高位破水 的英文怎麼說

中文拼音 [gāowèishuǐ]
高位破水 英文
high rupture of waters
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 高位 : high order; high order position; altitude高位餐桌 high table; 高位共振 high lying resonance; 高位...
  1. The analysis of micro - climate site of the road greenbelt in the building process of expressway, a lot of calcareousness, powder of coal ash, asphaltum and stone were put into used. on one hand, it completely destroys the original soil structure, making the soil really barren, on the other hand, the rise of roadbed also affects the ground water to go up, making the soil very drought

    路體綠地立地條件分析速公路在修建過程中,採用了很多的石灰、粉煤灰、瀝青、石塊等材料,一方面使原有的土壤結構被徹底壞,土質十分貧瘠,另一方面路基抬影響地下上升,土壤十分乾旱。
  2. At present, whereas so many reasons such as its using function changing from irrigation to city water supply, the increasing of importance, the original design standard on the low side, the damage and aging of structure, the demand for seismic fortify in strong earthquake region and offering data of technical alteration for adding flux aftertime, it is important for safety and seismic capability of this aqueduct bridge

    目前,該渡槽使用功能由灌溉輸改為城市供、實際重要性提、鑒于原設計標準偏低、結構的病害和老化損以及地處強震區對抗震設防的要求,為日後加大流量進行技術改造提供依據,因而急需對渡槽作較詳細的安全可靠性評估和抗震性能評估。本文針對該渡槽進行了原現場檢測,並對其進行結構分析計算和結構的安全性能與抗震性能的評估等方面的工作。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層碎帶處理,趾板部採用混凝土塞,其它部採用半透料置換,並根據本工程特點在下游壩腳加設了反濾層.為提壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  4. He struggled to hang onto a baby cushion, but when the water rose above his chest, the pressure broke the metal curtain and swept him out onto the street headed toward the river

    他自己掙扎爬上一張嬰兒床墊,當漲到胸前時,他一點辦法也沒,然而奇跡地,流沖了鐵門,把他帶到街上,往河邊流去。
  5. With the very low water to cement ratio, rpc has ultra - high strength high ductility and low permeability. in this paper, the compressive strength of rpc can reach to a high point with the number approximately 135mpa. as illustrated from the study results, we can approve some fundamental conclusions : there are big effects on rpc with deferent kinds and properties of raw materials and deferent curing conditions ; stress - strain curve shows the process of destroy with rpc samples ; x - ray diffraction analysis indicates that heat treatment at temperatures 90 accelerate the hydration of rpc sharply, therefore, mechanical and microstructural properties of rpc are highly dependent on heat treatment ; it is believed that rpc materials have excellent resistance to chloride permeability ; during the heat treatment, the shrinkage of rpc developed quickly because of chemical reactions ; the rpc with slag mostly has the advantage of rpc without slag about resistance to solutions corrosion

    研究結果表明:通過對rpc各組分摻量變化的研究,可以找到rpc的最優配合比;試件成型后的熱養護制度對rpc的性能影響巨大; rpc的抗壓應力?應變曲線可以反映出試件受壞時微裂紋的擴展情況,剛纖維的摻入可以大幅改善rpc的韌性; rpc在成型后存在較大的收縮,而其中的化學收縮要遠遠大於乾燥收縮; rpc具有很強的抗氯離子滲透性能,漿體的密實度很;通過x射線衍射實驗,可以發現rpc的膠凝體中ch晶體已經幾乎不存在,膠凝體主要由c - s - h凝膠和未泥顆粒組成;在抗溶液侵蝕的實驗中,摻礦渣rpc的抗溶液侵蝕性能在絕大多數情況下要好於不摻礦渣試件,酸、堿溶液和浙江工業大學碩士學論文摘要一些鹽溶液都會對rpc的結構產生侵蝕作用,但是機理各有不同。
  6. In this paper, chroma dc coefficients are selected as the carrier data because chroma dc coefficients are robust. also, alterable steps are used to select one part of the coefficients, so the watermark is imperceptible ; before watermark embedding, the watermark is divided into many parts, every part is individually embedded into one gop of the video, even if a gop is destroyed, the watermark can be extracted correctly, this methods promotes the robustness of the watermark ; in addition, in order to promote the security of the watermark, the user ' s id and password are used to generate chaos sequence by the chaos system which is created in this paper, later, watermark is mixed by the chaos sequence. also, the embedding position of the watermark bit is modified by one chaos sequence, so, unauthorized person can not extract or remove the watermark, since the embedding position is unknown

    本文認為,色度dc系數是魯棒性非常好的參數,因而選擇色度dc系數作為印信息載體,同時,採用可變的步長選擇部分系數,保證了印的隱形性;在嵌入印時,本文採用印信息「網格劃分」 、各子塊獨立嵌入視頻的方案,由於印信息子塊是相對獨立的嵌入視頻中的每一相對獨立的圖組當中,即使某一圖組收到一定壞,也能夠恢復印信息,使印的健壯性得到提;此外,為了提印信息的安全性,在嵌入印信息時,根據用戶輸入的id號和密碼,利用本文構造的混沌系統產生的混沌序列對印信息進行變換,同時,對每一印信息比特的嵌入置也採用了偽隨機序列進行調整,這樣,未授權用戶不能提取印信息,也難以擦除其中的印信息,因為嵌入的置是未知的。
  7. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生壞;建壩后平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩壞。
  8. Through the research of the tension in vivo, the immediate retraction rate and histology examination about the different ways and different maintaining, we get : the increase area of the rapid and conventional expansion has little difference with the expanded time ; however it has significant difference with the maintaining time. it shows that shortening the expanded time is feasible in clinic, but shortening the maintaining time is out of the question ; after the capsule is removed, immediate retraction rate of the expanded skin notably decreased, significantly different from those with intact capsule ; the collagen content of the rapid expansion is just the same as the conventional expansion, but the changes of the histology dependences on the maintaining time. comparison with conventional expansion, rapid expansion has no significant drawback ; maintaining a period after expansion can greatly increase the area of expanded skin and reduce immediate retraction

    通過對不同擴張期、不同方式和不同維持期對擴張皮膚的在體張力、即時回縮和皮膚組織學的研究,得到:快速擴張和常規擴張最後獲取的皮瓣,面北京工業大學工學博士學論文一積增加差別不大;擴張皮膚的面積增加和張力下降與維持期的長短有關;而與擴張期的長短關系不大,說明在皮膚擴張術中可以縮短注時間,但是維持時間不能縮短;擴張皮膚去除包膜后的即時回縮率下降,與未去除包膜的相比較有明顯差異;快速擴張皮膚的膠原含量變化與常規擴張的基本一致,擴張皮膚的組織學變化與維持期的關系較為密切,與擴張方式關系不大;快速擴張和常規擴張相比,快速擴張沒有明顯的壞作用;擴張結束后,維持一段時間,能有效的提擴張面積且能有效地減少回縮。
  9. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對爆動力作用,進行邊坡的動力響應分析,得出了以下結論: ( 1 )振動頻率為0 . 3hz時,坡面頂部平向加速度峰值最大;綜合考慮,可認為該邊坡的自振頻率為0 . 3hz左右; ( 2 )地形對爆地振動存在放大作用,研究剖面的坡面,平向加速度及移在地形相對差45米左右最大,而後隨相對差的增而減小,相對差為100米時,平向移及加速度絕對值均大於坡腳; ( 3 )強迫振動段,平向加速度值隨時間變化的規律為:坡頂節點總的變化趨勢是越來越大,而坡體中部節點的變化趨勢是越來越小; ( 4 )當爆振速較小時,變形壞的形式表現為坡頂表面滑塌型。
  10. The rock anchor beam is the most difficult and demanded in excavating underground factory, its quality will affect its safety of performing later, as a result, a better quality and smaller crushedregion is demanded

    電站地下廠房開挖中,巖錨梁開挖難度大、質量要求,該部成型質量的好壞將直接影響今後廠房內吊車的運行安全。巖錨梁開挖要求其具有良好的開挖輪廓面和較小的壞范圍。
  11. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力移及壩體在竣工期、蓄期等各個階段可能產生的壞進行了認真研究。
  12. A flap vlave used in pumping station is a kind of hydraulic - operated automatic gate, which is similar to a hinged check vaive. because of their simple structure and reliability, being able to shorten the length of outlet passage and facilitate the starting of pumping system in comparison with siphonic vacuum - distroied cutoff scheme. so it is propitious to be used and save investment but at the same time, flap valves always show some disadvantage

    因拍門簡單、可靠,與虹吸真空壞截流閉鎖方式相比,可以縮短出管道(流道)長度,並利於泵系統起動,與快速閘門相比,拍門也有諸多優點,閘門門體易關閉不到或卡住不能活動,因為門槽和?塊較軸孔容易殘留異物,閘門門體克服滑動阻力不僅無機械增益,且阻力和動力不在一直線上,門體易傾斜而自鎖,而拍門的工作可靠性則遠於快速閘門。
  13. Morce can help enterprises to avoid the harm and the cost brought by core employee turnover, such as hindering the smooth operation of enterprise, causing the turnover of human capital with high quality, bringing about high cost of replacing post, making the characteristics of enterprise culture obscure, leading to the cost of intangible assets, damaging the core competitive capacity of enterprise. next, morce is the essential of human resources management and is helpful for increasing the efficiency of human resources management and improving its level. therefor, morce should have the most important place in human resources management

    核心員工流失對企業的危害和損失是多方面的,如影響企業正常運營、造成優質稀缺性人力資本流失、帶來昂的職重置成本、模糊企業文化的特色、導致無形資產損失、壞企業核心競爭力等;其次,保留核心員工是企業人力資源管理的前提,有利於提人資管理效益和全面提升人力資源管理平,因而應將核心員工保留管理置於企業人力資源管理工作的首;特別是在當代新的經濟環境下,企業對優質稀缺性人才的爭奪日趨激烈,保留核心員工顯得尤為重要。
  14. ( 4 ) on the basis of analysed result and the status quo of huxi bank, computing the slope safety and seepage of bank by fem. the result shows that the tarus quo of huxi bank could not satisfy theslope safety on designed flood lever. after the reinforcement of seepage, the method can not only reduced leakage, debace the soggy but also ameliorate stress fields. lt also can reduce horizontal displacement and certical displacemeng which have disadvantages to bank

    進行堤體防滲加固后,不但可以減少滲漏,降低堤身浸潤線,還可以有限度地提抗滑穩定安全系數,改善堤身及地基的應力場,使在作用下產生的不利於堤體安全的移和豎向移減小。對在後繼采動中可能造成的防滲材料的壞進行了校核,結果表明材料是安全的。
  15. Uplift reduction by drainage is an important technology for ensuring large - sized channel lining works, especially in preventing damage of uplift in high groundwater level to lining body during the non - conveyance period

    摘要大型渠道襯砌中的排減揚壓技術是確保渠道襯砌施工的一項重要技術,對于防止非輸期特別是汛期地下對襯砌體的揚壓壞具有重要作用。
  16. Details behavior as bellows : ( 1 ) the damping force of the damper with concrete ductility column is higher, and the final damping force smoothly decreases. ( 2 ) the ductility ratio of the damper with concrete ductility column is larger, so it has good ductility and its most level displacement is 1 / 14 ~ 1 / 8 of the column height. ( 3 ) the hysteretic curve of the damper with concrete ductility column is plumper

    具體性能如下: ( 1 )混凝土延性柱耗能器的阻尼力比較,後期阻尼力下降比較平緩; ( 2 )混凝土延性柱耗能器的移延性系數較大,具有較好的延性,最大移達到柱的1 / 14 1 / 8 ; ( 3 )混凝土延性柱耗能器的滯回曲線飽滿; ( 4 )混凝土延性柱耗能器中延性柱屈服后等效粘滯阻尼系數迅速增大,消耗地震能量的能力增大; ( 5 )混凝土延性柱耗能器中每根延性柱的壞形態基本一致,表現了良好的共同工作性能。
分享友人