高溫混凝土 的英文怎麼說

中文拼音 [gāowēnhúnníng]
高溫混凝土 英文
high temperature concrete
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 高溫 : high temperature; elevated temperature; hyperthermia; megatemperature; inferno
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標、各節段支模標、澆注后的標的結構計算和其理論計算結果之後,詳細論述了主梁的標線形控制方法和內容,實際支模標的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構度監測的方法。
  2. At the same time, the problem from the concrete cracking is effectively solved through the measures such as enhancing the quality of the excavated surface, adjusting the admixing ratio of fly - ash in the concrete, and lowering the temperature rise of the hydration heat

    同時通過提開挖表面質量,以及調整粉煤灰摻量以降低水化熱升等措施,有效地解決了裂縫問題。
  3. It focuses on the theory of the mineral functional materials " improving the anti - chloride permeability and the chloride binding. the main achievements of this article include : 1 ) use the technology of xrd, sem, bet, laser particle size distributor etc to test the component, the construction, particle size distributor, specific surface etc of micro - silica, ultra - fined slag, high quality fly ash, meta - kaolin clay, four types of the mineral functional material, theoretically analysis the functions which the four mineral functional minerals act on cement concrete, namely pozzolanicity effect, filling effect, micro - aggregate effect, surface adsorption effect and so bring into play the affect of plastification, lowing of temperature, reinforcement, improvement of durability. base on this analysis we can conclude that the proper diameter of the mineral functional material is 5 m - 15 m, that is blain fineness 4500cm2 / g - 7500cm2 / g

    本論文的主要成果包括以下幾個方面: ( 1 )採用xrd 、 sem 、 bet 、激光粒度分析儀等多種測試手段,探明了以硅灰,超細磨粒化爐礦渣,優質粉煤灰及偏超細粉等4種超細礦物功能材料的組成、結構、粒度分佈、比表面積等基本性質;從理論上分析了礦物功能材料在中的4種效應,即火山灰效應、填充密實效應、微集料效應、表面吸附效應,並由此發揮出增塑、峰削減(降熱) ,增強及耐久性改善等作用;通過相關理論分析,推導出礦物功能材料的合理粒徑范圍在5 m 15 m ,即勃氏比表面積為4500cm ~ 2 g 7500cm ~ 2 g 。
  4. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的度場和徐變應力場模擬模型理論,編制了碾壓壩的三維有限元模擬計算程序,在程序中考慮了各種控措施的數值模擬,包括:水管冷卻、冬季保、降低的澆築度、夏季表面噴水霧、施工汛期壩頂面過水等。
  5. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管為柱、冷彎薄壁c型鋼背靠背頻焊接組成工字型梁、壓型鋼板上現澆築組成組合樓板並與梁一起構成組合梁作為承重構件,以輕質節能保型墻體作為圍護結構組成。
  6. Based on the project imbrued especially by hunan province construction office, the study of this paper includes four parts as follows : the first part does some simplify on the characters of the rc material under high temperature. after transferring the rc section under fire to equivalent one at normal temperature based on the stiffness and intensity equivalent, the rc members under fire can be calculated as ones at normal temperature

    主要研究內容如下: ( 1 )基於剛度等效或強度等效原則,根據截面各點材料力學性能的退化,把受火鋼筋非均勻截面等效成常下的鋼筋截面,使得下構件剛度和強度的計算可按常下的計算理論進行。
  7. Ill 6. regularity of concrete petrography changing with temperature, standing time, cooling and curing process was studied by x - ray diffraction analysis. microscopic mechanics relative to macroscopic phenomenon after fire was discussed

    利用x -射線衍射分析試驗研究了火災的巖相隨受火度、靜置時間、冷卻及養護方式的變化規律,探討了火災后產生宏觀現象的微觀機理。
  8. The construction execution of prestressing work has many advantages such as : dry - work, rapidity, no organic adhesion agent, small space to be taken, the high efficiency of strengthening, so this way can be applied in the structures which request to improve bearing capacity largely and take small space after strengthening as well as other structures which will work in long time and in high temperature

    預應力加固過程是干作業,施工速度快,不使用有機粘結劑,加固后佔用空間小,加固效率,適用於要求大幅度提承載力及加固后佔用空間小的結構,也適用於要求施工速度快,加固后使用年限長,工作環境的結構。
  9. In the dam foundation restraint area, mgo can be mixed into concrete to prevent dam longitudinal crack. research on autogenous volume change of rcc mixed with mgo, and research on thermal stress compensation of darn foundation prove that rcc mixed with mgo plays a role in dam crack control

    在材料措施方面,深入研究碾壓壩基礎約束區採用外摻mgo措施,利用其微膨脹性能補償壩體降過程中產生的度應力,以防止大壩縱向裂縫的發生。
  10. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    縫面處理採用壓水流沖毛技術,大大提了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提了壩體成型質量和工程進度;在二期施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提,經濟成本大大降低;三峽二期工程持續強度施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程控綜合技術的應用,有效降低了壩體度的產生;表面處理及裂縫處理技術的應用,提了建築物的整體性和耐久性。
  11. The result shows that the compressive strength of concrete under natural variational low temperatural curing is higher than the compressive strength of concrete under permanent low temperatural curing and the pore porosity under natural variational low temperatural curing is less than the compressive strength of concrete under permanent low temperatural curing ; the compactibility of concrete is good with fa ( < 15 % ) and sf ( < 8 % )

    結果當摻合料摻量相同時,自然變低( - 15 ~ 5 )養護條件下抗壓強度於恆低( - 10 )養護條件下抗壓強度,孔隙率要低於恆低( - 10 )養護條件下的孔隙率;當單摻粉煤灰時摻量低於15 % 、單摻硅灰時摻量低於8 % ,低的密實性較好。
  12. This paper unfolds engineering disposition and theoretical research of negative temperature high performance concrete ( nthpc ) with the damage of many factors motivation, the project background based on qing - zang railway engineering, which is one of four - emphasized engineering during the tenth five - plan. due to the difference of environment of construction and service between nthpc and ordinary concrete, and therefore durability of nthpc is required to higher level. at a first, nthpc must avoid frozen damage at early age and possess anti - freezing property at later period, in order to meet engineering practicable application need, and this are two emphasized and difficult problems, as for nthpc ; by means of mechanism analysis about deicing - agent ingredient and anti - freezing at early period, adopting composite technique routine of mineral addition + anti - freezing element + water - reducer4 - air - entraining + anti - erosion of steel component etc, based on orthogonal experimental approach, fd - 1 composite functional admixtu re was manufactured, which has more property and orientation on qing - zang railway

    由於和普通在施工環境及服役環境上存在的差異,因此表現為比普通更為較的耐久性要求;負首先要避免早期的凍害以及具備長期抗凍性能,才能夠滿足工程實際應用的要求,這也是負必須解決的兩大技術關鍵;通過對目前常用防凍劑組分作用機理的分析研究及早期防凍機理探討,採用礦物外加劑+防凍組分+效減水劑+引氣+阻銹組分功能復合的技術路線,通過正交試驗設計復配了適應青藏鐵路工程要求的專用多功能復合型外加劑fd - 1 ;並在此基礎上配製不同等級負性能,開展一系列包括硫酸鹽侵蝕、氯離子滲透、抗凍融循環、收縮及耐磨性等耐久性能研究;通過對fd - 1組分和摻量的調整,優化負在施工特性、力學指標和耐久性三個方面的兼容、協調性。
  13. Abstract : based on the fundamental principle of hypothesis strain equivalence, itwas investigated a physical concept of high strength concrete at minus temperature ( hscmt ) freezing damage parameter, the elastic modulus of frost concrete with anti freeziug admixture and without antifreezing admixture built and it was analyzed their variate process and the condition adaptated. it is purpose to judge hscmt frost failure process

    文摘:從應變等效性假說的基本原理出發,研究了負凍結損傷參數? ?彈性模量法中受凍后測試的損傷彈性模量的物理概念,從而分析了摻防凍劑及不摻防凍劑受凍后的彈性模量變化過程及其選用該參數的適應性條件,為判斷負材料凍結失效過程提供保證。
  14. Sandwich seismic wall which concrete column was replaced with angle - steel truss was discussed in this paper in order to be used as outer - walls of multi - story shear walls system

    本文研究的是以角鋼桁架代替暗柱的夾芯保抗震墻,以下簡稱復合墻板。目的是用作小層剪力墻體系的外墻。
  15. Based on above, the characteristics of hydration hardening process and microstructure of hsc as well as the interfacial layer between cement paste and coarse aggregate are investigated under low water cement ratio, high content superplasticiser and with one kind or more than one kind of mineral materials condition, the reaction mechanisms of different mineral materials are also discussed

    研究了不同水膠比、復合緩成分效減水劑及礦物摻合料的摻加方式、摻量對水泥漿體水化放熱過程和水泥漿體的水化熱、水化放熱速率以及最升的影響規律。探明了中水泥漿體的水化硬化過程、礦物摻合料之間的相互作用機理。
  16. Abstract : based on the test results of frost micro pore structure density distribution of high strength concrete at minus temperat ure ( hscmt ), the frost damage fiber bundle model of hscmt was buitl. the purpose is to study frost damage factor of hscmt in the future, to deduce lost efficiency p robability of hscmt and prevent hscmt from frost in cold weather

    文摘:根據負凍結顯微孔結構密度分佈結果,建立了凍結損傷纖維束模型,為進一步研究負的凍結損傷基因,推斷負的失效概率,及負受凍害的防止打下基礎。
  17. In this thesis, the experimental research of the behavior of high strength concrete axial compression columns and eccentric compression columns under non - uniform temperature field are conducted. from the experimental analysis, the variational regularity of ultimate load capacity and deformation of high strength concrete compression - flexure members under non - uniform temperature field is obtained. the influences of different factors including temperature, stirrup contents, strength grade of concrete, pre - loading level, eccentricity and different loading - temperature paths to refractory capability of members are investigated

    文中還對軸心受壓柱和偏心受壓柱在不均勻度場下的力學性能進行了試驗研究,通過試驗分析了壓彎構件極限承載力和變形在不均勻度場下的變化規律,考察了不同升度、箍筋用量、強度等級、預加荷載水平、荷載偏心以及荷載?度途徑等對構件耐火性能的影響,通過試驗量測,得到了構件的截面度場。
  18. Two - addition technique of flying ash and silica fume can meliorate durability of concrete ; air - entraining admixture possesses anti - freezing, descending ice point, and improving workability, and thereof it should be used in concrete. but controlling its dosage is very important to avoid strength loss

    發現粉煤灰和硅灰的雙摻技術能夠顯著改善的耐久性能,引氣劑具備防凍抗凍、抗滲及提工作性的優點,在負中應該加大使用范圍,但必須控制其摻量,確保強度損失較小。
  19. The assumption about deformation character and constitutional relationship of high strength concrete and reinforcement under elevated temperature is proposed making use of the general regularity of high strength concrete compression - flexure member. the ultimate load capacity and deformation of high strength concrete compression - flexure members under elevated temperature are analyzed by means of full - range and non - linear analysis method. the computing results and test data are in good agreement

    根據壓彎構件的一般規律,給出了和鋼筋變形特徵的假設和本構關系,利用全過程非線性分析方法分析了壓彎構件的極限承載力和變形,計算結果與試驗結果吻合較好。
  20. Adopting fd - 1 admixture, c50 concrete can be obtained, which has excellent adaptability for environment temperature ? 5 c ; self - shrinkage of concrete is inevitable, and its variation tendency based on w / c and hydration age, fd - 1 has wonderful inhibition for self - shrinkage, and meanwhile anti - friction property can be promoted

    在fd - 1組分對負的耐久性能研究中,認為影響自收縮的主要因素是水灰比和齡期; fd - 1外加劑對水泥自收縮有很好的抑制作用,能夠有效的提水泥砂漿的耐磨性能。
分享友人