高應力結構 的英文怎麼說

中文拼音 [gāoyīngjiēgòu]
高應力結構 英文
highly stressed structures
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. In the dissertation ' s chapter 3 to chapter 5, the mechanical and physical performances of the engineering plastics are analyzed, the failure mode and the designing computing methods of engineering plastics member suffering the static load, dynamic load, impact load, pulse load, are studied. by the practice application and ball firing experiment of the engineering plastics key piece in the weapons, the precious experiences, for engineering plastics application and confirmation of the material performances guideline in the weapons, are obtained

    論文的第三章至第五章,分析了工程塑料物理機械性能,研究了受靜載荷、動載荷、沖擊載荷及脈沖載荷下工程塑料件的失效模式和設計計算方法,通過工程塑料在槍械關鍵受件上的實際用和實彈射擊試驗,取得了寶貴的經驗,為性能工程塑料在槍械上的用和材料性能指標的確定奠定了基礎。
  2. They include the ship kelvin wave pattern and wave resistance, the interaction of surface waves with floating bodies, the seakeeping of ships high - speed vessels and offshore platforms, the evaluation of the drift forces and other nonlinear wave effects responsible for the slow - drift responses of compliant offshore platforms and their mooring systems designed for hydrocarbon recovery from large water depths

    這包含了船波和波的阻抗、波和浮體的交互作用、速行駛船舶與近岸物之耐海性、拖曳評估及其他造成順式近岸物緩慢飄移現象的非線性效,與物設計于深海中以重獲碳氫化合物之錨定系統。
  3. This thesis also introduces some kinds of the jointing of cable and membrane strucfores. an open - air palestra has been designed in this thesis. the force density method has been used to analyze the shape, and the nonlinear finite method has been used to analysis the loads

    最後,本文還採用文中推導的離散方法,通過密度法對某風雨操場進行形態分析,並通過將找形果用非線性有限元法在無荷載狀態下計算果表明本文推導的方法找形精度是足夠的。
  4. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜穩定性分析角度出發,針對在該項目中涉及的層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元分析程序對層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主矢量圖、位移分布圖( ux 、 uy )以及等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  5. The situation and development of domestic and foreign manufacture, especially in the europe, america and asia, have been summarized and researched in the article, so the following work has been finished, and the conclusions and results are obtained as follows : through analyzing the features of movement, power and construction for the high - speed cnc gear hobbing machine in 6 - axis with four coordinated, the design methods of general arrangement, kinetics and kinematics are put forward. 1. by analyzing the severe challenge to the machine manufacture in the market, developing and managing methods of serial modular products are posed

    為了給我國汽車工業和其它行業提供先進的齒輪加工設備,本文在總、研究國內外特別是歐美國家齒輪機床現狀與發展的基礎上,進行了以下研究工作,並得出相論與成果:分析了六軸四聯動數控速滾齒機的運動、動特點,提出了六軸四聯動數控速滾齒機的總體布局設計、動設計、運動學設計方法;分析並根據市場對機床製造業提出的嚴峻挑戰,提出了數控滾齒機系列產品的模塊化開發方法與管理方法;在分析了六軸四聯動數控速滾齒機模塊化設計的技術先進性與經濟性間辨證關系的基礎上,提出了產品開發過程中以邊際成本法進行經濟分析的方法。
  6. With the study of the ability of unbounded ppc structure and the development of materials of unbounded ppc and the technique of light jack, the advantage of unbounded ppc structure has been widely recognized

    隨著對無粘性能的研究,無粘材料供充足和輕型張拉千斤頂技術的發展,以及無粘樓蓋在層建築中的普及,無粘混凝土的優點已得到廣泛的認可。
  7. Further more, the fracture possibility is analyzed with fracture mechanics after the stress calculation of local high stress area around the bolt hole in shell flange and the measurement of fracture toughness of gray cast iron. the improving structure of bolts connected head and shell flange is brought forward

    此外,在計算獲得缸體法蘭螺栓孔局部區的水平后,由斷裂學分析發生脆性斷裂的可能性,並提出烘缸缸體與缸蓋聯接的改進方案。
  8. The ratio of the diameter of nozzle to the diameter of vessel has greater effect on the distribution area of high stress in plastic deformation stage

    對于均處于塑性階段的而言,開孔率的大小對區的分佈范圍影響較大。
  9. Abstract : fatigue cracks in ship hull structures are most likely to occur in the highly stressed structural details. the conventional fatigue analysis is largely dependent on the determination of stress concentration factors ( scfs ) at the locations considered. this paper is concerned with the stress concentration of cutout in transverse web for longitudinal stiffener. a series of finite element models is carried out for the stress analysis of predefined structural details. the tabulated scfs of typical cutouts ( abs tanker rules ) in transverse web for longitudinal stiffeners are presented based on the finite element analysis ( fea ) results

    文摘:疲勞裂紋往往發生在船舶的局部區,而疲勞分析果通常取決于任何準確確定集中系數.本文研究為鋪設縱骨而在艙壁板上開孔的集中,採用有限元方法對預先給定的進行分析,基於有限元計算果給出了艙壁板典型開孔(參見abs油船規范)的集中系數表
  10. Also it is discussed how to improve loading performance and the actual results using invariance theory. by the feedforward signals of velocity and acceleration, it is expected to expend the bandwidth to 15hz or even higher and reduce the additional torque at 80 percent. in this thesis, i mainly explored the design theory of ehsls and made a lot of experiments on subsystems and the whole system

    本文的目的就是設計、調試帶有彈簧桿緩沖的單通道電液伺服加載臺,通過試驗比較、驗證不同控制演算法的工程實際效果;分析和研究不變性原理如何改善加載系統的動態性能,目的是通過引入速度和加速度的復合前饋信號將系統的動態頻帶提到15hz左右,並且有效的抑制加載系統固有的多餘矩,抑制比要達到80以上。
  11. According to the result of monitoringmeasurement and the test data of surrounding rock pressure, primary supportstress and structure internal force, analyzed the law of soft rock deformationin the extremely high ground - stress portion of baozhen tunnel, and adjusted therelevant construction parameter, that insured construction safety

    根據現場監控量測果和對圍巖壓、初支的測試數據,分析了堡鎮隧道極段軟巖大變形的規律,及時調整相施工參數,確保了施工安全。
  12. Theuse of permanent backing bars in highly stressed welds in hullstructures is to be avoided as far as possible

    例2 :船體中,凡承受的焊縫,盡量避免採用固定墊板連接。
  13. Different from the construction of rc, the construction of pc needs high technique. there is a close relation between design and construction, and different manner of construction would result in different internal force of structure

    混凝土的施工不同於普通鋼筋混凝土的施工,其對技術有較的要求,且預在設計與施工上關系密切,施工方式的不同有可能造成的不同。
  14. The result of macro - quality experiments show : mineral admixtures markedly slow the hydrating velocity of cement slurry, decrease and delay the hydrating max - temperature, in which steel slag is more effective ; expansive agents compensate concrete shrinkage, enhance the concrete dense degree, strengthen the interfacial layer between fiber and cement matrix and improve the physical mechanics qualities of acic ; minimal admixtures markedly improve the concrete workability property, increase the concrete later intensity & density and the capability of anti - chemical attack and anti - permeability ; hybrid fiber reinforces the toughness of obviously acic by the means of anti - cracking effect of fiber with different sizes and different properties in the corresponding construction levels

    實驗果顯示:鋼渣摻合料能顯著減緩水泥漿體水化速率,降低砂漿的水化溫升並延遲最溫升時間;補償混凝土收縮,提混凝土密實度,加強纖維與水泥石的界面粘,增強混凝土學性能,但不能明顯改善混凝土韌性。混雜纖維通過纖維的不同尺度與不同性質在相層次上產生阻裂效,增韌鋼渣防滲抗裂混凝土;增加混凝土的破壞極限能,極大提混凝土抗彎曲能和韌性指數,改善混凝土脆性。
  15. A fter analyzing the present state of the ranks of teachers in yantai professional college and comparing it with the other nine professional technical colleges and institutes in shandong province, the writer thinks that all the higher professional colleges and institutes should, based on self training, introduce more teachers to improve the degree structure of teachers ; enhance the quality of " double masters " to improve the ability structure of teachers by employing both full - time and part - time hands ; and at the same time, the government should strengthen the propaganda for the importance of higher professional education, make qualifications for teachers of higher professional education and offer policy supports about the professional title, payment, etc. only in this way can we have " full - time and part - time teachers of noble ethic, new teaching idea, strong reforming consciousness, high teaching level and great practical ability ", can we really promote the construction of the ranks of teachers in higher prof essional colleges and institutes to make it possibly reach the construction level set by the education department of our country in 2005

    筆者通過對煙臺職業學院師資隊伍現狀的分析,合與山東省其它9所職業技術學院的對比研究認為,各等職業學院師資建設必須立足自主培養、加強引進以改善師資隊伍的學歷;專兼合,提「雙師」素質以改善教師隊伍能;同時,國家加強等職業教育重要意義的輿論宣傳,制定等職業教育教師資格標準,並提供職稱、待遇等方面必要的政策支持。只有這樣,才能建設一支「師德尚、教育觀念新、改革意識強、具有較教學水平和較強實踐能的、專兼合的教師隊伍」 ,才能切實推進等職業院校的師資隊伍建設工作,使其有可能在2005年達到教育部規定的師資隊伍建設水平。
  16. Topics covered include : modeling strategies for complex structures ; application to tall buildings, cable - stayed bridges, and tension structures ; introduction to the theory of active structural control ; design of classical feedback control systems for civil structures ; and simulation studies using customized computer software

    課程主題涵蓋:復雜的模型建策略;層建築、斜張橋及張用;主動控制理論概述;用於土木方面的古典回饋控制系統設計;以及用客制化軟體進行模擬研究。
  17. Under the horizontal earthquake action and wind force, aim at " the pure frame structure with rectangle columns ", " the pure frame structure with special - shaped columns ", " the frame - truss structure with special - shaped columns " and " frame - shear wall structure with special - shaped columns ", earthquake action analysis was done by the spacial finite element method through the changes structural parameter. analyzing systematically " structure vibration mode ", " vibration period ", " structure lateral rigidity ", " seismic action force ", " seismic response force ", " floor seismic shear force ", " lateral horizontal displacement of structure " and " members internal force ". results indicate : ( 1 ) based on equal area, the special - shaped columns replaced the rectangle columns, the structural lateral rigidity enlarges, the lateral displacement minishes obviously, the earthquake response increase slightly, the biggest increasing amount of frame columns axis - compress ratio is smaller than 0. 08. the whole aseismic performance of structure has improved ; ( 2 ) when the section ' s length and section ' s thickness ratio of special - shaped columns is smaller than 3. 6, the structure benefits to resist seismic action ; ( 3 ) the angle of horizontal seismic action with the whole coordinate is 0 degree, structure earthquake response is bigger, belonging to a control factor of structure aseismic design ; ( 4 ) the frame - truss structure with special - shaped columns and the " a " - brace has the biggest lateral rigidity ; ( 5 ) the frame - shear wall structure with special - shaped columns have bigger lateral rigidity and smaller displacement, members internal force enlarged just rightly, have much superiority of resisting seismic action ; ( 6 ) in the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), adopting special - shaped columns structure system, should reduce possibly the building ' s self - weight in order to reduce the earthquake response ; ( 7 ) the response spectrum method of computing seismic response and the time - history analysis method have similar analysis result

    西安理工大學碩士學位論文在水平地震作用下,並考慮風荷載組合,分別對「矩形柱純框架」 、 「異型柱純框架」 、 「異型柱框一析架」及「異型柱框-剪」等四種體系,通過改變參數,運用空間有限元方法,進行地震作用計算。系統地分析研究「振型」 、 「振動周期」 、 「側向剛度」 、 「地震反」 、 「樓層地震剪」 、 「側向位移」 、 「層間位移角」 ,以及「件內」 。果表明:在等面積原則下,異型柱代換矩形柱后,剛度增大,側向位移明顯減小,地震反略有增加,框架柱軸壓比最大增幅小於8 % ,整體抗震性能有所提;當異型柱肢長肢厚比小於等於3 . 6時,有利於抗震;水平地震作用與整體坐標夾角為0度時,地震作用效較大,屬設計的控制因素之一;異型柱框一析架採用「人」字斜撐,側向剛度大於「八」字斜撐和「人一八」字混合斜撐;異型柱框一剪側向剛度大、位移小,件內增大適中,是一種抗震性能優越的體系:在抗震設防烈度較地區( 8度)和抗震不利的建築場地( m類場地) ,採用異型柱體系時,盡可能減輕自重,降低地震作用;分別採用「振型分解反譜」法和「時程分析」法進行地震作用計算,兩種方法所得果基本一致。
  18. Strengthening of concrete beams with externally bonded carbon fiber reinforced plastic ( cfrp ) materials appears to be a feasibe way of increasting the load - carrying capacity and stiffness characteristics of existing structures. cfrp strengthened cocrete beams can fail in involve steel yield - cfrp tenside rupture and steel yield - concrete crushing

    用碳纖維復合材料( cfrp )加固修復混凝土,增強體(碳纖維)和基體(環氧樹脂)有良好的界面粘強度,這是一種行之有效的加固方法,它可以提現有物的承載能和剛度。
  19. It is found that the rational located destressing boreholes can induce structural failure of the surrounding rock - mass, consequently the high stress move deeply in the rock - mass, and the stress environment in the surrounding rock is ameliorated, the spatio - temporal order of the destruction of the surrounding rock - mass is changed when the destressing boreholes and bolting net with wire mesh composite support are accomplished, therefore the compound supporting technology has prominent advantage for control the deformation and destruction of the surrounding rock

    模擬發現:合理布置的卸壓孔可以導致巷幫圍巖的性預裂破壞,從而使圍巖向深部轉移;在卸壓孔和錨網聯合支護后改善了圍巖附近的環境,改變了圍巖破壞的時空次序,對控制圍巖變形和破壞具有突出的優越性。
  20. Abstract : based on the destruction mechanism of earthquake to buildings and the theory of frame e - lastic - plastic force, a discussion is made of how to enhance the antiseismic ability of frame structure dur - ing the construction

    文摘:針對地震對建築物的破壞機理,根據彈塑性理論,提出了在施工中為提框架抗震能特別注意的問題。
分享友人