高應力區 的英文怎麼說

中文拼音 [gāoyīng]
高應力區 英文
region of high stress
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 區名詞(姓氏) a surname
  1. The high geotectonic stress at the construction region and the activity subsurface water will have important effects on construction and operation

    隧洞施工穿越,且施工活躍的地下水對隧洞施工及日後的安全運行有著重要的影響。
  2. Abstract : this paper discribes the principle of rook acoustic emission techniques. some applications such as insitu rock stress measuring, locating high stress zone, predicting roof falling and evaluating rook stability are presented

    文摘:論述了巖體聲發射技術的基本原理,介紹了其在采礦工程中的若干用成果:地測量、高應力區圈定、冒頂預測預報、穩定性評價。
  3. 7mpa / km in the center of the zone ( 6 ) in the hot dry rock geothermal energy extraction system, after the system start to operate, the normal stress of crack show the pronounced influence depending on the temperature ' s change in a month, there are a marked drop in temperature nearby the injection well, forming a lower stress area, with the heat extraction, the temperature ' s change even gradually, but the temperature descend quickly nearby the production well, forming a new lower stress area

    ( 6 )溫巖體地熱開發中,裂縫面法向受溫度變化的顯著影響,在系統開始運行的一個月內,注入井附近域其溫度降低較快,形成低;隨開采時間的延長,其溫度變化逐漸平緩,而生產井附近域溫度降低加快,逐漸形成新的低
  4. Further more, the fracture possibility is analyzed with fracture mechanics after the stress calculation of local high stress area around the bolt hole in shell flange and the measurement of fracture toughness of gray cast iron. the improving structure of bolts connected head and shell flange is brought forward

    此外,在計算獲得缸體法蘭螺栓孔局部高應力區水平后,由斷裂學分析發生脆性斷裂的可能性,並提出烘缸缸體與缸蓋聯接結構的改進方案。
  5. Review on research of mining in high - stress deep zone

    深部高應力區采礦研究綜述
  6. Water detection and release safely in high stress district of isolated island face

    孤島高應力區內的安全探放水
  7. Research on prevention of rock burst in deep high - stress area of fankou deposit

    凡口礦深部高應力區巖爆防治研究
  8. Gas comprehensive treatment of high gas and high - stress area in gaocheng coal mine

    告成礦瓦斯高應力區瓦斯綜合治理技術
  9. Practices on dynamic prevention and control of pressure bump in high stress zone of sanhejian mine

    三河尖煤礦高應力區沖擊礦壓動態防治實踐
  10. The prevention and control of rock burst are of great significance for safely exploiting deep deposit in high - stress area

    摘要巖爆的預防和控制對深部高應力區礦床的安全開采具有十分重要的意義。
  11. The ratio of the diameter of nozzle to the diameter of vessel has greater effect on the distribution area of high stress in plastic deformation stage

    對于均處于塑性階段的結構而言,開孔率的大小對高應力區的分佈范圍影響較大。
  12. Moreover, the slip dislocations were generated in the direction of [ 110 ] and [ 112 ] on [ 111 ] plane, which were most possible for dislocations to slip

    發現矽片中位錯與高應力區相對,位錯的產生主要是熱作用的結果,並且位錯沿[ 110 ]和[ 112 ]易滑移方向產生。
  13. The results of numerical calculation show no stress concentration occurred, and the high stress regions are converted into the deep areas after applying coupling support scheme

    計算機模擬結果顯示,巷道實施耦合支護方案后,集中程度減小,高應力區向深部圍巖轉移,支護系統可靠性明顯增強。
  14. ( 5 ) conclusion was obtained by the analyzing and studying the mechanics environment of the rock mass and the landslide on right bank : according to the analysis, the present direction of the maximal principle stress was consistent with the present tectonic stress field, the value of the principle stress increased or reduced in special place, and there was tensile stress region at the 2000m or above it on the left bank, the accumulate and adjustment was very limited in 200 years, the calculated result of the landslide indicated that the landslide on the right bank was stable under the various conditions

    ( 5 )壩址河谷巖體學環境及右岸古滑坡體的穩定問題分析得出:河谷巖體場的分析顯示,河谷巖體中主的方向基本上與現今域構造場的方向一致,在一些特殊地帶巖體的主值有所降低或增,特別是在左岸的2000m程附近及以上,存在有明顯張。在未來200年流變計算時步范圍內,河谷巖體的積累與調整較為有限。同時對滑坡體各種工況條件下的穩定性計算結果表明,右岸古滑坡體在各種工況條件下是處于穩定狀態的。
  15. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體量值明顯增,同時左岸的張的范圍及量值明顯減小,主的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本最強地震的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本最大地震的共同作用,壩體將在滑坡體下滑推的作用下產生破壞;建壩后水平推對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理學參數的降低而有可能導致壩體失穩破壞。
  16. Abstract : fatigue cracks in ship hull structures are most likely to occur in the highly stressed structural details. the conventional fatigue analysis is largely dependent on the determination of stress concentration factors ( scfs ) at the locations considered. this paper is concerned with the stress concentration of cutout in transverse web for longitudinal stiffener. a series of finite element models is carried out for the stress analysis of predefined structural details. the tabulated scfs of typical cutouts ( abs tanker rules ) in transverse web for longitudinal stiffeners are presented based on the finite element analysis ( fea ) results

    文摘:疲勞裂紋往往發生在船舶結構的局部高應力區,而疲勞分析結果通常取決于任何準確確定結構的集中系數.本文研究為鋪設縱骨而在艙壁板上開孔的集中,採用有限元方法對預先給定的結構進行分析,基於有限元計算結果給出了艙壁板典型開孔(參見abs油船規范)的集中系數表
  17. The temperature and stress field of wagon wheel under the condition of long ramp way cycle braking in daqin line have been simulated by using fem and axial symmetry model results indicate that high stress area appears on the wheel web, and the strength of wheel meets the requirement of routine operation under current braking condition

    摘要採用軸對稱模型和有限元方法,模擬了大秦線長大坡道循環制動條件下貨車車輪溫度和場,結果表明車輪高應力區出現在輻板上,現行制動條件下車輪強度滿足使用要求。
  18. In the process of loading, the stress around the junction linearly increases at first and then the range of the high stress area enlarges

    在逐步加載過程中,加載前期相貫周邊呈線性增長,一定程度後主要表現為范圍的擴大。
  19. By comparing between the rectangular groove and curved groove, we find that two high stress area of rectangular groove o - ring occurs during the sealing period, and the wearing on the both inside and outside diameter surfaces ; the high stress area only happens at the part area of cone shaft, and the distribution of stress is more even than the former, and the wearing is on the inside diameter surface, the improvement of its distortions makes the service life of sealing lengthen

    通過矩形槽和弧形槽的對比研究發現,矩形槽o形圈在密封過程中出現兩個高應力區,磨損發生在內徑、外徑兩個表面_匕,弧形槽o形圈的高應力區僅出現在牙爪軸鄰近的局部域內,分佈較前者更為均勻,磨損進發生在內徑表面,其受變形狀況的改善將使密封壽命進一步提
  20. A new method is necessary. in this paper, we employed the i - deas software to developed a 3 - d model and make a finite element analysis ( fea ) on slewing frames based on the nominal loads and geometry parameter of crane qtz63, aimed to find the principle of the area with high stress and big deformation and estimated the effect on the whole tower crane system

    本文以qtz63塔機為研究對象,按設計提供的載荷及幾何參數,運用i - deas軟體先對回轉支承系統三維建模,再進行結構有限元分析,依據強度及變形結果,找出塔機各種工況下高應力區域、變形明顯部位出現的規律,並分析對塔機系統產生的影響。
分享友人