高壓鉆進 的英文怎麼說

中文拼音 [gāozhēnjìn]
高壓鉆進 英文
high pressure drilling
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 壓構詞成分。
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : 進構詞成分。
  • 高壓 : 1 (殘酷迫害; 極度壓制) high handed 2 [氣象學] (高氣壓) high pressure3 (高電壓) high tension...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、孔多點滲儀及模系統、巖質邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、精度大地測量監測自動化系統等項目,研究成果內容新、先、實用,已在工程中應用,效益顯著。
  2. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    機採用曲柄連桿、游梁式沖擊機構,使機具有兩種沖擊功能;正常以連桿沖擊為主,遇到特殊情況,用連桿沖擊不能時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊,可提效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層等特殊地層的困難,又很好地解決了沖擊機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該機底盤行走移位採用步履式;塔採用液起立,減少了輔助作業時間。
  3. The hydrodynamic propulsor takes drill fluid as power source, with the aid of the axial load produced by the pressure drop of the bit nozzle, makes the axial force act on the bit to produce wob, making up for the insufficient wob, ensuring the bit feeding smoothly and improving the penetration rate

    這種推器以井液為動力源,藉助頭噴嘴降產生的軸向載荷,使軸向力直接作用於頭產生,彌補有效不足,保證頭平穩,提機械速。
  4. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋灌混凝土成樁技術自研製以來,已在多項復合地基工程中行了應用,較好地解決了軟弱地層成孔困難的問題,適應地質條件范圍廣,成樁速度較快,工期短、工效;與復合地基成樁時的泥漿護壁成孔工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成孔工藝相比,螺旋灌混凝土成樁的側阻和端阻都有相應的提,樁的承載性能較好,復合地基的變形較小。
  5. Application of downhole hydrodynamic propulsors solves the problem of exerting wob, and are helpful to enhancing penetration rate

    井下液力推器的應用在一定程度上解決了的施加問題,有利於提速度。
  6. The result of the study shows that the electro - hydraulic proportional technology is useful for all - hydraulic operated drilling machine to simplify the operations and composition of system, to improve the level of automatization and efficiency and to reduce the consumption of energy. the result of the study also shows that the system of feeding has the properties as followed : fast respone, stable pressure - adjusted characteristic, distinct effect of energy - saving, some improvement of system efficiency

    研究結果表明:全液機中應用電液比例技術,可以簡化系統組成和操作,提機自動化水平,提系統效率,降低發熱和溫升;採用恆變量泵的給電液比例控制系統調性能穩定、響應快、節能效果明顯。
  7. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀速公路昔格達組泥巖層中孔樁提承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為力灌漿技術的工程應用和一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  8. The thesis was written under the direction of dynamic theory of forming reservoir, follows the rules of comprehensive information, judgment, interpretation and assessment and even makes full use of outcrop geology, data from drilling and logging, data from laboratory analysis and achievements in geophysical exploration. considering the basic factors of forming reservoir in the south of ordos basin as the starting point, the thesis defines that yanchang group of triassic goes into the start of generating oil in the late period of mid - jurassic and that the largest oil generation peaks in the middle period of early cretaceous, after the analogue - history of hydrocarbon generation. meanwhile it also establishes the relationship between the evolution of oil and gas and the formation of traps, the time of oil exploration

    本文以成藏動力學理論為指導,本著綜合信息、綜合判斷、綜合解釋、綜合評價的原則,充分利用露頭地質,測井資料,實驗分析資料及物化探成果,以鄂爾多斯盆地南部的基本成藏要素為出發點,通過生烴史模擬,確定了三疊系延長組在中侏羅晚期( 150ma )入生油門限,于早白堊世中期達到最大生油峰期;同時並確立了油氣演化與圈閉形成、捕油時間的關系;通過流體勢的全區計算,提出了該區油勢具有明顯的「雙層」結構特徵,並建立了以靜水力為主的重力流系統和以差異實作用為主的實流系統的流體動力分佈模型;通過成藏動力學系統的劃分及事件分析,探討了該地區油氣聚集規律,最終指出了有利的含油氣遠景區。
  9. Application of dth drilling with simultaneous casing in high pressure spiral jet grouting technology in pebble formation

    潛孔錘跟管技術在卵石層旋噴灌漿工藝中的應用
  10. Abstract : based on the in - situ pressure - grouting experiments and the full - scale pile tests of xinxiang and ligou and yangzhou bridges, the process and effect of jet pressure - grouting are presented in this paper. the mechanism of increasing the performance of bored piles by grouting is also analyzed. an engineering experience of applying the new technique is presented in the paper

    文摘:根據新鄉、鞏縣及揚州等地孔灌注樁樁底力灌漿現場試驗和樁的靜載試驗,介紹了樁底力灌漿的工藝及力灌漿的效果,並對力灌漿提孔灌注樁承載力的機理行了分析,對其推廣應用作了介紹。
  11. Associated with a practical example of pipeline crossing with directional drilling technique in yizheng - changling crude oil pipeline, this paper analyzes the characteristics of crossing through rocky stratum with directional drilling, deliberates the stratum status, drilling machine selection, drilling tool assembly, direction control, mud control ; drilling process as well as emergency dealing scenarios at the stages of guiding - hole drilling, aperture expanding and back - towing

    摘要結合儀征長嶺原油管道洪湖長江定向穿越工程實例,分析了管道定向穿越長距離巖石層的特點,論述了定向穿越巖石層的地層狀況、具組合、控向措施、泥漿控制、工藝以及導向孔、擴孔、回拖階段的應急預案,針對在導向孔過程中因泥漿、信號線多次出現被泥漿沖壞、造成控向信號不穩定甚至中斷的情況,對信號線的安裝提出了改措施。
  12. The mast is raised to the working position by a pair of hydraulic cylinders, and is locked in the vertical drilling position by two hydraulically actuated mast anchor pins

    支架通過一對液缸提升到工作度,並通過兩個液啟動的錨定銷鎖定在垂直位置。
  13. Changsha lnstitute of mining research cimr with rich design experiences is the earliest to be engaged in research on downhole drilling tools and rock drill bits in china and has carried on the work more than 25 years

    我公司這次在這次展覽會上展出了cs165 , cs100d , cs100l和潛孔機,並行了水射流技術的介紹和推廣工作。產品的技術領先得到了很多公司的認同。
  14. Abstract : in some project, pebble is used in bearing stratum. for the resean of lower strengthand bad property of construction. the bearing capacity of pebble can ' t achieve the reauirement of up - structure. but the pebble soild has higher permeability coefficient and placeability. the method has remarkable economic results

    文摘:在以礫卵石層為持力層的樁基設計中,由於其可性差、易坍塌,強度相對較低,但是具有較大的孔隙率和滲透系數,可灌性較好,採用一定力對孔灌注樁樁底礫卵石持力層注入水泥漿液對其行加固處理,可以較大地提其承載力,並能取得較為明顯的經濟效益。
  15. The neural network prediction software is programmed by using c language. this software is applied during the real under - balanced drilling. the results show the prediction accuracy of the method above is relatively high

    用c語言編制了神經網路預測軟體,並且對欠平衡井的井底行了實際預測,結果表明該方法具有較的預測精度。
分享友人