鬆土設備 的英文怎麼說

中文拼音 [sōngshèbèi]
鬆土設備 英文
scarifier attachment
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. At present plenty of experimental study has been made on the materials and structural performance of asphalt concrete cores in the world, and the design methods and construction technique as well as equipments have been more mature. however, there is still lack of the research of its basic performance. in this thesis, in combination with the actual project, the experimental study has been employed with the field core specimen and the specimen made in laboratory, mainly include the static triaxial test, confinement pressure stabilization test and stress relaxation test

    目前,國內外對瀝青混凝心墻的材料和結構性能已進行了一些試驗研究,其計方法、施工工藝和較為成熟,但其基本性能研究方面顯得較為薄弱,本文結合實際工程對瀝青混凝心墻的芯樣和試驗室成型的試件進行了試驗研究,主要包括靜三軸試驗、圍壓穩定試驗以及應力弛試驗研究,得到以下基本結論: 1
  2. Garden equipment - pedestrian controlled aerators and scarifiers - safety

    園藝.可以在側面步行操縱的通氣機和機.安全
  3. Garden equipment - pedestrian controlled lawn aerators and scarifiers - safety

    園藝.可在側面控制的草坪通氣機和機.安全
  4. Garden equipment - pedestrian controlled lawn aerators and scarifiers - safety ; german version en 13684 : 2004

    園藝.可在側面控制的草坪通氣機和機.安全
  5. Py160c grader is mainly used for land levelling, ditching, slop scraping, bulldozing, ripping, snowremoving in large areas of highway, airport, farmland etc, it is mecessary equipment for farmland improving

    Py160c型平地機主要用於公路,機場,農田等大面積平整和挖溝,刮坡,推、除雪等作業及農田改良所必須的工程機械
  6. Preparation for construction : the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2 3 times within full - width range of the subgrade with vibrating roller before the construction, as well as test the compaction and defecting, to check whether there is unqualified point in the soil base

    施工準:施工前下承層表面要平整、堅實,符合計要求,無散材料和軟弱地點,施工前要用振動壓路機在路基全寬范圍內復壓2 3遍,同時進行壓實度及彎沉檢驗,檢查基中是否有不合格點。
分享友人