高溫養護法 的英文怎麼說

中文拼音 [gāowēnyǎng]
高溫養護法 英文
high temperature curing
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : Ⅰ動詞1 (供養) support; provide for 2 (飼養; 培植) raise; keep; grow 3 (生育) give birth to ...
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 高溫 : high temperature; elevated temperature; hyperthermia; megatemperature; inferno
  • 護法 : 1. (指1917年孫中山提出擁護約法) uphold the constitution2. (擁護佛法) protect and maintain the buddha -- truth
  1. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據層建築超厚底板大體積混凝土承受的差主要是均勻差和均勻收縮的特點,闡述了大體積混凝土度應力理論計算的簡化方和最大整澆長度的計算方,同時根據大體積混凝土度收縮應力基本公式和大體積混凝土結構施工經驗,提出了防止大體積混凝土度裂縫的五項技術措施。最後本文以廈門郵電大廈3 . 5m超厚底板施工為實例,從大體積混凝土度應力計算、混凝土保材料厚度計算、混凝土配合比的確定,鋼筋工程、模板工程、混凝土的泵送和澆築以及大體積混凝土內部度的監測和後期等方面進行了理論應用。
  2. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口度控制、運輸過程度控制、澆築過程的度控制以及混凝土澆筑後的和冷卻通水等一系列研究,提出景洪電站條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方
  3. 7. regularity of microscopic pattern in concrete after fire changing with temperature, standing time, cooling and curing process was studied by stereoscan test. it was summarized to predict temperature in fire based on microscopic structure subject to fire

    利用掃描電鏡分析試驗研究了火災后混凝土內部的微觀形貌隨受火度、靜置時間、冷卻及方式的變化規律,歸納了通過后混凝土的顯微結構特徵推定火災度的方
  4. It provided the reference to improve the anti - cracking capability of high strength and high performance concrete from the point of view of constructional technology and curing requirement. the result shows that the more the binder material or sand rate, the more serious the shrinkage cracking

    最後運用該軟體分析在外界濕度變化以及不同條件下,混凝土內部的濕度變化規律及其由此引起的度應力和濕度應力,為從施工上改善性能混凝土抗裂性能提供參考。
  5. The conclusion shows the method fits and the mineral admixture can reduce the pore porosity of concrete and improve the compactibility and freezing resistance of concrete

    結論對于混凝土冬季施工更合適未用自然變低的方,摻入適量的摻合料能使混凝土孔隙率顯著降低,使混凝土更加密實,提混凝土的抗凍性。
分享友人