高拉鋼 的英文怎麼說

中文拼音 [gāogāng]
高拉鋼 英文
hi-ten
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 拉構詞成分。
  • : 鋼名詞(鐵和碳的合金) steel
  1. High - speed steel broaching tools - technical delivery conditions

    刀.交貨技術條件
  2. High tensile strength steel for tower structural purposes

    塔結構用伸強度
  3. High tensile strength steel forgings for tower flanges

    大型法蘭用伸強度鍛件
  4. Covered electrodes for high tensile strength steel

    伸強度用塗覆電焊條
  5. High tensile strength steel tubes for tower structural purposes

    塔結構用伸強度
  6. For example, high strength reinforced bar, stainless steel medium plate, auto wheel rim steel and so on

    力螺紋筋,不銹中板,汽車輪網等。
  7. High tensile deformed steel bar

    力異形
  8. Clamping unit contains two crankshaft and is made of high - intensity steel. it uses straight - line rail which runs fast and easily

    採用製造的雙曲軸鎖模機構、移動部件採用直線導軌,具有剛性、運行輕快等特點。
  9. Special new outer plate construction with strong impact resistance force, high rigidity and high tensile strength design of tank chain, providing better outer plates performance than traditional ones

    全新特殊結構外鏈片設計、具有強化抗沖力、性、力多元性能設計坦克鏈、並具有於傳統外鏈片性能、特性。
  10. Two serving and one former staff members of the main contractor for a home ownership scheme construction project at wang tau hom estate phase 14 in connection with the alleged use of reinforcement ste

    廉政公署拘捕了橫頭?第十四期居者有其屋建築工程總承建商的兩名地盤雇員及一名前職員,懷疑他們使用未能通過檢定測試的筋花鐵建造居屋上蓋。
  11. Hard drawn high carbon steel wire

  12. A former site administrator of the main contractor for a redevelopment project at wang tau hom estate was sentenced to 120 hours of community service for conspiracy to defraud the housing department in relation to the disposal of non - compliant reinforcement steel bars at the site

    橫頭?重建計劃總承建商的一名前地盤總務員,訛稱已將未能通過檢定測試的筋運離地盤,串謀詐騙房屋署,被判須履行一百二十小時社會服務。
  13. Abstract : this article presents the problems and the reasons causing the problems in the operation of slab ccm mold in pansteel. a study has been carried out on the efficient ccm mold featuring high casting speed. and following the study relative technical measures are put forward, which ensure an increase of the ccm casting speed

    文摘:分析了攀板坯連鑄結晶器在使用中出現的問題及其產生原因,對以速為核心的效連鑄結晶器結構進行了研究,提出了相應的技術措施,確保了攀連鑄機速的提
  14. The reason of defects and danger to producing and drawing of rod also were analyzed in order to provide reference for producing and analyzing quality of high carbon steel rod

    分析了這些組織缺陷產生的原因以及它們對盤條生產和后續拔的危害,為盤條的生產及產品質量分析提供參考。
  15. It was showed that under the transverse tension, high stress concentration and even concrete cracks would appear on the oblique webs of the model

    研究表明,在張橫向預應力束以後,主梁邊箱斜腹板中部會出現應力區以及混凝土裂縫。
  16. Technical conditions for hot - extruding pe protection high strength wire cable of cable - stayed bridge

    橋熱擠聚乙烯索技術條件
  17. Sino - foreign joint venture nanjing dongwu metal material co., ltd. is a hi - tech enterprise which specially produces and sells induction heat oil tempered spring wire and die pusher rod

    中外合資南京東吳金屬製品有限公司是一家專門生產經營感應加熱油淬火-回火彈簧絲冷鐓絲軸承絲異形絲退火磨光定尺線材冷絲和模具推桿線材的新技術企業。
  18. With the appearance of high strength concrete high tensile steel wire and cable, the cable - stayed bridge is more and more widely used and popular. it unites three diversely bearing structure style, compression tower tension cable and bending press beam, into one bridge style

    橋是隨著強度混凝土材料、絲和索的出現才得到廣泛推廣應用的橋型,它把主塔受壓、索受及主梁受壓彎的三種不同受力的構件有機地組合在一個統一體中。
  19. Because of the former anchorage systems designed according to matching 1860mpa strength strands in the beginning of 90 ", they can not be suitable any more for the super strength strands with 2000mpa. therefore, some accidents occurred such as strands sliding and broken when tensioning. in addition, the advantages of the new materials as their high mechanics performance are not be used completely as the prestressing structures was designed as per the 1860mpa strands, which will result in the waste of materials, in view of the above - mentioned facts, by means of analyzing the development of anchorage systems home and abroad, in connection with the characteristics of the super strength strands ( 2000mpa ), this topic made a research on hvm15 anchorages by theoretical calculation and finite element analysis, and also on the manufacturing process and test

    隨著預應力技術的發展和冶金工業冶煉技術的不斷進步,預應力絞線的強度不斷提,由原來1470mpa提到1860mpa , 90年代末期已出現了2000mpa超絞線,而原來的是在90年代初期按抗強度為1860mpa的絞線標準設計的,因此,原有的錨具已不能適應現有超強度2000mpa的絞線強度要求,在工程中出現了斷絲滑移現象,同時,在使用和設計時仍按1860mpa絞線的指標進行設計應用,沒能充分發揮材料的力學性能,造成材料浪費。
  20. Usage : the set of the machines is a ideal equipment drawing wire stock of high, medium and carbon steel, as well as copper, alumium, and alloy. the machines are applied to drawing wire in the factories such as wire - steel factory, metal mesh factory and nail making factory etc

    一)用途:本套設備是撥低、中、線材的理想的設備,也可撥銅、鋁等有色金屬和合金線材,廣泛用於絲,纜,建築構件,鍍鋅鐵絲,金屬網,制釘等廠礦絲之用。
分享友人