高水頭電站 的英文怎麼說

中文拼音 [gāoshuǐtóudiànzhàn]
高水頭電站 英文
high head development
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水頭 : waterhead; head; flood peak水頭落差 head fall; 水頭坡降 water table gradient
  • 電站 : power station電站船 generating ship
  1. A research on canceling telescopic joint of the penstock about the high head development near power house

    取消高水頭電站壓力鋼管近廠房段伸縮節研究
  2. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級是一首部設低閘,採用長隧洞引、大流量的引
  3. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國事業也迎來了迅猛發展的大好時機,一批正在建設或規劃之中,其泄建築物孔口及愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  4. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦700mw輪機的參數選擇進行了研究,通過對國內外的大容量、輪機的比轉速統計計算,利用輪機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了輪機主要參數選擇論證,提出了適合拉西瓦輪機的主要目標參數。
  5. Firstly, the thesis briefly reviews the history of voltage and reactive power control technology, focusing on the defects of the equipment in use. then, with the theoretical analysis and the discussion on voltage and the characteristic of power system as well as the basic principle of voltage and reactive power control, the thesis makes a research on the character of voltage and reactive power control and interprets the controlling regularity of substation. in addition, with the consideration of the changes of transformer tips and the combined influence of capacity groups and reactive power and voltage, the thesis makes adjustment suggestion to the different operating - zones of voltage and reactive power

    本文從降低網損和提自動化平著眼,對變壓無功控制應用方面的問題進行了研究,本文首先簡要回顧壓無功控制的發展概況,著重指出了現有壓無功控制裝置的缺陷;通過理論分析,在討論力系統壓、無功調節特點以及壓無功總體控制原則的基礎上討論了變壓、無功控制特性以及控制原理,給出了變壓無功的控制規律;考慮了變壓器分接的變化及容器組的投切對無功和壓的綜合影響,針對壓、無功的各種運行控制區域給出了相應調節策略。
  6. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放平空載損耗負載損耗噪聲以及能適應溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求負荷較大的地區,適用於層建築機場車地鐵醫院廠冶金行業購物中心居民密集區以及石油化工核核潛艇等場所。
  7. Structural study on underground bifurcation of hydropower station with high pressure

    地下埋藏式鋼岔管結構研究
  8. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的最優綜合控制組合曲線及網潮流,總結出了如下規則:隴南網在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並聯補償抗器作為主要措施;在2010年夏小運行方式下則投入適量並聯補償容器作為主要措施,再輔助以選擇合適的主變有載調壓分接來調節,達到控制網內無功潮流分佈合理、各變母線壓在理想的范圍內時網有功損耗最小,從而也提網安全運行平及供質量。
  9. The tubular turbines are the best selection for exploitation of tidal power and hydraulic power with extremely low heads and extremely large flow rates. they have large discharge, high specific and high efficiency, and need less excavation. they have been classified into bulb, pit, siphon and " s " types in the light of their structural types

    貫流式輪機是開發特低,特大流量及潮汐發的良好機型。該機具有開挖量小,過流量大,比轉速等特點。按其結構型式分燈泡式豎井式軸伸式等。
  10. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決壩建設中泄建築物的流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展力學的研究與發展均具有重要的理論與實踐意義。
  11. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是壩大庫的高水頭電站,還是低河床式樞紐,口的取排沙歷來是一個倍受關注的問題。
  12. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山溢洪道進渠流態、提泄流能力,通過一系列試驗優化了溢洪道引渠左導墻部曲線型式。
  13. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引管道、調壓井、壓力主管的兩臺輪機調節系統大波動時的模擬模型,引入實際的參數,對甩負荷過渡過程進行了模擬計算,分析力干擾對安全、穩定運行所造成的影響,並提出了一系列減輕力干擾的措施。
  14. Through repairing the worn parts of four hydropower stations of xinzhuang, zaoqi, suide and qiemo, and taking some comprehensive anti - abrasion measures, such as checking and repairing the runner blade, cutting the head of blade into round shape, adding an apron to the outer edge of blade and increasing a guiding plate in the head of blade, a good effectiveness has been gained so that it increases the output of generating unit and enhances the abrasion resistant capacity

    通過對新莊、棗渠、綏德、且末4個的磨蝕破壞部件的修復、轉輪葉片測型與修型、葉片部割圓角、葉片外緣加裙邊、部加導流板等抗磨蝕措施的綜合治理,取得較好效果,使機組出力增加、抗磨蝕能力提
  15. The sealing test pressure can be the highest static head calculated according to power station

    ;密封試驗壓力可按計算值( hmax ) 。
  16. The axial - flow turbine generator set is suitable for low head from 2m to 70. its feature is that the water flow passes through the runner axially. the axialflow turbine generator set can be classified into two forms according to the runner construction : one is fixed blades propeller for small variation of head and power, the other is movable blades kaplan for large variation of head and power

    貫流式輪發機組是低大流量的較好機型,一般適用於2 ~ 15米,其特點是流從進口到尾出口都是軸向的,流道基本上成直線,因而貫流式輪發機組具有流特性好,效率較等特點。
  17. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的壓力問題,進一步分析和研究了襯砌荷載及外壓力的作用機理和計算方法; ( 4 )以錦屏二級深埋長引隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排方案和灌漿封堵方案不同情況下的滲流場的分佈進行了數值模擬,並對其外壓力進行了分析和研究,提出了滲流控制的具體措施。
  18. Commonly used type selection methods for high water head hydropower set with pelton turbine are evaluated by means of technical and economical parameter comparison method on the practice of jingganshan mingzhu first cascaded hydropower station

    摘要結合井岡山明珠一級輪發機組選型設計實踐,採用技術和經濟參數比較法評述沖擊式機組選型常用方法。
  19. In this case, when one of the machines be placed into the transition process of the vident fluctuating pressure for some kind of reason, the other machines would be affected become of the fluctuating pressure in the diversion system and drainage system of water in upstream and downstream which use the same one surge tank and the same one penstock with the machine, so the other machines would be put into transition process of fluctuating pressure, and become a kind of hydroelectric interfere

    中,通常幾臺機組共用同一調壓井,且共用壓力主管。在這種情況下,當其中一臺機組由於某種原因處于大波動過渡過程,則其在上下游引、尾系統中引起的壓力變化必然會影響與其共用調壓井和壓力主管的其它機組,使其它機組也處于過渡過程,形成一種力干擾。
  20. To meet the peaking need of the grid and improve the source structure of the system, it is necessary to construct the mass pumped storage power station. and more high pressure tunnels will be constructed

    大規模抽蓄能的建設是現代網的必然產物,它在力系統中起調峰填谷作用,提網運行的靈活性和可靠性;相應大直徑工壓力隧洞的建設也逐漸增多。
分享友人