  1. Big drops were dripping from a broken waterspout, and a ray of gaslight slipped from mme bron s window and cast a yellow glare over a patch of moss - clad pavement, over the base of a wall which had been rotted by water from a sink, over a whole cornerful of nameless filth amid which old pails and broken crocks lay in fine confusion round a spindling tree growing mildewed in its pot

    大滴大滴的水珠從水管的裂縫中滴下來。一道煤氣燈的燈光從布太太的窗子里射進來,把一段長了苔蘚的路面一段被廚房的排水溝的污水侵蝕了的墻根及整個堆滿了垃圾的角落映成了色,垃圾中有舊水桶和破碎罐,一破鍋內竟然長出了一棵瘦小的衛矛。
  2. Join us on a trip to the major tourist spots or sites of historical interests in china such as the tiansha prairie, yangguan checkpoint, hukou fall of.

    分別展現天山牧場陽關河壺瀑布圓明園巴音布魯克草原樂山大佛外漢夜景安岳臥佛天等大自然的莊麗風光及鬼斧神工。
  3. Taking into account of water level and temperature, horizontal displacement monitoring control index of typical monolith of huangtankou concrete gravity dam is determined by the improved method of probability, which can be used as a reference for dam safety monitoring

    綜合考慮水位溫度對壩體位移的影響,採用改進小概率法,擬定了黃壇口重力壩壩頂水平位移監控指標,為今後一定時段內大壩安全監控提供參考。
  4. Through analyzing the seepage observation data of huangtankou concrete gravity dam, foundation seepage behavior are reasonably evaluated. the reason of seepage force rising of individual monolith is impervious elements " flaw and drain holes " block. 4

    分析黃壇口大壩壩基滲流監測資料,正確評價了壩基防滲排水系統的工作狀態,指出了個別壩段滲透壓力升高是由於壩基防滲帷幕缺陷和排水孔被堵造成,為工程加固提供了科學依據。
  5. Join us on a trip to the major tourist spots or sites of historical interests in china such as the tiansha prairie, yangguan checkpoint, hukou fall of yellow river, leshan buddha, the bund of shanghai, an yue sleeping buddha, tian tan heaven podium park, di tan earth podium park

    分別展現天山牧場陽關河壺瀑布圓明園巴音布魯克草原樂山大佛外漢夜景安岳臥佛天等大自然的莊麗風光及鬼斧神工。
  6. 2. horizontal displacement variation rules according to water level and temperature are researched by analyzing that of huangtankou concrete gravity dam. 3

    通過對黃壇口混凝土壩水平位移的變化過程分析,研究了壩頂水平位移隨水位、溫度等環境量的變化規律。
  7. Mathematics statistic model of the main observation variables and horizontal displacement hybrid model of typical monolith of huangtankou concrete gravity dam are established. through model analysis and parameter inversion, taking into account of water level and temperature, deformation monitoring control index of typical monolith is determined by the improved method of probability. the primary contents are as follows : 1

    建立了黃壇口混凝土重力壩主要觀測量的數理統計模型和典型壩段水平位移混合模型等,通過對各數學模型的分析和參數反演,綜合考慮水位溫度採用改進小概率法擬定了典型壩段水平位移的監控指標,得到一些有益的結論,其主要內容如下: 1