驗收質量標準 的英文怎麼說

中文拼音 [yànshōuzhíliángbiāozhǔn]
驗收質量標準 英文
acceptable quality level
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  • 質量 : 1 [物理學] mass 2 (產品或工作的優劣程度) quality 3 economy (離子源的); 質量標準 quality level...
  • 標準 : (衡量事物的準則; 榜樣; 規范) standard; criterion; benchmark; pip; rule; ètalon (衡器); merits
  1. Produce sells the produce that the enterprise sells to its, ought to build examination of perfect replenish onr ' s stock to check and accept a system ; via checking what do not accord with standard of produce quality safety, do not get a sale

    農產品銷售企業對其銷售的農產品,應當建立健全進貨檢查制度;經查不符合農產品安全的,不得銷售。
  2. Quality assurance acceptance standard

    保證
  3. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施工工藝與控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測、場區基層碾壓、二灰層施工、鋼筋施工、模板施工、混凝土面層的施工工藝與控制,表明小型機械法施工能滿足工程需要,工程完成後符合,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  4. Standard for constructional quality acceptance of railway bridge and culvert engineering

    鐵路橋涵工程施工
  5. Standard for constructional quality acceptance of railway electric power engineering

    鐵路電力工程施工
  6. All the products have been issued the ccc certificate, china fire suppression products quality certificate, safe certificate by china electric equipment guangzhou electric safe checking station, cta quality certificate, international ce certificate etc. all the products are manufactured strictly according to the international iec standard and the state gb standard

    公司在生產管理上不斷吸國內外先進經,產品已通過gb t19001 : 2000 - iso9001 : 2000體系認證中國國家強制性產品認證3c中國消防產品認證中國電氣設備檢測所廣州電氣安全檢測站安全認證ce認證。
  7. According to the request of the standard in electric industry in china named " on line check and test rules of analog and digital control system of power station ", every system is tested, and according to technological guides and operation rules, static and dynamic trial are required to be done, the quality of adjust, and response time also adapt to the requirement

    機組整套試運以後,各控制系統逐步投入。依據中華人民共和國電力行業《火力發電廠模擬、開關控制系統在線測試規程》的要求進行測試,並按照技術指及運行導則要求均做過靜態、動態特性試,調節品、響應時間均符合要求。
  8. The inspection and acceptance of construction projects upon completion shall be carried out according to the blueprints and written instructions, and to the work testing norms and quality inspection standards issued by the state

    建設工程的竣工,應以施工圖紙及說明書、國家頒發的施工規范和為依據。
  9. Upon completion of the construction project, the developer shall conduct acceptance inspection according to the construction drawings and specifications, and in accordance with the rules of construction inspection and quality inspection standard prescribed by the state

    第二百七十九條建設工程竣工后,發包人應當根據施工圖紙及說明書、國家頒發的施工規范和及時進行
  10. The main products became a shortlist of national pipeline bureau in 2000 ; passed through iso9001 - 2000 international standard quality system certification in 2001 ; ranked as recommended products by china petrol - chemical group and successively obtained physical market entrance permissions awarded by major oil fields within nationwide in 2002 ; audited to be a membership of china petroleum distribution corp. ( energy ahead ) in 2003 ; gained pressure conduit component manufacture license ( for products such as insulation joint, fast - opening blind, receiver & launcher, etc. ) awarded by the general administration of quality supervision, inspection and quarantine of the prc in 2004 ; and obtained pressure vessel manufacture license in 2005

    公司主要產品於2000年成為國家管道局入圍產品; 2001年通過了iso9001 - 2000國際體系認證; 2002年被中國石油化工集團列為推薦產品,並先後獲得國內各大油田的物市場入證; 2003年經審核成為中國石油銷售總公司(能源一號網)會員單位; 2004年遼寧省首家獲得(絕緣接頭、快開盲板、發球筒有關產品)中華人民共和國監督檢檢疫總局頒發的壓力管道元件生產製造許可證; 2005年取得了壓力容器生產製造許可證。
  11. Unified standard for constructional quality

    建築工程施工統一
  12. Acceptable quality level

    驗收質量標準
  13. Standard and methods of the quality acceptance on the basis of the code of construction project management by enterprises of construction industry ( gb / t 50326 - 2001 ) and unified standard for constructional quality acceptance of building engineering ( gb / 50326 - 2001 ). ( 2 ) to learn the development of project management information system now and project management information system now and the general principle to develop project management information system, to analyze the object, the make the technique words, the nature, the nature, the functions and the limitation clear. ( 3 ) to establish the database of the system with microsoft access97, which includes information table to keep the system in safe condition anal other tables

    論文的主要內容和成果有: ( 1 )依據《建設工程項目管理規范》 ( gb t50326 - 2000 )和《建築工程施工統一》 ( gb50300 - 2001 ) ,本著施工資料管理計算計劃的目的,對建築工程施工的程序、、方法進行了研究分解; ( 2 )研究了建設項目信息管理系統( pmis )發展的現狀和開發的一般原則,對工程資料管理系統的對象、目、方法進行了研究分析,確定系統的技術用語、性、功能、性能、限制和約束以及系統的運行環境等。
  14. Code for construction quality acceptance of cbuilding decoration

    建築裝飾裝修工程統一
  15. Ii. product quality and technical standard are confirmed according to the international sector standard. after supplying in batch, the second party should guarantee produce quality consistency and stability

    二產品及技術按國際行業進行。批供貨后,乙方應保證產品一致性、穩定性。
  16. Article 61 construction projects having been completed and accepted through examination shall meet the stipulated quality standards on construction projects, have complete technical and economic data of projects and warranties issued by builders, and satisfy other requirements set out by the state for the completion of construction projects

    第六十一條交付竣工的建築工程,必須符合規定的建築工程,有完整的工程技術經濟資料和經簽署的工程保修書,並具備國家規定的其他竣工條件。
  17. Abstract : the method of using formaldehyde buffer solution a b sorption - hydrochloric pararosaniline spectrophotometry to determine sulfur diox ide in air has higher sensitivity and good selectivity, and prevents from adoptin g mercurial absorbent. but the conditions in lab are not well controlled, the v alue of reagent blank and standard curvilinear slope can ' t accord with the one s tipulated in “ methods for air and waste gas monitoring and analysis ”. some opra tional techniques for so2 determination in lab are introduced for reference

    文摘:以甲醛緩沖溶液吸-鹽酸副玫瑰苯胺分光光度法測定空氣中的二氧化硫,方法靈敏度高,選擇性好,避免了使用含汞的吸液,但如果實條件控制不好,試劑空白值及曲線的斜率就會不符合《空氣和廢氣監測分析方法》中規定的值,本文著重從操作技巧方面對二氣化硫測定的實控制進行分析,僅供參考。
  18. Our company is engaged in researching, designing, manufacturing all kinds of grabs, the series " yueqi " brand grab products that are produced by our co. ap - ply tothe national technical requirements and qual - ity standard

    我公司專業從事研究、設計、製造各種品種抓具,本公司研製生產的「躍起」牌系列抓鬥產品經主管部門檢測,符合國家認可的技術要求和
  19. Combined with the requirement to realize auto - management in constructional quality acceptance data in based on the latest unified standard for constructional quality acceptance of building engineering ( gb 50300 - 2001 ) and following the general principle to develop project management information system, the thesis studies and develops the constructional quality acceptance data management system, almost realizing the aim of managing the quality acceptance date with computer the maim contents and results of this paper are as follows : ( 1 ) to study and analyze the sequence

    本論文結合西安市建築安全監督站建築工程文件資料管理計算機化的要求,對建築工程資料管理系統進行了全面的研究。本項目參照現有建設工程資料管理系統,依據最新的建築工程施工統一,遵循建設項目信息管理管理系統開發的一般原則,研究和開發了建築工程施工資料管理系統,基本上實現了對施工資料的計算機管理。
  20. We will construct under the practicable state and quality requirement of client. the qualified percent of unit work up to 100 %

    嚴格按照國家現行的《建築安裝工程施工及規范》和業主的施工,單位分項工程的評定合格率達到100 %
分享友人