鬆土工 的英文怎麼說

中文拼音 [sōnggōng]
鬆土工 英文
loosening earthwork
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. The dump vehicle is suit to load and disoharge the piled material, such as the loose soil, finc sand, fertilizsr, waste. so it can be wildly used in many fields, such as construction site, iuad maintenance, municipsl works, railroad consiruction, dock transport, brickfield, and carry in warehouse, it can be used in many cngineering construction, stch as water conservancy project, onvirenment engineering and gardens. it is the ideal shourt haul means within 1 km

    該產品適用於裝卸、細砂、肥料、垃圾、水泥等成堆堆放的物料,因此是廣泛用於建築施、公路養護、市政程、鐵路建設、碼頭運輸、窖廠作業、倉庫搬運以及水利、環衛、園林等程建設,是運輸半徑為1km以內理想的短途運輸具。
  2. On the basis of the concept and analysis method of slope geological structure, four typical slope geological structures are selected by some investigations on more than one hundred high rock slopes in the motorway project. these structures are thick sandstone stratum, stratum including weak coal, stratum made of red or brown plastic clay and soft rock mass and stratum made of remnants rock mass. the practical slope geological structures are compact basis of geological mechanical model for the analysis of relaxation zone in high rock slope projects

    在介紹了坡體結構概念並提出建立坡體結構方法的基礎上,根據對京珠高速公路粵境北段路塹高邊坡程中百余處巖石高邊坡的調查總結,選擇了其中較為具有代表意義的厚層砂巖、煤系地層、紅地層及殘坡積層路塹高邊坡共4類巖石高邊坡作為研究對象,為對巖石高邊坡開挖弛區的分析打下了堅實的實際地質力學模型基礎。
  3. At present plenty of experimental study has been made on the materials and structural performance of asphalt concrete cores in the world, and the design methods and construction technique as well as equipments have been more mature. however, there is still lack of the research of its basic performance. in this thesis, in combination with the actual project, the experimental study has been employed with the field core specimen and the specimen made in laboratory, mainly include the static triaxial test, confinement pressure stabilization test and stress relaxation test

    目前,國內外對瀝青混凝心墻的材料和結構性能已進行了一些試驗研究,其設計方法、施藝和設備較為成熟,但其基本性能研究方面顯得較為薄弱,本文結合實際程對瀝青混凝心墻的芯樣和試驗室成型的試件進行了試驗研究,主要包括靜三軸試驗、圍壓穩定試驗以及應力弛試驗研究,得到以下基本結論: 1
  4. They are not only satisfied with our scarifiers and rust removal tools. they are impressed

    他們不但對我們的機和除塵具感到滿意,也被我們的產品深深打動!
  5. In this paper, three kinds of static test operations are given such as the shovel descended with the front - end of the bulldozer lifted, the ridger descended with the rear - end of the bulldozer lifted, the shovel and the ridger descended with the whole body of the bulldozer lifted the static tests for the frame of ty220 bulldozer are proceeded. the result of finite element analysis is contrasted with that of experiment the mechanical model and the result of finite clement analvsis are verified by experiment and the theoretical bases are provided for the improving design of frames 4 according to the results of calculations and tests, the suggestion is presented for improving the design of the frame of ty220 bulldozer

    給出了鏟刀下移推機前端抬起,器下移推機所端抬起,鏟刀、器同時下移推機整機抬起等三種靜態試驗況,對推機臺車架進行了靜態試驗,並將實驗結果與有限元計算結果進行了比較,驗證了力學模型及有限元分析結果的正確性,為臺車架的設計提供了一定的理論依據。
  6. Our fine quality tools can be used as a concrete grinders, scarifiers, paint chippers, needle scaler and paint remover

    出產的優質具可用作混凝磨光機機油漆鑿刀針束除銹機和除漆裝置。
  7. A long - handled implement with a row of projecting teeth at its head, used especially to gather leaves or to loosen or smooth earth

    耙子,耙機頂部有一排凸出的齒的長柄具,尤指用於收集樹葉或疏壤的
  8. ( 1 ) based on the experiments, this thesis discusses the stress loss of vertical prestress caused by deformation of anchorage, the resilience of the tendon and the joint compression ( l2 ), the elastic compression of the concrete ( l4 ) and the relaxation of the tendon ( l5 ). it is concluded that the anchorage deformation is dominated in vertical stress loss. measures are suggested to diminish the loss of the vertical prestress during the design and construction of the bridge

    ( 1 )本文在試驗的基礎上,研究了豎向預應力筋的錨具變形、鋼筋回縮和接縫壓縮損失l2 、混凝的彈性壓縮損失l4和力筋的應力弛損失l5 ,其中,第一項是最主要的損失,論文據此對設計和施中如何減小豎向預應力的損失提出了自己的看法和建議。
  9. Py160c grader is mainly used for land levelling, ditching, slop scraping, bulldozing, ripping, snowremoving in large areas of highway, airport, farmland etc, it is mecessary equipment for farmland improving

    Py160c型平地機主要用於公路,機場,農田等大面積平整和挖溝,刮坡,推、除雪等作業及農田改良所必須的程機械設備。
  10. Coarse grained soil is composed of sand and gravel, stone residual, blasted stones etc., which has a characters of less cohesive force among grains and strong ability of water penetration. it is a kind of soil of loose grain structure with better utilization properties in the engineering

    粗粒是指砂礫石、砂卵石、石渣、爆破開採的石料等粗顆粒石混合料,具有粗顆粒間粘結力小、透水性強的性質,是一種散的顆粒狀結構,具有良好的程使用性能。
  11. Preparation for construction : the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2 3 times within full - width range of the subgrade with vibrating roller before the construction, as well as test the compaction and defecting, to check whether there is unqualified point in the soil base

    準備:施前下承層表面要平整、堅實,符合設計要求,無散材料和軟弱地點,施前要用振動壓路機在路基全寬范圍內復壓2 3遍,同時進行壓實度及彎沉檢驗,檢查基中是否有不合格點。
  12. Abstract : because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process

    文摘:神府東勝礦區位於黃高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態
  13. Because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process

    神府東勝礦區位於黃高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態
  14. Geotechnical investigation and testing - laboratory testing of soil - part 8 : unconsolidated undrained triaxial test iso ts 17892 - 8 : 2004 ; german version cen iso ts 17892 - 8 : 2004

    調查和試驗.壤的實驗室試驗.第8部分:散的不
  15. In order to restrict the displacement of relaxed rock effectively, the factors affecting the efficacy of anchor measures are analyzed according to mechanism of action of anchor. in terms of principle orthogonal design, the influence of parameters of anchor to displacement of excavation slope are elevated by computing using finite element method simulation, and the optimal scheme of anchoring parameters including length of anchors and space between bolts and thickness of shot concrete are defined. finally, the optimal scheme of anchor parameters are determined with considering results of theory analyse and numerical calculation, which provide theory bases for engineering

    為了有效防治邊坡開挖后巖體的弛變形,根據錨桿的作用機理對影響錨固效果的主要因素進行分析,並利用處理多因素試驗的科學方法?正交設計原理,以有限元數值計算為手段,以有效約束邊坡開挖位移為標準,評價了錨桿長度、錨桿間距、混凝噴層厚度等錨固參數對邊坡變形的影響大小和規律,經過比較分析最終提出了錨固參數的優化設計方案,為程設計提供了理論指導。
  16. The stockpile of opencast coal mine is a kind of huge artificial loose dump, which has the problems of serious soil erosion and instability

    大型露天煤礦排場是一種巨型人散堆積體,存在著嚴重的水流失和排場穩定問題。
  17. Huangmeishan tunnel is the controlling project of maanshan - wuhu expressway, and also the 1st large span twin - arch tunnel constructed under the condition of shallow burying soft surrounding rocks in anhui province. the depth buried at the port of the tunnel is shallow, and it is covered with accumulated and disposal soil

    黃梅山隧道是馬蕪(馬鞍山?蕪湖)高速公路控制程,是安徽省在淺埋軟弱圍巖條件下修建的第一條大跨度雙連拱隧道。隧道洞口段埋深淺,且為坡積物和人覆蓋,圍巖散,自承能力差。
  18. This paper which is based on these facts that in qinhuangdao the surface layer of cement concrete pavements have been loosed and destroyed because of snowfall and splashing salt in winter analyzed the causes deeply. the causes include physics factors, chemistry factors and construction factors that are caused by defects of our conventional construction

    本文根據秦皇島市水泥混凝路面由於冬季降雪、噴灑除冰鹽而引起的表層散破壞的現狀,從物理、化學及傳統的施藝不足等因素,進行了理論分析,以此來確定水泥混凝路面表層散是否需要補強或功能性養護。
分享友人