些信息指導爬行程序的工作。
分享友人