高架梁 的英文怎麼說

中文拼音 [gāojiàliáng]
高架梁 英文
overhead girder
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 高架 : elevated; overhead
  1. Nowadays, the bridges are in wide use in china, many new types of bridges such as large span bridges, cloverleaf junction and complicated viaducts emerge

    近幾十年來,中國的橋建設突飛猛進,城市中大跨橋、立交工程和復雜大量涌現。
  2. After that, through discussion about the landscape estimate criterion, the author summarizes it as follows : aspect relation and meaning. then, based on the landscape features of the urban viaduct rail transit along the no. 1 subway in hangzhou, the authors analyzes and summarizes the challenges that we must affront to and comment on the aspect of the styles and colors of the viaduct. at last, from a combined view with city planning, the author puts forward some advice about the improvement on the sculpt and colorific aspects of viaduct

    論文首先分析了軌道交通的景觀特點和空間組合模式;通過討論景觀評價的標準,將景觀評價標準總結為外顯、關系、內涵三個方面;然後結合杭州市地鐵一號線工程,從外顯、關系、內涵三個方面分析軌道交通可能產生的景觀影響問題;最後結合城市設計的角度,對橋的造型和色彩等方面提出部分改進意見。
  3. Erection of segmental bridge deck by launching gantry no. 1

    運用吊機興建中的
  4. Erection of segmental bridge deck by launching gantry no. 2

    運用吊機興建中的
  5. Erection of segmental bridge decks by launching gantry no. 1

    運用吊機興建中的
  6. Erection of segmental bridge decks by launching gantry no. 2

    運用吊機興建中的
  7. A research over substructure design for jinbin light rail viaduct with jointless track

    採用無縫線路的津濱輕軌下部結構設計研究
  8. Construction of concrete parapet along viaduct

    橋建造橋護欄
  9. With their aid a vital viaduct on the main athens railway line was destroyed.

    在他們的幫助下,破壞了雅典鐵路干線上的一座主要
  10. 3. the parameters of steel frame with infill which affect the lateral, resistant ability, such as panel ratio, frame - to - panel connectors, frame - to - panel interface friction, gap between panel and frame and mortar joint bond and friction were discussed. it is emphasized that the reduced location, shape and dimension is very important for the function of dog - bone reduced beam flange and must be paid more attention

    對填充墻寬比、填充墻與鋼框抗剪連接件、內填充墻與框空隙、填充墻開洞和鋼框與內填充墻界面摩擦等影響填充墻鋼框抗側力性能的因素進行了討論,並指出設計中考慮這些影響因素對于達到預期的設計目的是至關重要的,必須予以重視。
  11. Erection of falsework for in - situ bridge deck construction at viaduct b1

    興建中的隔音屏地基興建中的橋橫
  12. The viaduct is not only the tallest in the world outstripping the 282 - metre towers of the akashi kaikyo bridge in japan it is also the longest cable - stayed bridge

    密佑橋不僅是世界上最的橋超了日本明石海峽大橋282米的橋頭堡,也是世界上最長的斜拉橋。
  13. The 500 - tonne units were floated out on a barge, lifted into position and the cable stays connected. this bridge and the viaduct were built by the kumagai - maeda - yokogawa - hitachi joint venture under a hk 1. 643 billion contract. the joint venture comprises kumagai gumi hong kong ltd. and three japanese firms, maeda corporation, yokogawa bridge corporation and hitachi zosen corporation

    汲水門大橋及馬灣道路工程合約價值港幣16 . 43億元,由熊谷前田橫河日立合營企業建造,該集團成員包括熊谷組香港有限公司和叄間日本公司,分別是前田建設工業株式會社橫河橋株式會社和日立造船株式會社。
  14. ( 2 ) the crack load increases with the increase of the amount of the prestressing steel or the tensioning stress

    ( 2 )預應力筋用量的增加、張拉控制應力的增大使預應力框、柱的開裂荷載提
  15. When the prefabricated plant is under the viaduct, the monolithic box girder is lifted by the gantry crane and transported by the special rotary traversed platform, and then transported and erected by the bridge girder transporting and erecting machine

    當預制場設在橋下時,採用提機提起整孔箱,通過特製旋轉式橫移平臺喂,運一體式橋機運
  16. There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )

    懸索橋施工中需要吊裝的材料和構件很多,豐都長江大橋懸索橋主纜採用空間外張式,使加勁的吊裝不能採用一般的纜載吊機形式,為使施工的順利進行,本橋施工中開發了多功能索道施工方案,以一副索道完成了多種工作,全面解決了上部結構(包括加勁)的多項吊裝作業。
  17. The following conclusions are reached. ( 1 ) the relative height compressive zone of section or the axial force is bigger, the rotational capacity of the section is weaker

    得出了以下主要結論: ( 1 )截面相對受壓區度、截面所受軸力顯著地影響預應力框截面的延性。
  18. In view of the construction peculiarity of non - bracket construction trait of y - shape pier upper plate beam in goughexin road viaduct project, the author uses the beam - rod finite element to calculate the whole construction period by steps, compares the result with engineering practice, and finally proves, the calculation can offer reference for the construction and design of non - bracket upper plate beam

    摘要針對共和新路橋y型墩上蓋無支的施工特點,採用桿單元,對上蓋施工過程的各工況進行了分步計算,並與現場測試結果進行比較, ?上蓋無支施工設計提供依據。
  19. Summary on installation method of working platform for construction of cast - in - place viaduct girder in urban transit system

    城市軌道交通工程線路現澆施工作業平臺搭設方法總結
  20. If the bridge proves unexpectedly profitable, the french state has the right to take possession from 2044

    如果事實證明密佑橋的贏利能力大大超出預計,法國政府有權從2044年起收回橋的經營權。
分享友人