黑龍壩 的英文怎麼說

中文拼音 [hēilóng]
黑龍壩 英文
heilongba
  • : Ⅰ名詞1 [動物學] (古代傳說中的神異動物) dragon2 (古代巨大的爬行動物) a huge extinct reptile:恐...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. The studying on the mechanism of beiyin main channel gliding slope heilongjiang beiyin project lies in the west of heilongjiang which lies the center of nenjiang. geographical location is east longitude 124 - 126 ? and north latitude 46 - 48 ?. aims of the project are providing water to petrol and chemical industry of daqing and living water. at the same time it is also a big comprehensive conducting water project without dam which resolves 24 irrigation regions of beiyin using water along beiyin

    江省北部引嫩工程位於江省西部,地處嫩江中游左岸的松嫩平原腹地,地理位置在東經126度128度,北緯46度48度之間。該工程以滿足大慶石油和化工生活用水為主,同時解決沿途24個分灌渠用水的綜合性大型無引水工程。
  2. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面板堆石施工技術研究方面的不足,結合我國江省牡丹江上的蓮花水電站,面板堆石的施工實踐,通過施工的原型實驗,對砼面板堆石在嚴寒條件下的施工技術進行了研究和總結。
  3. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石均有其獨特之處。蓮花工程位於江省牡丹江流域,首創了高寒地區修建大型面板堆石的成功記錄,解決了一系列國內外均無先例的難題。
  4. Ice jam flood in heilongjiang and the songhua river in

    1957年江及松花江區域性冰凌汛初步分析
分享友人