驗收表 的英文怎麼說

中文拼音 [yànshōubiǎo]
驗收表 英文
receiving and inspection report r & i report
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  1. The machine have been checked and accepted, and after working for a long time it is proved to have the characteristics of celerity, accuracy, convenience and safety

    該儀器已被通過,運行明,具有快速準確,使用方便,安全可靠等特點。
  2. When an organization representative receive the loan, it should be inspected instantly. a confirmative signature for good - conditioned loan is required. the same applies after inspection by our library staff upon return

    機構代領取借用物品時,務必即時檢查物品備完好,並簽署作實歸還時,亦應待本處職員妥當后,方可離開。
  3. Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines

    安裝的預制混凝土污水管道的面滲入和滲出的的標準實施規程
  4. Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines metric

    安裝的預制混凝土污水管道的面滲入和滲出的的標準實施規程
  5. During the hunt, he comes across a foxy lady, jj shu qi, who happens be a thief with a hidden agenda

    Owen帶走電版示找專家,貴仁卻突然醉酒昏倒,醒來更被警衛鎖上手銬,指他擅闖領事館。
  6. Standard practice for steel castings, surface acceptance standards, visual examination

    鋼鑄件外觀檢標準的標準操作規程
  7. Standard practice for investment castings, surface acceptance standards, visual examination

    熔模鑄件標準外觀檢的標準實施規程
  8. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼筋施工、模板施工、混凝土面層的施工工藝與質量控制,明小型機械法施工能滿足工程需要,工程完成後符合標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  9. 4 on successful completion of the acceptance test of the contract equipment, the acceptance of the contract equipment shall be granted in the form of equipment acceptance certificate signed by representatives of concerning parties

    合同設備測試成功,有關方面代即應簽署設備證書以示對合同設備的接受。
  10. Test procedure and acceptance criteria for prime painted steel surfaces for steel doors and frames

    鋼門和門框塗底漆的鋼材面的試程序和標準
  11. Aerospace series - metallic materials - manufacturing schedule, inspection schedule, inspection and test report - definition, general principles, preparation and approval

    航空航天系列.金屬材料.生產進度進度和試報告.定義一般原理制備和
  12. Simple genetic algorithm gets local minimization too easily and converges slowly. to solve these problems, adaptive crossover rate that has reverse hyperbolic rel ation with the numbers of iteration is designed, and adaptive mutation rate that has reverse proportion to the distances of parents and reverse exponential relat ion to the numbers of iteration is put forward. the practical simulation results show that the adaptive ga has greater convergence speed and larger probability o f getting the best solution

    簡單遺傳演算法存在著斂速度慢、易陷入局部極小等缺陷.針對這些缺陷,本文設計出隨相對遺傳代數呈雙曲線下降的自適應交換率,並提出與父串間的相對歐氏距離成反比、隨相對遺傳代數指數下降的自適應變異率.實例明,具有自適應交換率和變異率的遺傳演算法在斂速度和獲得全局最優解的概率兩個方面都有很大的提高
  13. Acceptance inspection of class 2 alternating - current watthour meters

    2級交流電度
  14. Analysis and simulation results show that the new algorithm provides faster convergence at early stages of iteration and ensures less final misadjustment compared with the cma

    理論分析和模擬實明該演算法與恆模演算法相比,在斂過程中加快了斂速度,數后又能減小對均衡器參數的誤調,具有更小的穩態剩餘誤差。
  15. Test procedure and acceptance criteria for factory - applied finish painted steel surfaces for steel doors and frames

    工廠用鋼門和門框的鋼面飾面漆的試程序和標準
  16. 27 do all lots have lot acceptance dates identified by the year, month, and date the lot was accepted

    所有批次是否都有批次接日期,明批次的年、月、日?
  17. Acceptance inspection for direct connected alternating current static watt - hour meters for active energy classes 1 and 2

    1和2級直接接入靜止式交流有功電度
  18. The specification of erection and acceptance of electric power construction part 5 : section of instrumentation and control

    電力建設施工及技術規范.第5部分:熱工儀及控制裝置
  19. The sampling check method used in electric energy meter purchaseas a technical requirement is detailed in mathematics reasoning way. by this means, the numbers for acceptance and rejection are determined. this paper will be helpful for the check to understand the sampling method

    對電能訂貨技術條件中的抽樣方案進行了數學理論分析計算,證明了抽樣方案中樣本數和拒數的合理性, ,有助於從事電能工作人員對抽樣方案的理解。
  20. Machine tools ; vertical surface type broaching machines ; acceptance conditions

    機床.立式面型拉床.條件
分享友人