黃土坑 的英文怎麼說

中文拼音 [huángkēng]
黃土坑 英文
huangtukeng
  • : Ⅰ形容詞(像絲瓜花或向日葵花的顏色) yellow Ⅱ名詞1 (指黃河)short for the huanghe river:黃泛區the...
  • 黃土 : [地質學] loess黃土保持 loess conservation; 黃土地 loessland; 黃土地基 loess foundation; 黃土地貌 ...
  1. Shx 844, ocean park road, wong chuk hang

    海洋公園道shx844號
  2. Shx 844 and rbl 1020, ocean park road, wong chuk hang

    海洋公園道shx 844號及rbl1020號
  3. White wall and golden tiles characterize the tai wong ye temple at wong chuk hang. the exterior walls of this concrete structure were inlaid with various porcelain pictures expressing religious dedication

    大王爺廟白墻金瓦,用三合建成,外墻鑲有善信奉獻的瓷畫多幅,建築形式較為現代化。
  4. In this paper, 8 - node isoparametric quadrilateral element is used to divide the soil and retaining structure. comparing to practical engineering, the numerical method - finite element method is used to analyze every behavior of deep foundation excavating and retaining in loess area

    本文採用八結點四邊形等參元來離散體與圍護結構,用有限元數值方法,對照實際工程,對地區深基開挖與支護體系的各種性狀進行了分析。
  5. So, the following questions such as : how to simulate the process of excavating and retaining of the deep foundation pit engineering, how to calculate and analyze the pressure and deformation of the surrounding soil, how to calculate and analyze the deformation of retaining structure in the course of excavating, how to predict the earth subsidence and the swelling of pit bottom, and how to predict the deflection of surrounding pipes in loess area, are all worth researching

    地區深基工程技術與理論研究尚處于起步階段,因此如何對地區深基開挖與支護過程進行模擬,對深基周圍體的壓力、變形及支護結構的變形隨基開挖過程所發生的變化進行計算與分析,對地表面的沉降和底的隆起、周圍管線的變位進行預報則成為一個值得研究的課題。
  6. At last, the law of deformation of pit bottom and surrounding surface in different stress state and in different excavating step is obtained, and the same to the saturatin g process of surrounding soil. to some extent, in predicting the deformation of surrounding soil and retaining structure in construction, in preventing the foundation pit accident from happening, in insuring the security of environment and regular use of pipes underground, and in giving advice to deep loess foundation pit engineering in practice, the conclusion is of theoretical and practical value

    得出了不同應力狀態下和不同開挖步驟時以及基周圍浸濕過程中深基底及基周圍地表的變形規律,所獲得的結論對于深基施工過程中周圍層及圍護結構的變形預測,防止深基事故的發生及周圍環境的安全與地下管道的正常使用,指導深基工程的實踐具有一定的理論和實踐參考價值。
  7. 2. the concept design is the key phase of the first stage of system optimization. the paper emphatically discusses with emphasis several issues difficulty to answer, such as the determination of the soil parameters, the soil pressure and the safety factor and the reliability of retaining structure, summaries and analyses the main geotechnical problems during the excavation on the four familiar geologic strata of saturation soft soil on the class i terrace of the yangtze river, aged - clay, expansive soil and loess and investigates carefully the patterns of deformation and destruction of pit slope in the saturation soft soil, puts forward three basic principles of selecting schemes of retaining structure, namely : facing to the problem, facing to the characteristics of excavation and environment

    ( 2 )概念設計是深基工程第一步優化? ?系統(方案)優化設計中的關鍵,文中重點討論了概念設計中的幾個難點問題,如性參數的確定、壓力的選取、深基工程的安全度和可靠度分析等;總結分析了飽和軟、老粘性、膨脹這四類常見地層條件下的深基工程中的主要巖工程問題,其中重點研究了長江級階地上的飽和軟深基邊坡變形和破壞模式,提出了選擇支護方案的基本原則,即:面向問題、面向基特點、面向周邊環境特點。
  8. According the data of actual project and integrating the approximately earth pressure of loess area, this thesis compile a series of lanzhou loess area support program with c + + and the method of criterion. analyzed and calculated many actual projects with the program, monitoring the procedure and collecting the data in some works to perfect the program and work hard to make it to sale. according cantilever supporting pile, one - anchored supporting pile and soil nails support of loess area, this thesis select the best support method and structure form

    本文從實際工程出發,根據規范中的極限荷載設計法結合地區深基的近似實際壓力分佈情況,用c + +語言編制一套適合蘭州地區深基支護的計算機輔助設計程序,用本程序分析計算了多個實際工程,並在這些實際工程的基開挖過程中實行信息監測,收集有關數據以回歸檢驗研究成果以及完善這套程序,使其能真正的應用到實際工程,并力爭使其商品化。
  9. Basing on analysis of the situation of water resources in loess plateau areas, this paper propounded the engineering and agricultural technology and the method with direct and indirect, which draw rainwater on road surface into " soil reservoir " of farmland or water cellar with free atmospheric pressure using silt delve of eliminate energy

    摘要通過對高原水資源現狀分析,提出了採用消能淤泥,通過直接、間接將路面雨水引入農田「壤水庫」或時空可調節的自壓式集流水窖等貯水設備中,並採用一定的耕作農藝措施將路面雨水利用到農田中的方法和技術。
  10. This thesis will play a very big leading role and have engineering practical value on pit - jacked pile rising to replace in the northwest loess. but at the same time, much work will need to perfect it, in order to draw much large lessons from the work to guide the practical engineering

    本文的課題對式靜壓樁在西北場地多、高層建築項升糾偏中的推廣應用具有很大的指導意義和工程實用價值,但同時,今後仍然需要做很多的工作來完善它,以便對工程具有更大的借鑒意義。
分享友人