高級壞工程 的英文怎麼說

中文拼音 [gāohuàigōngchéng]
高級壞工程 英文
msc in advanced mechanical engineering
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : Ⅰ形容詞1 (不好的; 惡劣的; 使人不滿意的) bad 2 (表示程度深 多用在表示心理狀態的動詞或形容詞後面...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 高級 : 1 (階段、級別達到一定高度的) senior; high ranking; high level; high; superb; higher; high stage...
  1. Beijing seven - color ring technology products television limited is the development, production, marketing, and system engineering for the main business, the renowned products of complete autonomy in r & d and production arm of a large series of video products, its overall performance can be fully verified, the process equipment and its key components are world - class manufacturers, by the authority of physical abnormalities destructive testing and the safety of a number of patented technologies, a declaration rocker flying boat full compatibility broadcasting class, professional - level film cameras, video cameras, small hdtv cameras, boom achieve the same product serialization

    北京七色光環科技發展有限公司是影視產品的開發、生產、銷售、及系統為主營業務,產品有享譽中外的完全自主研發生產的大型影視搖臂系列產品,其整機性能得以充分驗證,其藝設備及其關鍵部件均由世界一流的廠商提供,通過權威物理異常破性的安全測試及多項專利技術的申報,飛行船搖臂全面兼容廣播、專業膠片攝影機、攝像機,小型清攝像機,實現了同一臂型產品系列化!
  2. Most damage of construction is due to the crack, so people always consider the beginning of crack as the sign of danger, it always makes people fear. with the development of economy in our country, the dimensions of construction is larger and larger, and the engineering is growing towards large - scale and complexity, because the refresh of material of concrete, the strength of concrete is improved, but a lot of crack appears in the engineering. in recent years, as the further development of economy in our country, the need of steel in the engineering is increscent, but the supply of steel in our country can not satisfy with the need, the price of steel is continuously rising, so it gives us a problem, we must save steel in designing construction and simultanentily controlling the crack of construction. so it gives us a new question on crack study

    由於建築物的破往往始於裂縫,所以人們一般把裂縫的出現視作危險的徵兆,裂縫使人們產生恐懼感。隨著國家經濟的發展,建設規模越來越大,結構朝著大型化、復雜化的方向進展,隨著混凝土原材料的不斷更新,混凝土強度等的不斷提,在實際上出現了大量的裂縫問題。近年來隨著國家經濟的進一步發展,用於建設的用鋼量日趨增大,而國家的鋼材供應量不能滿足日趨增大的市場需求量,導致鋼材的價格不斷上漲,這就要求我們在節約鋼材用量的基礎上來設計控制中的裂縫問題,這也就給裂縫研究提出新的課題。
  3. 2005 4 over 500 glazes protection emergency repairing remodeling glazing reglazing refinishing of luxurious washlet ; pedestal sink tub and bathtub s project - crowne plaza shanghai

    超過500件連體座便器;浴缸;洗手盆的釉面保護釉面損修補釉面翻新
  4. Glazes protection emergency repairing of luxurious washlet ; pedestal sink tub and bathtub s project - courtyard by marriott shanghai - pudong

    座便器;浴缸;洗手盆的釉面保護釉面損修補
  5. In this paper, the state of the art of the engineering controlled explosion and the finite element method ( fem ) are reviewed. in order to analyze and simulate the demolishment of frame - structured buildings due to controlled blasting, the method of killing or activating elements, a high level technique in fem, and the special element - solid65 are introduced to the blasting field first in china by the author

    本文回顧和總結了式控制制爆破和有限單元法的發展歷史及其研究現狀,在國內首次把單元生死法這一有限元處理技術和ansys軟體中特有的solid65單元引入到爆破拆除領域,用其進行框架結構樓房爆破拆除的計算機模擬,探討了構件在完全破前的應力、應變、裂縫生成和塑性鉸形成位置。
  6. Expansive soil is one kind of high plasticity clay which may bring civil engineering heavy damage. it may make construction, especially the engineering of high - type roadbed, appear failure deformation. it is a kind of long - term latent danger to people ' s life

    膨脹土是一種會給帶來嚴重破塑性粘土,特別是對公路路基和大型結構物所產生的變形破作用,往往具有長期、潛在的危險。
  7. Provided that when damage to the ship is discovered at a port or place of loading or call without any accident or other extraordinary circumstance connected with such damage having taken place during the voyage, then the wages and maintenance of master, officers and crew and fuel and stores consumed and port charges incurred during the extra detention for repairs to damages so discovered shall not be admissible as general average, even if the repairs are necessary for the safe prosecution of the voyage

    如果船舶的損是在裝貨或停靠港口或地點發現的,而且航中沒有發生過與此項損有關的任何意外事故或其他特殊情況,則在修理上述損的額外停留期間所支付的船長、船員和一般船員的資、給養和消耗的燃料、物料和港口費用不得認作共同海損,即使這項修理是安全的完成航所必需的。
  8. This paper depends on the subject " study of the slope stability of express highways in southwest mountain areas ", studies the 13slopes of the guang yu express highway from hua ying to lin shui which is built in southwest mountain areas. on the basis of research production of predecessor, this paper further studies natural geologic enviroment condition, basic features, the types of the slopes " destroy and genetic mechanism

    本文依託「西南山區公路邊坡穩定性分研究」課題,以在西南山區修築的廣渝公路華鎣鄰水段13處山區公路邊坡為研究對象,結合前人的部分研究成果,進一步研究了廣渝路華鄰段13處巖質邊坡的自然地質環境條件、基本特徵及變形破類型和成因機制。
  9. The reservoir - induced earthquake magnitude is usually ! low but its epicentral intensity is high and is nearby important equipments. so it can destroy seriously project and induce secondary disasters

    由於水庫誘發地震震中都緊鄰重要水利設施,且震源淺,震中烈度,所以雖然震大部分不仍然可造成大的破
  10. Provided that when damage to the ship is discovered at a port or place of loading or call without any accident or other extraordinary circumstance connected with such damage having taken place during the voyage, then the wages and maintenance of master, officers and crew and fuel and stores consumed during the extra detention for repairs to damages so discovered shall not be admissible as general average, even if the repairs are necessary for the safe prosecution of the voyage

    如果船舶的損是在裝貨或停靠港口或地點發現的,而且航中沒有發生過與此項損有關的任何意外事故或其他特殊情況,則在修理上述損的額外停留期間所支付的船長、船員和一般船員的資、給養和消耗的燃料、物料不得認作共同海損,即使這項修理是安全的完成航所必需的。
  11. In the relently twenty years, in pace with the high development of highway and hydroelectric power station, being inevitable decompose to terrain and landforms, decomposed slope s steady and impelled into being and developing of landslip. thereby giving project security to bring the grave effect, condition the projects rate of aduance, ading the project invests, at the same time also probably creates great wealth loss and the personal safety

    近二十年來,隨著公路和大型水電站事業的迅速發展,不可避免地對邊坡地形地貌產生破,給邊坡穩定性造成潛在威脅,有的甚至產生滑坡,從而給安全性帶來了嚴重影響,制約了進度,增加了投資,同時也可能造成重大的人身安全和財產損失。
  12. With the rapid development of the construction of high level highways, more and more highways are built on the soft foundation. the quality of sft ( soft foundation treatment ) directly affects the quality and the time limit of the project

    隨著公路建設的迅速發展,愈來愈多的速公路修建在軟土地基上,軟土地基處理好將直接影響到期限與質量,軟基處理新技術的研究成為一個亟待解決的課題。
分享友人