高架輸電線路 的英文怎麼說

中文拼音 [gāojiàshūdiànxiàn]
高架輸電線路 英文
overhead transmission line
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 高架 : elevated; overhead
  • 輸電 : transmission; transmit electricity輸電導線 transmission conductor; 輸電量 transmission capacity; ...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Calculation of thermal stability of grounding wire of overhead line

    熱穩定的計算
  2. In view of the rapid development of electric undertaking and a sharp increase of steel products consumption, the state development planning commission, the former state water resources and hydropower ministry and state energy ministry have been urging that the building of steel towers should be strictly controlled in the construction of transformer substations ; and warning that the need of the present 500kv power transmission and transformer trusses can hardly be satisfied by ordinary steel and concrete electric poles or prestressed concrete poles, which have endangered the operation and longevity of the high voltage transmitting line due to the common problem of cracks by gravity

    隨著力工業建設的迅速發展,鋼材的用量急劇增長,為此,國家計委,原水部和能源部一再強調在工程建設中,應從嚴掌握自立式鐵塔的建設。然而,一般的鋼筋混凝土桿或與預應力混凝土桿,較普遍地存在著縱向裂縫問題,嚴重影響了的安全運行及其使用壽命,已不能適應桿塔和變的要求。
  3. With their digital distribution frames connected to the transmission equipment, such ports provide trunk paths at 2 mbs by means of hf cable

    利用纜在2mbits速率上,經數字配( ddf )與傳設備相連接,提供交換機間的中繼通
  4. In the following chapters, a 16 - channel experimental phased array ultrasonic testing system is thoroughly explained, including digital beam forming, low noise programmable amplification of received ultrasound signal, multi - channel hi - speed hi - precision data acquisition, hi - speed real - time processing of multi - channel ultrasound signal, and hi - speed data transfer based on pci bus. in addition, the frame of software system is built

    本文詳細闡述了作者所獨立研製的16通道相控陣超聲檢測實驗系統,包括數字化超聲發射/接收波束形成、超聲信號的低噪聲程式控制放大、多通道精度數據採集、多通道超聲信號速實時處理、基於pci總速數據傳等全部模塊的結構及工作原理,並說明了所編寫的底層軟體系統的框
  5. The major products include cross - linked polyethylene insulated power cables of high, medium and low voltage, pvc insulated power cables, aerial insulated cables, aluminum stranded conductors and steel core aluminum stranded cores, control cables, flame - retardant cables, fire - resistant cables and polyvinyl chloride insulated cables and wires and cords of rated voltage up to including 450 750v. the company has set up good ties of co

    公司主要產品有:中壓交聯纜聚氯乙烯絕緣空絕緣纜稀土鋁絞及鋼芯稀土鋁絞控制纜阻燃纜耐火纜以及b r系列塑料絕緣纜500kv用大截面鋼芯鋁絞
  6. When switching the no - load overhead lines by alternating - current high - voltage circuit breaker which is a kind of daily operations in electric power system, over - voltage is probably bringed out and insulating property of the electric devices is breakdowned sometimes, especially, when occuring re - strike. the main purposes that the tests on switching line - charging current are performed in the laboratory are assessing re - strike performance of circuit - breakers. according to the test results, the design of the circuit - breaker is optimized and re - strike performance is improved

    交流壓斷器是力系統中最關鍵最重要的設備之一,斷器開合空載力系統中常見的操作,操作過程中通常會出現過壓,對系統絕緣造成威脅,嚴重時會破壞系統的絕緣性能,發生事故,隨著力系統壓等級的提不斷延長及傳容量的增大,由操作過壓引起的絕緣閃絡、設備破壞事故的幾率更加突出。
  7. Based on the research project of my tutor the application of a new unified power flow controller in extra high voltage transmission lines operated in two phases, the existing principle of upfc and methods of the transmission lines operated in two phases, put the new upfc into hai - jin - jia 330kv extra high voltage transmission lines based on perfecting the framework of main net located in west of river in gansu which can improve the quality of electric power and ensure power transmission or transfer between the main net of gansu and the area of west of river

    本文綜合分析了海-金-嘉330kv超在正常運行和故障情況下的諸多問題,在upfc的現有成果和非全相運行現有方案的基礎上,結合導師的研究課題? ?新型統一潮流控制器在超非全相運行中的應用。提出在完善甘肅河西主網結構的基礎上,將新型的upfc應用於海-金-嘉330kv超,可以較好的解決壓質量問題,確保甘肅主網與河西地區網的功率傳、轉換。
  8. Galloping is a low frequency, large amplitude, wind induced vibration of high voltage overhead transmission line

    舞動是覆冰導在風的作用下發生的一種低頻大幅度振動。
  9. This paper makes a study of the simple fault detecting of oil field power system realizing by computer, proposes to apply the theory of traveling wave location and has the clarity of mathematical model concept and high automation. to the power delivery system with many emitting branches, it has a practical sense to save computer operation period and memory, making software design and simulation

    本論文研究油田力系統簡單故障檢測的一種計算機實現方法,提出利用互感器模型的行波法測距理論,數據模型概念清晰,自動化程度較,對放射式分支較多的網能顯著節省機時和內存,並進行軟體設計與模擬,具有一定的實用意義。
分享友人