黑龍壩 的英文怎麼說
中文拼音 [hēilóngbà]
黑龍壩
英文
heilongba-
The studying on the mechanism of beiyin main channel gliding slope heilongjiang beiyin project lies in the west of heilongjiang which lies the center of nenjiang. geographical location is east longitude 124 - 126 ? and north latitude 46 - 48 ?. aims of the project are providing water to petrol and chemical industry of daqing and living water. at the same time it is also a big comprehensive conducting water project without dam which resolves 24 irrigation regions of beiyin using water along beiyin
黑龍江省北部引嫩工程位於黑龍江省西部,地處嫩江中游左岸的松嫩平原腹地,地理位置在東經126度128度,北緯46度48度之間。該工程以滿足大慶石油和化工生活用水為主,同時解決沿途24個分灌渠用水的綜合性大型無壩引水工程。In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province
本文針對嚴寒地區砼面板堆石壩施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花水電站,面板堆石壩的施工實踐,通過施工的原型實驗,對砼面板堆石壩在嚴寒條件下的施工技術進行了研究和總結。For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved
如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。Ice jam flood in heilongjiang and the songhua river in
1957年黑龍江及松花江區域性冰壩凌汛初步分析分享友人