驗槽 的英文怎麼說

中文拼音 [yàncáo]
驗槽 英文
check of foundation subsoil
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  1. Fixed cistern barometers are used as a standard for checking altimeter.

    固定式氣壓計可以作為標準件去檢測高計。
  2. This article introduces the features of the high - amperage prebaked aluminum cell at the initial production stage, and based on the results of successful experiments in some smelter, puts up the process parameters settings for the initial production startup stage of high - amperage prebaked cell to realize the high efficiency, energy saving, low consumption, environmental protection and long life of the cell

    摘要文章介紹了大型預焙鋁電解生產初期的特點,根據在某鋁廠進行成功試的結果提出了在大型預焙電解生產啟動初期的工藝參數的設置,以達到電解高效、節能、低耗、環保、高壽命的目的。
  3. Fixed cistern barometers are used as a standard for checking aneroid barometers.

    固定式氣壓計可以作為標準件去檢無液氣壓計。
  4. Fixed cistern barometers are used as a standard for checking.

    固定式氣壓計可以作為標準件去檢
  5. Nuts, plain or slotted castellated - test methods

    普通或開頂螺母.試方法
  6. Such as : the liner of coal bunker of power station, the lining of dust cyclone and classifying cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and low friction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風器,鋪設各類化工廠地面,汽車剎車試場地面等,也用於襯砌酸洗或儲存腐蝕性物品的貯存室。
  7. The cast basalt tiles may be used in all kinds of ways. such as : the liner of coal bunker of power station, the lining of dust cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and lowfriction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風除塵器、旋流器、鋪設各類化工廠地面,汽車剎車試場地面等,也可用於襯砌酸洗或儲存腐蝕性物品的貯存室。
  8. Experimental study on cohesive sediment in ring channel

    粘性泥沙環形水研究
  9. The corrugated steel, frameless structure proved to be most blast-resistant of those tested.

    紋鋼板無架結構經事實證明是試中最能抗爆震波影響的。
  10. Electroplated coatings - chemicals for cyanic and or alkaline electroplating baths - requirements and testing

    電解鍍層.氰化和或鹼化用化學品.要求和檢
  11. The effects of different current density on the alloying element content were discussed. based on the results, the optimal process condition was confirmed : pb ~ ( 2 + ) 80 - 90 g / l sn ~ ( 2 + ) 7 - 15 g / l ch _ 4so _ 3 ( dissociative ) 130 - 150 g / l composite additive 12 ml / l current density 2 - 6 a / dm ~ 2

    採用hull方法確定了甲磺酸體系電沉積pb - sn合金鍍層的電流密度范圍,並探討了不同沉積電流密度下pb 、 sn合金含量的變化規律。
  12. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試、十字板剪切試、旁壓試等) ,查明了原廠址區存在一個長江古凹,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  13. The silicon plates are formed reverse four wimble array in koh solution by wet - etching technology. then the electrochemical etching experiments are done in three poles electrobath. and some technology questions such as heat oxygenation, light etching, wet etching and electrochemical etching have been analyzed. at the same time sample appearances are analyzed by scanning electron microscope. according to current burst model theory, the electrochemical deep holes etching mechanism are analyzed

    在三極電解中,進行了電化學深刻蝕的探索性實。對氧化、光刻、濕法刻蝕和電化學刻蝕中的工藝問題進行了初步的理論和實研究,同時,採用sem對實樣品進行了形貌分析,並採用電流突破模型對電化學深孔刻蝕機理進行了理論分析。
  14. The results of experimental investigation on heat transfer and fluid pressure drop of spirally fluted titanium - tubes for steam condensation are reported and analyzed

    摘要介紹了鈦螺紋管傳熱及流動阻力的實結果,並對結果進行了分析。
  15. The results of soil trough experiment indicated that, the flow velocity and froude number would add when the rainfall splash intensity rose ; the flow depth and resistance coefficient would decrease when the rainfall splash intensity increased

    結果表明:土壤坡面薄層水流流速和弗汝德數隨雨滴打擊強度的增加而增加,水深、阻力系數隨雨滴打擊強度的增加而降低。
  16. About engineering geological inspection of foundation subsoil

    淺談工程地質驗槽
  17. The author mainly discussed the importance and some special notes in the proof - text of groundwork with other confreres, enhanced the owners and interelated departments ' recognition of the proof - text of groundwork, through a case study in shenyang city of liaoning province in northeast china

    摘要針對目前勘察市場地基驗槽工作存在的問題與不是,利用相關的技術規范並結合部分工程實例,探討分析地基驗槽工作的重點及地質異常的處理方法,歸納總結地基驗槽工作出現問題的原因,重申地基驗槽工作的重要性,用以加強業主及相關部門對地基驗槽工作的重視。
  18. Petroleum measurement systems - calibration - temperature corrections for use when calibrating volumetric proving tanks

    石油測量系統.校準.校準容積檢驗槽時用的溫度修正值
  19. Building products. determination of the emission of volatile organic compounds. emission test cell method

    建築產品.揮發性有機化合物釋放量的測定.釋放試驗槽
  20. Examination of construction trench and foundation local treatment method

    施工驗槽及地基局部處理方法
分享友人