高級公路 的英文怎麼說

中文拼音 [gāogōng]
高級公路 英文
high type highway
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : Ⅰ形容詞1 (屬于國家或集體的) state owned; collective; public 2 (共同的;大家承認的) common; gen...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 高級 : 1 (階段、級別達到一定高度的) senior; high ranking; high level; high; superb; higher; high stage...
  1. The research of the thesis shows : optimize theory describes and makes the target as model, array, level, and deals with every scheme that determines the nature and quantitative factor chosen in unison that appraised, its result is objective, true, reliable, can plan making policy to offer scientific basis finally of overall arrangement for the route of the highway ; the fuzzy comprehensive evaluation assessment is simple, clear, practical, can make more factors participated in judging, and overcome the subjective and random that existed when chosen the route scheme ; level analytic approach promises high grade highway route overall arrangement scheme judge and carries out the tr ansition to from single factor index multifactor synthesis of index judge, and the result is convincible

    論文研究表明:優化理論將描述與評價的對象模型化、序列化、層次化,並統一處理各方案比選中的定性與定量因素,其結果客觀、真實、可靠,能為線規劃布局的最終決策提供科學依據;模糊綜合評判方法簡單、清晰、實用,能使更多的因素參與評判,克服了線方案選擇時存在的主觀隨意性;層次分析法做到線布局方案由單因素指標評判過渡到多因素指標的綜合評判,結果具有說服力。
  2. The high grade pavement has expericed three corse from flexible and rigid one to semi - rigidty quickly, even some low grade pavement takes the semi - rigity material as its base

    面經歷柔性面和剛性面,現在已向半剛性瀝青面快速發展。目前甚至有些低面也採用半剛性材料做基層。
  3. The study of highway roadbed earthwork construction method

    基土方施工方法的研究與探討
  4. On now to a technological creation from nineteen ninety - five. the video artist nam june paik called it " electronic superhighway : continental u. s. alaska, hawaii.

    現在我們來看一幅1995年的科技創作品。錄像藝術家白南準稱其為「電子超:美國大陸,阿拉斯加州,夏威夷群島」 。
  5. In recent years, as the construction of express highways, the geologic hazards occur frequently

    近年來,隨著我國對的大量建設,由此而產生的地質災害也層出不窮。
  6. Elementary analysis of the guide line measuring methods of wukui high class highway

    烏奎導線測量方法淺析
  7. Application of high liquid limit sandy soil on hgh grade highway

    液限砂質土在上的應用
  8. Directed against the jump disease at bridge abutment in the high - grade highway, for the first time, the paper puts forward the treatment method of the flexible approach slab, which is consisted of geocell

    針對我國橋過渡段橋頭跳車病害嚴重的現狀,本文首次提出了由土工格室構成的楔型柔性搭板處治技術。
  9. Those of multi - span, middle - length ( about 25 - 40 metres ) are of large percentage among advanced bridges. simply - supported girder bridges with continuous decks are inferior to those of continuous girders because their decks crack easily. owing to the complex construction of continuous girder bridges, which is laboursome and time - consuming, people have been thinking about an approach to combining the advantages of the two so as to speed up the building and reduce the work procedures

    橋梁中,多孔中等跨徑(跨徑在25 40米左右)的橋梁占很大的比重,橋面連續的簡支梁結構體系由於存在橋面容易開裂等缺點而在與連續梁結構體系的競爭中常常處于下風。
  10. On construction equipment of asphalt rood surface of high - degree way

    瀝青面面層施工設備選用要點
  11. A recommend value of appropriate roadbed height is put forward according to the sand dune type and the highway grade, make investigation to the sand harm and other problems of built highways in desert areas gathering the related materials of present day highways, and then make comprehensive and systematic statistics to related data and racious factors which affect the roadbed height ; analy the suitable roadbed height for the windblown sand drift passes through smoothly according to the open country windblown sand field test ; test and verify the outcome according to indoor wind tunnel test ; finally a appropriate recommend roadbed height value will be put forward for different grade highways in different areas, which is according to the analysis of roadbed stability the roadbed height economic analysis and different use requirement to different grade highways

    收集現有沙漠的有關資料,對全國已建沙漠進行沙害及其他病害調查,對相關數據和影響沙漠度的各種因素進行綜合系統地統計分析;通過野外風沙流場測定,分析適宜風沙流順利通過的度;通過室內風洞試驗進行驗證;結合基穩定性分析、度的經濟性分析,考慮不同等的使用要求,最終提出不同地區不同等沙漠基填土度的合理度建議值。
  12. The research test of this discussion as follows : making investigation and research to overseas related materials ; make investigation to built highways in desert areas, dozens of routes and nearly 100 road sections have been surveyed, among them two highways have been taken as the chief investigation objects, they are " 210 national highways - first grade highways from bao tou to dong sheng " and " the section of nei meng a la shan meng s307 from shang de to meng gen " ; the relationship between windblown sand drift and the roadred height wind tunnel test ; make investigation to the tested road sections and subengineerings then make statistics and study according to the test outcome ; the stability analysis of different roadbed height ; the analysis of roadbed economy

    本課題的研究工作包括:對國外相關資料的調研分析;對已建沙漠地區進行調查、觀測了十余條線,近百段段,以『 210國道包頭至東勝一』 、 『內蒙阿拉善盟s307尚德至孟根段』為主要調查對象;風沙流度的關系、風洞試驗;對調查段及依託工程調查、觀測結果統計研究;不同度下基穩定性分析;基經濟性分析;按照沙丘類型及提出基合理度推薦值。
  13. The chinese have built the airport and the freeways, and now they are building the city which will succour them, a supercity, a chinese new york the likes of which asia has never seen

    中國人修建了機場和,現在他們正在修建可以容納自己的城市,一個超城市,一個中國人從未見到過的中國式的紐約。
  14. The road we have long been traveling is smooth superhighway on which we progress with great speed, but at its end lies disaster.

    我們一直在走的這條表面上很好走,是一條平坦的超,我們可以速前進,但是走到盡頭卻要遇到災難。
  15. A superhighway will be constructed next year

    明年將要修建一條超
  16. Through specification and project fact, this paper puts forward 3 terms of superelevation easement curves for establishing in high grade highway mute design, and then deduce a critical formula, in order to treated separately to establish superelevation easement curves

    摘要通過結合規范和工程實際,提出對線設計中超緩和段設置的三個條件,並推導出臨界判斷式,以便在超緩和段設置時區別對待。
  17. The reason for badly load - repaid ability includes illogical traffic design, less government investment, unapt classificatory proportion of toll road, high charging cost, vehicle diffluence because of the completion of highway construction, etc. part iv research on how to improve debt solvency

    論述了規劃設計不合理,政府投入不足,收費還貸結構不合理、二收費比重過大,收費成本過車輛分流等原因導致收費還貸償債能力低下。第四部分,提償債能力的對策研究。
  18. With the rapid development of the economic construction in our country, high - grade highway construction is evolving with unexampled speed, a lot of highway pass soft soil zone

    隨著我國經濟建設的飛速發展,的建設迎來了前所未有的發展速度。絕大多數都要經過軟土地區。
  19. The soil - rock foundation was applied in highway of changde - zhangjiajie, and in order to assure soil - rock foundation quality by shocking and compaction test, different virtual height of soil - rock foundation was constructed and it ' s quality was controlled for in - situ test, it was considered as parameter for virtual height, shocking and compaction quantities, shocking and compaction sediment rate and maximum diameter of packing materials

    摘要針對常張採用沖擊壓實技術壓實土石混填基的問題,選取試驗段進行了不同虛鋪厚度基的施工工藝及質量控制等試驗研究,提出了虛鋪厚度、沖壓遍數、沖壓沉降率(單沉降量) 、填料最大粒徑等施工控制參數。
  20. Back - analysis of settlement monitoring of foundation in harbin expressway

    哈爾濱基沉降監測反分析
分享友人