acceptance inspection 中文意思是什麼

acceptance inspection 解釋
接收檢查
  • acceptance : n. 1. 接受;驗收2. 答應,承認;(政黨候選人)接受提名。3. 【商業】承兌,認付(期票)。
  • inspection : n. 1. 檢查,檢驗;審查。2. 檢閱,視察;參觀。
  1. The hirer shall conduct acceptance inspection of the work product

    定作人應當驗收該工作成果。
  2. Jute yarns and threads - acceptance inspection regulations

    黃麻麻紗線的驗收規定
  3. Jute yarns and threads - acceptance inspection regulation

    黃麻麻紗線的驗收規定
  4. Specification for thermal spray equipment acceptance inspection

    熱噴塗設備驗收檢驗規范
  5. Upon completion of the construction project, the developer shall conduct acceptance inspection according to the construction drawings and specifications, and in accordance with the rules of construction inspection and quality inspection standard prescribed by the state

    第二百七十九條建設工程竣工后,發包人應當根據施工圖紙及說明書、國家頒發的施工驗收規范和質量檢驗標準及時進行驗收。
  6. Acceptance inspection of class 2 alternating - current watthour meters

    2級交流電度表驗收檢驗
  7. Method of acceptance inspection for fasteners

    緊固件的驗收檢驗方法
  8. Thermal spraying. acceptance inspection of thermal spraying equipment

    熱噴塗.熱噴塗設備驗收檢驗
  9. Thermal spraying - acceptance inspection of thermal spraying equipment

    熱噴塗.熱噴塗設備的驗收檢驗
  10. Fasteners - acceptance inspection

    緊固件.驗收檢驗
  11. Welding - acceptance inspection of electron beam welding machines - measurement of beam current characteristics

    焊接.電子束焊接機的驗收檢驗.電子束電流特性的測量
  12. Welding - acceptance inspection of electron beam welding machines - part 3 : measurement of beam current characteristics

    焊接.電子束焊接機的驗收檢驗.第3部分:電子束電流特性的測量
  13. Aircraft assembling technology check and acceptance inspection for solid rivet after riveting

    飛機裝配工藝.實心鉚釘鉚接后的檢查及驗收
  14. Acceptance inspection, marking and packaging of fasteners

    緊固件驗收檢查標志與包裝
  15. Acceptance inspection for direct connected alternating current static watt - hour meters for active energy classes 1 and 2

    1和2級直接接入靜止式交流有功電度表驗收檢驗
  16. Compile the inspection and test plan of components purchased including process inspection and final acceptance inspection

    制定采購部件的檢驗試驗計劃,包括過程檢驗和最後驗收程序的計劃。
  17. Electronic components printed boards. characteristics and acceptance inspection of a production master

    電子元件.印刷電路板.生產標準板的特性和驗收檢驗
  18. Acceptance inspection, marking and packing for electric power fittings

    電力金具驗收規則,標志與包裝
  19. Contractor completes works according to its requirements, and then client should arrange the works acceptance inspection within 7 days

    承包人按本合同完成本工程驗收要求的,發包人應在七天內組織本工程驗收。
  20. Welding - acceptance inspection of electron beam welding machines - measurement of welding speed

    焊接.電子束焊接機的驗收檢驗.焊接速度的測量
分享友人